Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I

Agency: DEPT OF DEFENSE
State: Federal
Type of Government: Federal
FSC Category:
  • F - Natural Resources and Conservation Services
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: May 25, 2023
Due Date: Jun 27, 2023
Solicitation No: W911XK23B0003
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Follow
Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I
Active
Contract Opportunity
Notice ID
W911XK23B0003
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
LRD
Office
W072 ENDIST DETROIT
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: May 25, 2023 02:19 pm EDT
  • Original Date Offers Due: Jun 27, 2023 02:00 pm EDT
  • Inactive Policy: Manual
  • Original Inactive Date: Jul 11, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: F108 - ENVIRONMENTAL SYSTEMS PROTECTION- ENVIRONMENTAL REMEDIATION
  • NAICS Code:
    • 237110 - Water and Sewer Line and Related Structures Construction
  • Place of Performance:
Description
Environmental Remediation Services Construction project to implement system upgrade recommendations for theOtt Story Superfund Site Operable Unit #2 Groundwater Remedy in Muskegon (Dalton Township), Michigan. Thedesign is intended to improve the effectiveness of the collection system to maintain contaminated groundwaterplume capture and contaminant mass removal for the OU1/OU2 remedy. The work includes the followingmajor items:a. Install new extraction wells, associated appurtenances, and connect to existing system. New wells are numberedto coordinate with existing wells: EW-2a, EW-3a, EW 4a, EW-5a, EW-6b.b. Installation of three new rehabilitation wells at each new EW location (total of 15 wells) to allow for chemicalrehabilitation of the well and aquifer immediately surrounding the well.c. Installation of below grade electrical conduit within concrete ductbank from each new EW location back to thecontrol panel.d. Installation of above-ground weatherproof enclosures for each new extraction well piping and flow measurementequipment.e. Upgrade and replace existing manifold piping and appurtenances in below grade EW vaults (EW-1, EW-2, EW-3,EW-4, EW-5, EW-7, EW-8 and EW-9) with PVC materials (3 inch diameter).f. Replace all system flow meters with consistent make/model.g. Install pressure gauges on collection lines E and F in Valve Vaults 1, 2 and 3. There are no existing gauges in thevaults. No comm or power wiring for gauges is required.h. Install new standby back-up power generation and control for the new well extraction well network.i. Upgrade controls infrastructure to allow remote monitoring of the expanded well extraction well network.j. Complete monitoring well abandonment actions to optimize the existing well network.All pre-field planning documents to include the Accident Prevention Plan, Health and Safety Plan, Well InstallationPlan, Work Plan, Quality Control (QC) Plan, and Environmental Protection Plan must be approved by theContracting Officer before construction work begins.Please note that some well locations may require 72 hour prior notice before being granted access to the site.
Attachments/Links
Contact Information
Contracting Office Address
  • CONTRACTING OFFICE KO 477 MICHIGAN AVE RM 617
  • DETROIT , MI 48226-5000
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • May 25, 2023 02:19 pm EDTSolicitation (Original)

Related Document

Feb 17, 2023[Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy
Mar 6, 2023[Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy
Mar 27, 2023[Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy
Apr 18, 2023[Presolicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy
Jun 27, 2023[Solicitation (Updated)] Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Follow Aquatic Herbicide Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH

Federal Agency

Follow F--Notice of intent Active Contract Opportunity Notice ID DOIAFBO240087 Related Notice Department/Ind.

INTERIOR, DEPARTMENT OF THE

Bid Due: 5/01/2024

Follow FD2020-22-00094 Active Contract Opportunity Notice ID Related Notice Department/Ind. Agency DEPT OF

DEPT OF DEFENSE

Bid Due: 1/19/2027

Follow Willow Creek Fire Rehabilitation Seed Propagation Active Contract Opportunity Notice ID 140L0623Q0030

INTERIOR, DEPARTMENT OF THE

Bid Due: 8/20/2024