Slipper Shroud Alignment Tool for MMIII weapon system
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Utah |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 22, 2025 |
| Due Date: | Aug 6, 2025 |
| Solicitation No: | FA820625R0896 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Jul 22, 2025 01:54 pm MDT
- Original Response Date: Aug 06, 2025 05:00 pm MDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Aug 21, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 6650 - OPTICAL INSTRUMENTS, TEST EQUIPMENT, COMPONENTS AND ACCESSORIES
-
NAICS Code:
- 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
-
Place of Performance:
Hill Air Force Base , UT 84056USA
The purpose of this notice is to identify contracting and subcontracting opportunities by informing vendors of an upcoming acquisition. The Supply Chain Management Contracting Division, Hill Air Force Base, UT intends to award a contract for Minuteman III weapon system spare parts with an estimated award date of October 2025.
CLIN 0001 -- First Article: Noun: Slipper Shroud Alignment Tool; Function: Provides positive mechanical alignment of the inflight disconnect slipper relative to the aft shroud. Item Material: Corrosion-resistant steel. The case is plastic and foam; NSN: 5120000062866AH; Part Number: 68E50245G3; Qty: 1, Unit to be delivered IAW design drawings to Hill AFB, UT. First Article will be forwarded to Supply.
CLIN 0002 -- First Article Data: Test/Inspection Report. Qty: 1 LT
CLIN 0003 – Production Articles: Slipper Shroud Alignment Tool; NSN: 5120000062866AH; Part Number: 68E50245G3; Qty: 11, to be delivered to Hill AFB, UT by 17Jun 2026.
The Government has engineering data and data rights to provide JCP registrants in the event of expressed interest in qualifying as a source of supply. Interested vendors will determine if the data is sufficient for them to qualify as a source of supply. The government retains unlimited rights to the data package. The performance requirements are captured in design 68E50245 and sub tier engineering documents. All associated EO's and specifications referenced in each design are also applicable.
THIS PRE-SOLICITATION IS NOT A REQUEST FOR PROPOSALS. The solicitation and data will be posted on Sam.gov approximately 7 Aug 2025 with the anticipated closing (response) date of 6 Sep 2025, 5:00 PM MST.
- CP 801-775-4918 6050 GUM LN BLDG 1215
- HILL AFB , UT 84056-5825
- USA
- Brad Wood
- bradley.wood.11@us.af.mil
- Arthur Gumushyan
- arthur.gumushyan@us.af.mil
- Jul 22, 2025 01:54 pm MDTPresolicitation (Original)
Related Document
| Aug 7, 2025 | [Solicitation (Original)] Slipper Shroud Alignment Tool for MMIII weapon system |
See Also
Project: Buccal Swab Kits IFB Ref. #: AK27-100 Department: Division of Purchasing Type:
State Government of Utah
Due by 9/16/2026
Project: Reggio Circle Underdrain RFB Ref. #: Lehi 2026-04 Department: CITIES - Lehi
State Government of Utah
Due by 9/15/2026
Project: IFB - Rooftop Solar Inverters, Optimizers/Rapid Shutdown/Module-Level Power Electronics, and Data Acquisition
State Government of Utah
Due by 9/23/2026
Project: IFB - Canopy Solar Inverters, Optimizers/Rapid Shutdown/Module-Level Power Electronics, and Data Acquisition
State Government of Utah
Due by 9/23/2026