Site Visit -Mud Mountain Dam Lower Cascade Creek Water Control Facility
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Washington |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Nov 13, 2024 |
| Due Date: | Nov 12, 2024 |
| Solicitation No: | W912DW25B0003 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
- Contract Opportunity Type: Special Notice (Updated)
- Updated Published Date: Nov 13, 2024 07:59 am PST
- Original Published Date: Oct 23, 2024 01:51 pm PDT
- Updated Response Date: Nov 12, 2024 10:00 am PST
- Original Response Date: Nov 12, 2024 10:00 am PST
- Inactive Policy: 15 days after response date
- Updated Inactive Date: Nov 27, 2024
- Original Inactive Date: Nov 27, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Enumclaw , WA 98022USA
10/31/2024 Amended to Add Specific Site Visit Instructions
The US Army Corps of Engineers will be hosting a site visit on November 14, 2024, at 10am Pacific Standard Time. The directions are attached. Please contact Jeannette Patton @ jeannette.k.patton@usace.army.mil for information and sign up. More information will be provided soon.
Location: The work is located at the Mud Mountain Dam, located along the White River near Enumclaw Washington. See attached directions.
Project Description
The work includes all work and incidental related work as indicated on the drawings and specifications, to replace the existing MMD Lower Cascade Creek Water Control System with a new Water Control System designed to convey 250 cfs from Lower Cascade Creek to the White River.
a. Install temporary Lower Cascade Creek stream bypass system.
b. Demolish existing Lower Cascade Creek upper Intake Basin.
c. Excavate native soils and replace with fill per the drawings and
specifications.
d. Demolish existing guardrails at the upper and lower switchback.
e. Construct concrete intake and wing wall structures.
f. Construct gravity block wall next to concrete intake structure.
g. Construct concrete outlet basin.
h. Deliver, install and load test pipe support piles.
i. Construct pipe support concrete cap beams
j. Fabricate, deliver and install steel discharge pipe.
k. Install new guardrails at the upper and lower switchback.
l. Remove temporary Lower Cascade Creek stream bypass system.
m. Deliver and install plants and seed at the site, per the drawings and specifications.
- KO CONTRACTING DIVISION 4735 EAST MARGINAL WAY SOUTH
- SEATTLE , WA 98134-2329
- USA
- Jeannette Patton
- jeannette.k.patton@usace.army.mil
- Robert L. Gonzalez
- robert.l.gonzalez@usace.army.mil
- Nov 13, 2024 07:59 am PSTSpecial Notice (Updated)
- Oct 31, 2024 02:27 pm PDT Special Notice (Updated)
- Oct 23, 2024 01:51 pm PDT Special Notice (Original)
- Oct 12, 2024 08:55 pm PDT Presolicitation (Original)
Related Document
| Oct 23, 2024 | [Special Notice (Original)] Site Visit -Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Oct 31, 2024 | [Special Notice (Updated)] Site Visit -Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Nov 5, 2024 | [Solicitation (Original)] Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Nov 27, 2024 | [Solicitation (Updated)] Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Dec 11, 2024 | [Solicitation (Updated)] Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Dec 16, 2024 | [Solicitation (Updated)] Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Dec 17, 2024 | [Solicitation (Updated)] Mud Mountain Dam Lower Cascade Creek Water Control Facility |
| Dec 18, 2024 | [Solicitation (Updated)] Mud Mountain Dam Lower Cascade Creek Water Control Facility |
See Also
Follow Kalispel Tribe Dike Repair- Pend Oreille County, Washington Active Contract Opportunity Notice
AGRICULTURE, DEPARTMENT OF
Due by 9/21/2026
Solicitation Title Solicitation Type Status Posting Date Open Date Close Date Details KC001691,3
King County
Due by 9/15/2026
Abstract: Construction Solicitation KC001691,2 Title Central Base, Atlantic Base & Non-Revenue UST Improvements
King County
Due by 9/15/2026
09/03/2026 Request for Qualifications (RFQ) for Multiple Airfield Improvements at Spokane International Airport
Spokane International Airport
Due by 10/30/2026