Site Effluent System

Agency: COMMERCE, DEPARTMENT OF
State: Maryland
Type of Government: Federal
FSC Category:
  • Z - Maintenance, Repair or Alteration of Real Property
NAICS Category:
  • 561210 - Facilities Support Services
Set Aside: SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Posted Date: Jun 9, 2026
Due Date: Jun 25, 2026
Solicitation No: 1333ND26RNB190022
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
Site Effluent System
Active
Contract Opportunity
Notice ID
1333ND26RNB190022
Related Notice
Department/Ind. Agency
COMMERCE, DEPARTMENT OF
Sub-tier
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
Office
DEPT OF COMMERCE NIST
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Jun 09, 2026 11:08 am EDT
  • Original Date Offers Due: Jun 25, 2026 12:00 pm EDT
  • Inactive Policy: Manual
  • Original Inactive Date: Jun 26, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
  • Product Service Code: Z1ND - MAINTENANCE OF SEWAGE AND WASTE FACILITIES
  • NAICS Code:
    • 561210 - Facilities Support Services
  • Place of Performance:
    Gaithersburg , MD 20899
    USA
Description

BACKGROUND INFORMATION



The Gaithersburg Site Effluent Treatment System is located on the south end of campus at the ā€œEā€ Gate intersection at Center Drive. Built in the mid-1990’s, the system was designed to comply with Washington Sanitary Sewer Commission (WSSC) effluent discharge requirements. The system is centered around a large concrete tank (wet tank) that provides primary effluent treatment with a stir / chop agitator system PH monitoring and treatment.



Currently, the interior wet tank operational, structural, and life safety systems have rendered this system inoperable. Inspection has found the primary floor support has detached along the south side of the wet tank. This has caused for the aluminum grating to sag, and no longer safe for personnel entry. More, there are areas of the aluminum grate that have literally rotted away.



Further inspection revealed several issues.



Internal blowers to address the confined space ventilation requirements are inoperable and heavily corroded. The system internal heater is inoperable and heavily corroded. The motor and stir mechanism is seized. Additionally, the motor is electrically inoperable. The explosion proof electrical wiring and conduit is in very poor condition.



In general, the entire wet tank and systems needs to be renovated and brought back to operable condition. This requires a complete replacement of all tank components. This includes an entire new floor surface and all support members, safety blowers and heaters, new stir / agitation motor and shaft system, PH monitoring probes and data signaling, epoxy lining of the wet tank, lighting, electrical outlets, and demolition and replacement of all the explosion proof electrical wiring and conduit. Other work as required to conform to current regulatory requirements, as required.



PURPOSE



The Site Effluent Treatment System requires a complete rebuilding of all internal components to fulfill operational, regulatory, and life safety requirements.



PLACE OF PERFORMANCE



NIST Campus in Gaithersburg, Maryland.



NOTICE TO OFFERORS



Proposals are being requested in accordance to the submission requirements for Technical Approach, Schedule, and Price. Award will be made on the basis of the best value to the government



PERIOD OF PERFORMANCE



The period of performance for this project is estimated at 200 days from Notice to Proceed.


Attachments/Links
Contact Information
Contracting Office Address
  • ACQUISITION MANAGEMENT DIVISION 100 BUREAU DR.
  • GAITHERSBURG , MD 20899
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Jun 09, 2026 11:08 am EDTCombined Synopsis/Solicitation (Original)

Related Document

Jul 17, 2026[Combined Synopsis/Solicitation (Updated)] Site Effluent System
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

ID: BPM057778 Title: IFB-27014 Elevator Replacement at Dr. Nathan Pitts-Ashburton Pre-K to 8

State Government of Maryland

Bid Due: 7/30/2026

Bid Number: BPM057809 Bid Title: Historic Courthouse Renovation Category: Public Works Status: Open

Queen Anne County

Bid Due: 7/29/2026

Follow Atlantic Coast of Maryland (ACMD) Berm Reconstruction Active Contract Opportunity Notice ID

DEPT OF DEFENSE

Bid Due: 7/30/2026

Follow SCIF Door Replacement Active Contract Opportunity Notice ID W50S8226QA003 Related Notice Department/Ind.

DEPT OF DEFENSE

Bid Due: 8/12/2026