Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Feb 6, 2026 |
| Due Date: | Mar 6, 2026 |
| Solicitation No: | 36C24226R0033 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Feb 06, 2026 05:44 pm EST
- Original Date Offers Due: Mar 06, 2026 12:00 pm EST
- Inactive Policy: Manual
- Original Inactive Date: Jun 04, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z1DA - MAINTENANCE OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
VA PROJECT NO. 528A8-18-801
RENOVATION FOR CARDIAC CATH AND VIR
This Scope of work is for construction services for the completion of project 528A8-18-801: Renovation for Cardiac Cath Lab and Vascular Interventional Radiology Lab located at the Albany VA Medical Center 113 Holland Avenue, Albany NY 12208. All work shall be completed within 790 calendar days from issuance of the Notice To Proceed.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION:
Work includes all labor, material, equipment and supervision to perform:
1. The required general construction work on this project including, but not limited to, demolition of existing architectural items, new walls, new floor, new ceilings, new finishes, temporary facilities and any other addition/demolition alterations necessary for a complete and operable system.
2. The required mechanical construction work on this project including, but not limited to, demolition of existing HVAC and hydronic systems, new constant volume air terminal units, new ductwork, new hydronic piping, new controls, new pressure monitoring equipment and any other addition/demolition alterations necessary for a complete and operable system.
3. The required plumbing construction work on this project including, but not limited to, demolition of existing plumbing fixtures, demolition of domestic/sanitary/venting/medical gas/RO piping, new plumbing fixtures and any other addition/demolition alterations necessary for a complete and operable system.
4. The required fire protection construction work on this project, including but not limited to, demolition or relocation of existing sprinkler heads, new sprinkler heads, new fire protection piping and any other addition/demolition alterations necessary for a complete and operable system.
5. The required electrical and fire alarm construction work on this project including, but not limited to, demolition of existing power and lighting systems, new power circuits, new lighting fixtures, relocation of existing fire alarm equipment, new fire alarm devices, installation/removal of temporary heat detectors in the working areas, and any other addition/demolition alterations necessary for a complete and operable system.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Detailed Drawings and Specifications have been attached to this solicitation.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
- 113 HOLLAND AVE
- ALBANY , NY 12208
- USA
- Michael A Spivack
- MICHAEL.SPIVACK@va.gov
- Feb 06, 2026 05:44 pm ESTSolicitation (Original)
- Jan 02, 2026 05:18 pm EST Presolicitation (Original)
Related Document
See Also
Follow Z1DA--Replace Cast Iron Fittings 676-23-009 Active Contract Opportunity Notice ID 36C25226B0037 Related
VETERANS AFFAIRS, DEPARTMENT OF
Due by 10/14/2026
Follow ZION-EAST ENTRANCE STATION REHAB Active Contract Opportunity Notice ID 140P6026Q0063 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/15/2026
Follow NNSY DD4 DUCT INSULATION REPLACEMENT Active Contract Opportunity Notice ID N4008526R0254 Related
DEPT OF DEFENSE
Due by 9/21/2026
Follow MT-BOWDOIN NWR-HQ OFFICE FLOORS Active Contract Opportunity Notice ID 140FGA26Q0074 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/23/2026