Murrieta Creek Phase 2B
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | California |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 29, 2025 |
| Due Date: | Jun 13, 2025 |
| Solicitation No: | W912PL25BA004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: May 29, 2025 11:29 am PDT
- Original Published Date: May 02, 2025 01:42 pm PDT
- Updated Date Offers Due: Jun 13, 2025 01:00 pm PDT
- Original Date Offers Due: Jun 04, 2025 02:00 pm PDT
- Inactive Policy: Manual
- Updated Inactive Date: May 02, 2026
- Original Inactive Date: May 02, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Murrieta Creek, Riverside County, CA Temecula , CA 92590USA
**AMENDMENT 0001 & AMENDMENT 0002 posted to PIEE- Please follow the below provided Links to Soliciation and Amendmnet Updates** The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary and Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing
- KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
- LOS ANGELES , CA 90017-3409
- USA
- Ashley Powell
- ashley.s.powell@usace.army.mil
- Phone Number 2134523241
- Michael Robinson
- MICHAEL.G.ROBINSON@USACE.ARMY.MIL
- Phone Number 2134523311
- May 29, 2025 11:29 am PDTSolicitation (Updated)
- May 02, 2025 01:42 pm PDT Solicitation (Original)
Related Document
| Apr 18, 2025 | [Presolicitation (Original)] Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration |
| Apr 21, 2025 | [Presolicitation (Updated)] Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration |
| May 2, 2025 | [Solicitation (Original)] Murrieta Creek Phase 2B |
| Jun 4, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jun 10, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jun 17, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jul 1, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jul 2, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
| Jul 7, 2025 | [Solicitation (Updated)] Murrieta Creek Phase 2B |
See Also
Project Summary Project ID: BRC0000673 Project Name: Construction Manager at Risk Pre-Construction and
La County
Due by 10/13/2026
Project ID: Title: Breeze Hill Park Phase I Pickleball Court Improvement Project (CIP
City of Vista
Due by 10/08/2026
Basic Information Title VSP and CCWF New Potable Water Wells Agency Dept of
State Government of California
Due by 10/02/2026
Basic Information Title SB Minor B - Construct communication system Mendocino County Agency
State Government of California
Due by 9/21/2026