Request for Qualifications W Monroe St Inspection Services |
November 17, 2025 7:30 AM |
December 23, 2025 1:30 PM |
11-17-25 Posting Date
ERI-MR0746-01.62
PID No. 118505
City of Sandusky
Response Due Date: 12-23-25
Communications Restrictions
Please note the following policy concerning communication between Consultants and the City of Sandusky during the announcement and selection process:
During the time period between advertisement and the announcement of final consultant selection, communication with consultants (or their agents) shall be limited as follows:
Communications which are strictly prohibited:
Any discussions or marketing activities related to this specific project.
Allowable communications include:
Technical or scope of services questions specific to the project or RFP requirements.
Project Description
The services include Construction Inspection and Construction Administration services for the West Monroe Street Rehabilitation project that included full depth repairs and the installation of a storm sewer system to convey road runoff. Water and sanitary sewer services will need addressed, as they are encountered during excavation. Coordination with property owners is imperative throughout the entire length of the project.
Estimated Construction Cost: $1,360,770.25
Prequalification Requirements
Prequalification requirements for this agreement are listed below. For all prequalification categories other than FINANCIAL MANAGEMENT SYSTEM EVALUATION the requirement may be met by the prime consultant or a subconsultant.
Also, please note that only individuals (not firms) are prequalified construction inspection activities. In instances where prequalification for these services is required, a prequalified individual, either employed by the prime consultant or a subconsultant, must be named in order to meet the requirement.
For agreements that require prequalification in FINANCIAL MANAGEMENT SYSTEM EVALUATION, the prime consultant and all subconsultants that provide engineering and design related services must be prequalified in this category. Engineering and Design Related Services are defined as follows:
Program management, construction management, feasibility studies, preliminary engineering, design engineering, surveying, mapping, or architectural related services with respect to a highway construction project subject to 23 U.S.C. 112(a) as defined in 23 U.S.C 112(b)(2)(A); and
Professional services of an architectural or engineering nature, as defined by State law (ORC 5526), which are required to or may logically or justifiably be performed or approved by a person licensed, registered, or certified to provide the services with respect to a highway construction project to 23 U.S.C. 112(a) and defined in 40 U.S.C. 1102(2).
CONSTRUCTION INSPECTION AND ADMINISTRATION:
Project Inspector 1;
Project Inspector 2;
Soils and Aggregate Inspector;
Construction Engineer Level 2;
Construction Management Firm
FINANCIAL MANAGEMENT SYSTEM EVALUATION
Compliant with Federal Requirements (Prime consultant and subconsultants that provide engineering and design related services must meet this prequalification requirement)
Contract Type and Payment Method
Refer to the ODOT’s Manual for Administration of Contracts for Professional Services, Volume 1: Consultant Contract Administration, Sections 4.3.A and 4.3.B for guidance concerning the appropriate contract type and payment method. Based on this guidance, contract type and payment method will be determined during the scope of services and negotiation process.
Estimated Date of Authorization
It is anticipated that the selected Consultant will be authorized to proceed by January 2026.
Project Schedule
Project Bidding November – December 2025
Award January 2026
Construction May 1, 2026
Completion Dec 1, 2026
Suspended or Debarred Firms
Firms included on the current Federal list of firms suspended or debarred are not eligible for selection.
Terms and Conditions
The Department’s Specifications for Consulting Services 2016 Edition will be included in all agreements selected under this request for letters of interest.
Compliance with Title VI of the Civil Rights Act of 1964
The City of Sandusky, in accordance with Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, all bidders will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, disability, low-income status, or limited English proficiency in consideration for an award.
Selection Procedures
The City of Sandusky, will directly select a consultant based on the Letter of Interest (LoI). The requirements for the LoI and the Programmatic Consultant Selection Rating Form that will be used to select the consultant are shown below.
Firms interested in being considered for selection should respond by submitting one electronic copy of the Letter of Interest to both of the following listed individuals via email by 1:30 PM on the response due date listed above.
City of Sandusky
Melissa Vassallo, Project Coordinator
mvassallo@cityofsandusky.com
Megan Stookey, Project Manager
mstookey@cityofsandusky.com
Responses received after 1:30 PM on the response due date will not be considered.
Scope of Services
The Scope of Services document is included below.
Requirements for Letters of Interest, Programmatic Selection Process
A. Instructions for Preparing and Submitting a Letter of Interest
1. Provide the information requested in the Letter of Interest Content (Item B below), in the same order listed, in a letter signed by an officer of the firm. Do not send additional forms, resumes, brochures, or other material.
2. Letters of Interest shall be limited to ten (10) 8½" x 11" single sided pages plus two (2) pages for the Project Approach (Item B.5 below).
3. Please adhere to the following requirements in preparing and binding letters of interest:
a. Please use a minimum font size of 12-point and maintain margins of 1" on all four sides.
b. Page numbers must be centered at the bottom of each page.
c. Use 8½" x 11" paper only.
B. Letter of Interest Content
1. List the types of services for which your firm is currently prequalified by the Ohio Department of Transportation.
2. List significant subconsultants, their current prequalification categories and the percentage of work to be performed by each subconsultant.
3. List the Project Manager and other key staff members, including key subconsultant staff. Include project engineers for important disciplines and staff members that will be responsible for the work, and the project responsibility of each.
Address the experience of the key staff members on similar projects, and the staff qualifications relative to the selection subfactors noted.
4. Describe the capacity of your staff and their ability to perform the work in a timely manner, relative to present workload, and the availability of the assigned staff.
5. Provide a description of your Project Approach, not to exceed two pages. Confirm that the firm has visited the site and address your firm’s: 1) Technical approach; 2) Understanding of the project; 3) Qualifications for the project; 4) Knowledge and experience concerning relevant ODOT and local standards, procedures and guidance documents; 5) Innovative ideas; 6) Project specific plan for ensuring increased quality, reduced project delivery time and reduced project costs.
Items 1 thru 4 must be included within the 10-page body of the LoI. Remaining space within the ten (10) pages may be utilized to provide personnel resumes or additional information concerning general qualifications.
Consultant Selection Rating Form Project: ERI-W. Monroe St.
for PID: 118505
Programmatic Selections Project Type:
District:3
Selection Committee Members:
Firm Name:
|
Category |
Total Value |
Scoring Criteria |
Score |
|
Management & Team |
|||
|
Project Manager |
10 |
See Note 1, Exhibit 1 |
|
|
Strength/Experience of Assigned Staff including Subconsultants |
25 |
See Note 2, Exhibit 1 |
|
|
Firm's Current Workload/ Availability of Personnel |
10 |
See Note 4, Exhibit 1 |
|
|
Consultant's Past Performance |
30 |
See Note 3, Exhibit 1 |
|
|
Project Approach |
25 |
||
|
Total |
100 |
Exhibit 1 - Consultant Selection Rating Form Notes
1. The proposed project manager for each consultant shall be ranked, with the highest ranked project manager receiving the greatest number of points, and lower ranked project managers receiving commensurately lower scores. The rankings and scores should be based on each project manager’s experience on similar projects and past performance for the LPA and other agencies. The selection committee may contact ODOT and outside agencies if necessary. Any subfactors identified should be weighed heavily in the differential scoring.
Differential scoring should consider the relative importance of the project manager's role in the success of a given project. The project manager’s role in a simple project may be less important than for a complex project, and differential scoring should reflect this, with higher differentials assigned to projects that require a larger role for the project manager.
2. The experience and strength of the assigned staff, including subconsultant staff, should be ranked and scored as noted for Number 1 above, with higher differential scores assigned on more difficult projects. Any subfactors identified in the project notification should be weighed heavily in the differential scoring.
As above, other agencies may be contacted.
3. The consultants' past performance on similar projects shall be ranked and scored on a relative, differential scoring type basis, with the highest ranked consultant receiving a commensurately greater number of points. The selection team should consider ODOT CES performance ratings if available, and consult other agencies as appropriate. The use of CES ratings shall place emphasis on the specific type of services requested.
The differential scoring should consider the complexity of the project and any subfactors identified in the project notification.
4. The consultant's workload and availability of qualified personnel, equipment and facilities shall be ranked and scored on a relative, differential scoring type basis. The scoring shall consider quantifiable concerns regarding the ability of a firm (or firms) rated higher in other categories to complete the work with staff members named in the letter of interest.
City of Sandusky
CONSTRUCTION ADMINISTRATION, INSPECTION, AND MATERIALS MANAGEMENT SCOPE OF SERVICES
Project Specific Services
|
Project Name |
ERI-W. Monroe St. Rehabilitation |
|
PID |
118505 |
|
Project Description |
Paving and Storm Sewer installation on W. Monroe Street from Camp St. to Decatur St. |
|
Work Description |
The services include Construction Inspection and Construction Administration services for the West Monroe Street Rehabilitation Project in Erie County. There will be installation of a new storm sewer system, limited full depth pavement and curb replacement as well as resurfacing of the entire roadway along this stretch. Because of the likelihood of encountering private utility lines, coordination with property owners is imperative throughout the entire length of the project. |
|
Scope of Services Meeting Date |
TBD |
I. GENERAL REQUIREMENTS
Provide services in accordance with ODOT’s Construction Administration Manual of Procedures, 2017 or latest revision.
II. SCOPE OF WORK
Provide a project team including personnel that meet the following prequalification categories:
|
ODOT Prequalification Category |
Approximate Number Required |
Notes |
|
Project Inspector 1 |
1 |
|
|
Project Inspector 2 |
1 |
As Needed |
|
Soils & Aggregate Inspector |
1 |
As Needed |
|
Construction Engineer Level 2 |
1 |
Part time basis |
|
Non-Prequalified Personnel |
Approximate Number Required |
Notes |
|
Documentation Clerk |
1 |
|
The services may include:
A. Construction Contract Administration Duties
The performance of engineering and supervisory duties, administration, inspection and materials management required in the administration of a Federal Aid construction contract, as defined in the Ohio Department of Transportation (ODOT) Construction Inspection Manual of Procedures, and in accordance with the Construction and Materials Specifications (CMS), and construction contract specific requirements.
The table below includes the specific services required for this agreement.
|
Responsibility |
||||
|
PRIMARY TASK |
ODOT Oversight |
LPA |
CONSULTANT |
NOTES |
|
POST AWARD |
||||
|
Preconstruction Conference |
X |
X |
||
|
ACTIVE PROJECT ADMINISTRATION |
||||
|
Daily Field Engineering and Inspection |
X |
X |
||
|
MATERIALS MANAGEMENT, TESTING CERTIFICATION |
||||
|
Asphalt, Concrete & Aggregate Producer/Supplier Monitoring |
X |
X |
||
|
Asphalt, Concrete & Aggregate Field Testing |
X |
|||
|
Field Inspection of Materials from ODOT Certified Sources |
X |
|||
|
Monitoring and Documentation of Materials Management Process |
X |
X |
||
|
PROJECT DOCUMENTATION |
||||
|
Daily Diaries |
X |
|||
|
Documentation of Quantities, Completed & Accepted |
X |
|||
|
Monitoring of Project Documentation |
X |
X |
||
|
ACTIVE PROJECT MANAGEMENT |
||||
|
Progress Meetings |
X |
X |
||
|
Schedule Tracking and Updates |
X |
X |
||
|
PAYMENT & REIMBURSEMENTS |
||||
|
Contractor Payment |
X |
X |
LPA to process final payment after consultant review & approval. |
|
|
Summary of Progressive Payment |
X |
|||
|
Invoice and Reimbursement Preparation |
X |
|||
|
Review and Approval of Reimbursement Request |
X |
X |
||
|
CONTRACT CHANGES |
||||
|
Negotiation and Preparation of Change Orders |
X |
X |
LPA to be apart of all conversations. |
|
|
Concurrence on significant Change Orders for Reimbursement |
X |
X |
X |
LPA to be apart of all conversations. |
|
CLAIMS MANAGEMENT |
||||
|
Claims Negotiation and Approval of Resolution |
X |
|||
|
Approval of Funding for Resolution |
X |
X |
||
|
Monitoring and Documentation of Claims Management Process |
X |
X |
||
|
PREVAILING WAGE COMPLIANCE |
||||
|
Wage Interviews, Payroll Reviews |
X |
|||
|
Resolution of Underpaid Wages |
X |
|||
|
Monitoring and Documentation of Prevailing Wage Compliance Process |
X |
X |
||
|
EEO CONTRACT COMPLIANCE |
||||
|
EEO Contract Requirements |
X |
|||
|
Bulletin Board Monitoring |
X |
|||
|
Commercially Useful Function Reviews |
X |
|||
|
Monitoring and Documentation of LPA’s EEO Compliance Process |
X |
X |
||
|
PROJECT FINALIZATION |
||||
|
Final Inspection and Acceptance |
X |
X |
||
|
Resolution of Punch list Items |
X |
|||
|
Agreement of Final Quantities, Payment |
X |
|||
|
Final Payment to Contractor, Release of Responsibility |
X |
|||
|
Preparation of Project Closeout Documents |
X |
|||
|
Review and Approval of Finalization Documents |
X |
X |
||
|
Completion of LPA Contract Administration Evaluation |
X |
X |
B. If included above or requested in writing, provide a documentation clerk as follows:
1. Job Duties
Performs specialized clerical tasks (e.g. searches records, gathers & organizes data, information & summarizes in preliminary reports; checks accuracy, clarifies discrepancies & certifies final data, possesses Microsoft Word and spreadsheet skills to produce basic reports and basic data entry). Performs general clerical tasks (e.g. maintains files; sorts and routes mail; answers phones, greets visitors; orders & stocks supplies; maintains calendar; makes copies; prepares materials for mailing; schedules meetings). Prepares and maintains construction project records and reports by entering information into Site Manager (e.g. prepares daily construction diaries by compiling information from the inspectors reports, prepares monthly project status reports, compiles data from records for accurate submission of contract information. Performs other miscellaneous duties as assigned by the Project Engineer.
2. Qualifications
a. High school diploma or GED.
b. Formal education in arithmetic that includes addition, subtraction, multiplication, division, fractions, percentages & decimals, reading, writing and speaking common English vocabulary.
c. Two (2) years training and/or experience in office practices and procedures, including use of Microsoft Word and spreadsheets.
III. COMPENSATION
A. The City of Sandusky shall make payment based on actual hours worked by the Consultant’s employees, excluding sick leave, personal leave, and vacation. Payment for holidays will not be made unless the Consultant is required to work; in such case, the holiday will be considered a regular work day and will be paid at the regular hourly rate, unless the forty (40) hour work week requirement has been met as described in the following Paragraph (B). Work in excess of forty (40) hour work week must be approved by the City of Sandusky prior to being incurred.
B. If applicable, overtime will be paid for all hours worked over a total of forty (40) on a weekly basis, including core working hours and eligible driving time. Payment for eligible overtime shall be commensurate with the Consultant’s personnel policies. Specifically, companies that treat overtime premium as a direct cost may bill directly for overtime plus any applicable premium rate (e.g., time and a half for each hour of overtime worked). Conversely, companies that treat overtime premium as an indirect cost (overhead) must bill/invoice overtime hours at the straight-time pay rate.
IV. INVOICING
The Consultant shall submit an invoice each month. ODOT’s standard invoice form shall be used.
V. CONSULTANT STAFF REQUIREMENTS
The Consultant shall assign only qualified personnel to the project. The Consultant shall remove any employee who, in the determination of the City of Sandusky, does not perform the work in accordance with the Manual of Procedures, the Construction and Materials Specifications (CMS), and construction contract specific requirements.
Should the Consultant fail to remove the employee or employees as required or fail to furnish suitable and sufficient personnel for proper performance of the work, the City of Sandusky may withhold payment of invoices submitted by the Consultant until corrective measures are taken. If the Consultant fails to comply, the City of Sandusky may make a finding to that effect and so notify the Consultant in writing that the Agreement is terminated in accordance with Section 2.41 of the Specifications for Consulting Services, 2016 Edition.
VI. REPORT-IN LOCATIONS AND TRAVEL REGULATIONS
The report-in location for consultant personnel shall be the project field office or a location at the project site designated by the City of Sandusky. No compensation will be provided for commuting to and from the report-in location. Travel time to retrieve or return samples or equipment is billable. Consultants that provide leased or company owned vehicles for use on site shall be compensated on a daily rate basis. If company owned vehicles are provided, the Consultant’s indirect cost pool shall be credited for the daily rate reimbursement.
VII. SERVICES BY THE CITY OF SANDUSKY
A. The City of Sandusky will make available to the Consultant the necessary plans, specifications, copy of the proposal and other documents as required.
B. The City of Sandusky will provide the Consultant with documentation requirements including inspection report forms needed for computation, reporting, record keeping and field testing.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
AML Reclamation Construction Engineering and Inspection Services (FY 2027) June 15, 2026 |
State of Ohio - Department of Natural Resources
Bid Due: 7/02/2026
Solicitation #: RFQ033053 Requesting Department: Public Utilities Document Title: Shamrock Drive Area Waterline
City of Columbus
Bid Due: 7/22/2026
Solicitation ID: SRC0000032929 Solicitation Name: Voting Machines RFP Original Begin Date: 3/12/2026 3:01:58
State Government of Ohio
Bid Due: 7/06/2026
Eddy Way Waterline Replacement (Bid Date: 06/24/2026) Legal Notice Eddy Way Waterline Replacement
Wooster city
Bid Due: 6/24/2026