Site Effluent System
| Agency: | COMMERCE, DEPARTMENT OF |
|---|---|
| State: | Maryland |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) |
| Posted Date: | Aug 4, 2026 |
| Due Date: | Aug 7, 2026 |
| Solicitation No: | 1333ND26RNB190022 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Aug 04, 2026 04:40 pm EDT
- Original Published Date: Jun 09, 2026 11:08 am EDT
- Updated Date Offers Due: Aug 07, 2026 12:00 pm EDT
- Original Date Offers Due: Jun 25, 2026 12:00 pm EDT
- Inactive Policy: Manual
- Updated Inactive Date: Aug 08, 2026
- Original Inactive Date: Jun 26, 2026
-
Initiative:
- None
- Original Set Aside: SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- Product Service Code: Z1ND - MAINTENANCE OF SEWAGE AND WASTE FACILITIES
-
NAICS Code:
- 561210 - Facilities Support Services
-
Place of Performance:
Gaithersburg , MD 20899USA
This solicitation is reissued due to technical responses that were required in addition to adhering to the FAR Overhaul under Commercial Services. A second site visit is scheduled and listed within the attached Amendment.
BACKGROUND INFORMATION
The Gaithersburg Site Effluent Treatment System is located on the south end of campus at the āEā Gate intersection at Center Drive. Built in the mid-1990ās, the system was designed to comply with Washington Sanitary Sewer Commission (WSSC) effluent discharge requirements. The system is centered around a large concrete tank (wet tank) that provides primary effluent treatment with a stir / chop agitator system PH monitoring and treatment.
Currently, the interior wet tank operational, structural, and life safety systems have rendered this system inoperable. Inspection has found the primary floor support has detached along the south side of the wet tank. This has caused for the aluminum grating to sag, and no longer safe for personnel entry. More, there are areas of the aluminum grate that have literally rotted away.
Further inspection revealed several issues.
Internal blowers to address the confined space ventilation requirements are inoperable and heavily corroded. The system internal heater is inoperable and heavily corroded. The motor and stir mechanism is seized. Additionally, the motor is electrically inoperable. The explosion proof electrical wiring and conduit is in very poor condition.
In general, the entire wet tank and systems needs to be renovated and brought back to operable condition. This requires a complete replacement of all tank components. This includes an entire new floor surface and all support members, safety blowers and heaters, new stir / agitation motor and shaft system, PH monitoring probes and data signaling, epoxy lining of the wet tank, lighting, electrical outlets, and demolition and replacement of all the explosion proof electrical wiring and conduit. Other work as required to conform to current regulatory requirements, as required.
PURPOSE
The Site Effluent Treatment System requires a complete rebuilding of all internal components to fulfill operational, regulatory, and life safety requirements.
PLACE OF PERFORMANCE
NIST Campus in Gaithersburg, Maryland.
NOTICE TO OFFERORS
Proposals are being requested in accordance to the submission requirements for Technical Approach, Schedule, and Price. Award will be made on the basis of the best value to the government
PERIOD OF PERFORMANCE
The period of performance for this project is estimated at 200 days from Notice to Proceed.
- ACQUISITION MANAGEMENT DIVISION 100 BUREAU DR.
- GAITHERSBURG , MD 20899
- USA
- Sasha Bradford
- sasha.bradford@nist.gov
- Aug 04, 2026 04:40 pm EDTCombined Synopsis/Solicitation (Updated)
- Aug 04, 2026 10:35 am EDT Combined Synopsis/Solicitation (Updated)
- Jul 31, 2026 03:32 pm EDT Combined Synopsis/Solicitation (Updated)
- Jul 17, 2026 05:37 pm EDT Combined Synopsis/Solicitation (Updated)
- Jul 17, 2026 05:31 pm EDT Combined Synopsis/Solicitation (Updated)
- Jun 26, 2026 11:55 pm EDT Combined Synopsis/Solicitation (Original)
Related Document
| Jun 9, 2026 | [Combined Synopsis/Solicitation (Original)] Site Effluent System |
| Jul 17, 2026 | [Combined Synopsis/Solicitation (Updated)] Site Effluent System |
| Jul 31, 2026 | [Combined Synopsis/Solicitation (Updated)] Site Effluent System |
See Also
Project: Roof Replacement Contractor Services Ref. #: 020.27.B9 Type: IFB Status: Open Open
The Howard County Public School System
Due by 9/23/2026
ID: BPM058532 Title: Repairs and Upgrades to Two-Story House at South End of
State Government of Maryland
Due by 10/09/2026
ID: BPM058441 Title: DNR Holly Beach Farm NRMA Moss House Siding Status: Open
State Government of Maryland
Due by 9/25/2026
Project ID: B47-114 Title: Construction Services-Safe Streets for All: Georgia Avenue at Evans
The Maryland National Capital Park and Planning Commissions
Due by 10/12/2026