Y1DA--630A4-26-401 MRI AHU Modification
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Aug 26, 2026 |
| Due Date: | Aug 28, 2026 |
| Solicitation No: | 36C24226R0060 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Aug 26, 2026 09:13 am EDT
- Original Published Date: Apr 27, 2026 11:58 am EDT
- Updated Date Offers Due: Aug 28, 2026 12:00 pm EDT
- Original Date Offers Due: May 26, 2026 12:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Sep 27, 2026
- Original Inactive Date: Sep 02, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Amendment 5
630A4-26-401 MRI AHU Modification
8. Question -Hallway Fan Coil Units-The contract documents indicate (6) 18,000 BTU/h chilled water surface-mounted fan coil units in the hallway. We have concerns with this configuration: the surface-mounted units would protrude into the corridor, presenting both an aesthetic issue and a potential head-strike hazard for pedestrians. We propose substituting ceiling-mounted fan coil units in lieu of the surface-mounted units. Please advise which of the following options is acceptable:
VA Response: Option A would be acceptable if there is no additional cost to the VA. Six ceiling mounted units would provide both the desired level of equipment redundancy and distributed air flow equivalent to the contract design wall mounted units. An 18,000 btu wall mounted evaporator fan unit requires a minimum of 6 inches of clearance below the ceiling for proper air flow. As the evaporator fan coil unit is approximately 12-14 inches high, in an 8 foot high corridor (96 inches clear), there would be a minimum of 76 inches clearance under the evaporator fan unit, or 6 foot 3 inches. If the corridor is higher than 8 feet then the clearance would increase.
Option A: Provide (6) ceiling-mounted fan coil units at 18,000 BTU/h each; note that due to ceiling constraints, the units cannot be equally spaced along the corridor.
Option B: Provide (3) ceiling-mounted fan coil units of higher capacity, sized to provide equivalent total cooling capacity, spaced evenly along the corridor.
- 113 HOLLAND AVE
- ALBANY , NY 12208
- USA
- Kimberly A Gomez (Contractor)
- Kimberly.Gomez@va.gov
- Aug 26, 2026 09:13 am EDTSolicitation (Updated)
- Jul 31, 2026 03:42 pm EDT Solicitation (Updated)
- Jul 23, 2026 11:24 am EDT Solicitation (Updated)
- Jul 23, 2026 11:24 am EDT Solicitation (Updated)
- Jun 30, 2026 04:18 pm EDT Solicitation (Updated)
- Jun 30, 2026 04:18 pm EDT Solicitation (Updated)
- Jun 18, 2026 02:59 pm EDT Solicitation (Updated)
- Apr 27, 2026 11:58 am EDT Solicitation (Original)
Related Document
| Apr 7, 2026 | [Presolicitation (Original)] Y1DA--630A4-26-401 MRI AHU Modification |
| Apr 27, 2026 | [Solicitation (Original)] Y1DA--630A4-26-401 MRI AHU Modification |
| May 20, 2026 | [Award Notice (Original)] Y1DZ--NRM-CONST 630-26-200 NYH Repair Underground Storage Tanks |
| Jun 18, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
| Jun 30, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
| Jul 23, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
| Jul 31, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
See Also
Follow Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025
DEPT OF DEFENSE
Due by 3/18/2028
Follow Beach Parking Lot Rehabilitation, Surry Mountain Lake, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Follow Y--SPECIAL NOTICE - INDUSTRY DAY/PROJECT PRESENTATION - National Mall and Memorial Active
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile
DEPT OF DEFENSE
Due by 9/16/2026