Y1DA--630A4-26-401 MRI AHU Modification
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jul 23, 2026 |
| Due Date: | Aug 7, 2026 |
| Solicitation No: | 36C24226R0060 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Jul 23, 2026 11:24 am EDT
- Original Published Date: Apr 27, 2026 11:58 am EDT
- Updated Date Offers Due: Aug 07, 2026 03:00 pm EDT
- Original Date Offers Due: May 26, 2026 12:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Sep 06, 2026
- Original Inactive Date: Sep 02, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1DA - CONSTRUCTION OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Amendment 3
630A4-26-401 MRI AHU Modification
6. Per our teams meeting this morning, please see below RFI's;
There are 3 potential options for the MRI chiller:
Air cooled package at grade with glycol and pump package.
Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water.
Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only.
Does The VA have a preference for which system works better for them?
The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice?
There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load?
COR answer(s):
It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications.
Accordingly, a series pump configuration is not considered an acceptable design.
The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.
- 113 HOLLAND AVE
- ALBANY , NY 12208
- USA
- Kimberly A Gomez (Contractor)
- Kimberly.Gomez@va.gov
- Jul 23, 2026 11:24 am EDTSolicitation (Updated)
- Jul 23, 2026 11:24 am EDT Solicitation (Updated)
- Jun 30, 2026 04:18 pm EDT Solicitation (Updated)
- Jun 30, 2026 04:18 pm EDT Solicitation (Updated)
- Jun 18, 2026 02:59 pm EDT Solicitation (Updated)
- Apr 27, 2026 11:58 am EDT Solicitation (Original)
Related Document
| Apr 7, 2026 | [Presolicitation (Original)] Y1DA--630A4-26-401 MRI AHU Modification |
| Apr 27, 2026 | [Solicitation (Original)] Y1DA--630A4-26-401 MRI AHU Modification |
| May 20, 2026 | [Award Notice (Original)] Y1DZ--NRM-CONST 630-26-200 NYH Repair Underground Storage Tanks |
| Jun 18, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
| Jun 30, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
| Jul 31, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
| Aug 26, 2026 | [Solicitation (Updated)] Y1DA--630A4-26-401 MRI AHU Modification |
See Also
Follow Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025
DEPT OF DEFENSE
Due by 3/18/2028
Follow Beach Parking Lot Rehabilitation, Surry Mountain Lake, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Follow Y--SPECIAL NOTICE - INDUSTRY DAY/PROJECT PRESENTATION - National Mall and Memorial Active
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile
DEPT OF DEFENSE
Due by 9/16/2026