Slipper Shroud Alignment Tool for MMIII weapon system
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Aug 7, 2025 |
| Due Date: | Sep 6, 2025 |
| Solicitation No: | FA820625R0896 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Aug 07, 2025 03:46 pm MDT
- Original Date Offers Due: Sep 06, 2025 05:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Sep 21, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 6650 - OPTICAL INSTRUMENTS, TEST EQUIPMENT, COMPONENTS AND ACCESSORIES
-
NAICS Code:
- 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
-
Place of Performance:
Hill Air Force Base , UT 84056USA
The Supply Chain Management Contracting Division, Hill Air Force Base, UT intends to award a contract for Minuteman III weapon system spare parts with an estimated award date of October 2025.
BID A: First Article Required
CLIN 0001 -- First Article: Noun: Slipper Shroud Alignment Tool; Function: Provides positive mechanical alignment of the inflight disconnect slipper relative to the aft shroud. Item Material: Corrosion-resistant steel. The case is plastic and foam; NSN: 5120000062866AH; Part Number: 68E50245G3; Qty: 1; Delivery: due 120 days ARO contract, IAW AFMC IMT 260 to Hill AFB, UT. First Article will be forwarded to Supply.
CLIN 0002 -- First Article Data: Test/Inspection Report; Qty: 1 LT; Delivery: due 120 days ARO contract, IAW DD1423-1.
CLIN 0003 – Production Articles: Slipper Shroud Alignment Tool; NSN: 5120000062866AH; Part Number: 68E50245G3; Qty: 11; Delivery: on or before 17Jun 2026.
BID B: For use Only with approved First Article Waiver
CLIN 0004 -- Production Articles: Slipper Shroud Alignment Tool; NSN: 5120000062866AH; Part Number: 68E50245G3; Qty: 12; Delivery: on or before 17Jun 2026.
Drawings will be available to JCP registrants upon request. The government retains unlimited rights to the data package. The performance requirements are captured in design 68E50245 and sub tier engineering documents. All associated EO's and specifications referenced in each design are also applicable. See attached solicitation and supporting documents for more details.
- CP 801-775-4918 6050 GUM LN BLDG 1215
- HILL AFB , UT 84056-5825
- USA
- Brad Wood
- bradley.wood.11@us.af.mil
- Arthur Gumushyan
- arthur.gumushyan@us.af.mil
- Aug 07, 2025 03:46 pm MDTSolicitation (Original)
- Jul 22, 2025 01:54 pm MDT Presolicitation (Original)
Related Document
| Jul 22, 2025 | [Presolicitation (Original)] Slipper Shroud Alignment Tool for MMIII weapon system |
See Also
Project: Buccal Swab Kits IFB Ref. #: AK27-100 Department: Division of Purchasing Type:
State Government of Utah
Due by 9/16/2026
Project: Reggio Circle Underdrain RFB Ref. #: Lehi 2026-04 Department: CITIES - Lehi
State Government of Utah
Due by 9/15/2026
Project: IFB - Rooftop Solar Inverters, Optimizers/Rapid Shutdown/Module-Level Power Electronics, and Data Acquisition
State Government of Utah
Due by 9/23/2026
Project: IFB - Canopy Solar Inverters, Optimizers/Rapid Shutdown/Module-Level Power Electronics, and Data Acquisition
State Government of Utah
Due by 9/23/2026