Agency: | DEPT OF DEFENSE |
---|---|
State: | Federal |
Type of Government: | Federal |
FSC Category: |
|
NAICS Category: |
|
Posted Date: | Jun 27, 2023 |
Due Date: | Jun 27, 2023 |
Solicitation No: | W911XK23B0003 |
Bid Source: | Please Login to View Page |
Contact information: | Please Login to View Page |
Bid Documents: | Please Login to View Page |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
***Bid Abstract Posting June 27, 2023***Environmental Remediation Services Construction project to implement system upgrade recommendations for theOtt Story Superfund Site Operable Unit #2 Groundwater Remedy in Muskegon (Dalton Township), Michigan. Thedesign is intended to improve the effectiveness of the collection system to maintain contaminated groundwaterplume capture and contaminant mass removal for the OU1/OU2 remedy. The work includes the followingmajor items:a. Install new extraction wells, associated appurtenances, and connect to existing system. New wells are numberedto coordinate with existing wells: EW-2a, EW-3a, EW 4a, EW-5a, EW-6b.b. Installation of three new rehabilitation wells at each new EW location (total of 15 wells) to allow for chemicalrehabilitation of the well and aquifer immediately surrounding the well.c. Installation of below grade electrical conduit within concrete ductbank from each new EW location back to thecontrol panel.d. Installation of above-ground weatherproof enclosures for each new extraction well piping and flow measurementequipment.e. Upgrade and replace existing manifold piping and appurtenances in below grade EW vaults (EW-1, EW-2, EW-3,EW-4, EW-5, EW-7, EW-8 and EW-9) with PVC materials (3 inch diameter).f. Replace all system flow meters with consistent make/model.g. Install pressure gauges on collection lines E and F in Valve Vaults 1, 2 and 3. There are no existing gauges in thevaults. No comm or power wiring for gauges is required.h. Install new standby back-up power generation and control for the new well extraction well network.i. Upgrade controls infrastructure to allow remote monitoring of the expanded well extraction well network.j. Complete monitoring well abandonment actions to optimize the existing well network.All pre-field planning documents to include the Accident Prevention Plan, Health and Safety Plan, Well InstallationPlan, Work Plan, Quality Control (QC) Plan, and Environmental Protection Plan must be approved by theContracting Officer before construction work begins.Please note that some well locations may require 72 hour prior notice before being granted access to the site.
Feb 17, 2023 | [Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy |
Mar 6, 2023 | [Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy |
Mar 27, 2023 | [Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy |
Apr 18, 2023 | [Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy |
May 25, 2023 | [Solicitation (Original)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Aquatic Herbicide Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH
Federal Agency
Follow FD2020-22-00094 Active Contract Opportunity Notice ID Related Notice Department/Ind. Agency DEPT OF
DEPT OF DEFENSE
Bid Due: 1/19/2027
Follow Willow Creek Fire Rehabilitation Seed Propagation Active Contract Opportunity Notice ID 140L0623Q0030
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/20/2024
Follow F--Notice of intent Active Contract Opportunity Notice ID DOIAFBO240087 Related Notice Department/Ind.
INTERIOR, DEPARTMENT OF THE
Bid Due: 5/01/2024