Site Effluent System
| Agency: | COMMERCE, DEPARTMENT OF |
|---|---|
| State: | Maryland |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) |
| Posted Date: | Jun 9, 2026 |
| Due Date: | Jun 25, 2026 |
| Solicitation No: | 1333ND26RNB190022 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Jun 09, 2026 11:08 am EDT
- Original Date Offers Due: Jun 25, 2026 12:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Jun 26, 2026
-
Initiative:
- None
- Original Set Aside: SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
- Product Service Code: Z1ND - MAINTENANCE OF SEWAGE AND WASTE FACILITIES
-
NAICS Code:
- 561210 - Facilities Support Services
-
Place of Performance:
Gaithersburg , MD 20899USA
BACKGROUND INFORMATION
The Gaithersburg Site Effluent Treatment System is located on the south end of campus at the āEā Gate intersection at Center Drive. Built in the mid-1990ās, the system was designed to comply with Washington Sanitary Sewer Commission (WSSC) effluent discharge requirements. The system is centered around a large concrete tank (wet tank) that provides primary effluent treatment with a stir / chop agitator system PH monitoring and treatment.
Currently, the interior wet tank operational, structural, and life safety systems have rendered this system inoperable. Inspection has found the primary floor support has detached along the south side of the wet tank. This has caused for the aluminum grating to sag, and no longer safe for personnel entry. More, there are areas of the aluminum grate that have literally rotted away.
Further inspection revealed several issues.
Internal blowers to address the confined space ventilation requirements are inoperable and heavily corroded. The system internal heater is inoperable and heavily corroded. The motor and stir mechanism is seized. Additionally, the motor is electrically inoperable. The explosion proof electrical wiring and conduit is in very poor condition.
In general, the entire wet tank and systems needs to be renovated and brought back to operable condition. This requires a complete replacement of all tank components. This includes an entire new floor surface and all support members, safety blowers and heaters, new stir / agitation motor and shaft system, PH monitoring probes and data signaling, epoxy lining of the wet tank, lighting, electrical outlets, and demolition and replacement of all the explosion proof electrical wiring and conduit. Other work as required to conform to current regulatory requirements, as required.
PURPOSE
The Site Effluent Treatment System requires a complete rebuilding of all internal components to fulfill operational, regulatory, and life safety requirements.
PLACE OF PERFORMANCE
NIST Campus in Gaithersburg, Maryland.
NOTICE TO OFFERORS
Proposals are being requested in accordance to the submission requirements for Technical Approach, Schedule, and Price. Award will be made on the basis of the best value to the government
PERIOD OF PERFORMANCE
The period of performance for this project is estimated at 200 days from Notice to Proceed.
- ACQUISITION MANAGEMENT DIVISION 100 BUREAU DR.
- GAITHERSBURG , MD 20899
- USA
- Sasha Bradford
- sasha.bradford@nist.gov
- Jun 09, 2026 11:08 am EDTCombined Synopsis/Solicitation (Original)
Related Document
| Jul 17, 2026 | [Combined Synopsis/Solicitation (Updated)] Site Effluent System |
| Jul 31, 2026 | [Combined Synopsis/Solicitation (Updated)] Site Effluent System |
| Aug 4, 2026 | [Combined Synopsis/Solicitation (Updated)] Site Effluent System |
See Also
Project: Stormwater Management, Drainage, and Remediation Services for Maryland Metropolitan Districts-MBE Goal 17%
Maryland Environmental Service
Due by 9/24/2026
Bid Number: 09022026 Bid Title: Douglas Street Right of Way Improvement Category: Commissioners
Cambridge city
Due by 9/25/2026
Follow Greenhouse Repairs and Electrical Work at Norman A. Berg Plant Materials Center,
AGRICULTURE, DEPARTMENT OF
Due by 9/16/2026
ID: BPM058548 Title: Roof Replacement Contractor Services Status: Open Due / Close Date:
State Government of Maryland
Due by 9/23/2026