| Agency: | North Carolina State University |
|---|---|
| State: | North Carolina |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 25, 2025 |
| Due Date: | Mar 21, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
| Institution | UNC Greensboro | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://fac.uncg.edu/wp-content/uploads/20250217_Moore-Bldg_DesignerAd.pdf | |||||
| Project Name | Moore Building Renovation | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Wendi Stogner | |||||
| Phone Number | (336) 608-9418 | |||||
| Contact Email | wcstogner@uncg.edu | |||||
| Closing Date | 03/21/2025 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
UNC Greensboro is seeking letters of interest from qualified professionals for the Moore Building Renovation project. The Moore Building has not seen a significant renovation since it was constructed in 1969. Spanning 23,502 assignable square feet (41,631 GSF), the building has served as a hub for academic activity, previously housing the Nursing program alongside general-purpose classrooms. The purpose of this project is to transform the Moore Building into a state-of-the-art facility that supports interdisciplinary collaboration, program growth, and academic excellence. This project is a comprehensive, transformational renovation, including new plumbing, mechanical, electrical, sprinkler and fire alarm systems; roof and window replacement; and accessibility and site improvements to enhance the building's use and future sustainability. Interior demolition and abatement will occur as necessary to ensure the Moore Building functions as a "new" facility while maximizing space for academic and institutional purposes. During the project's development, LEED certification will be evaluated and considered. The renovation will plan to house Health and Human Services (HHS) programs, including advising and dedicated space for a proposed Doctor of Occupational Therapy program with instructional lab, offices, and flexible support spaces. Existing classroom spaces will be retained and modernized where feasible, including a ground-level 160-person auditorium and two second-floor classrooms with fixed seating. Remaining ASF will be evaluated during programming for alteration and renovation for possible change-in-use and future flexibility to align with evolving program needs. Letters of Interest due by 12:00 p.m. on March 21, 2025
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
Submissions accepted only by email to Wendi Stogner, fdc@uncg.edu, UNC Greensboro Facilities Design & Construction
|
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow Replacement Dining Area Lighting at WC100 Active Contract Opportunity Notice ID N4008526R9061
DEPT OF DEFENSE
Bid Due: 8/10/2026
Follow W912PM26BA007 - MAINTENANCE DREDGING, WILMINGTON HARBOR ANCHORAGE BASIN AND MID RIVER CHANNELS
DEPT OF DEFENSE
Bid Due: 8/26/2026
RFQ Number 2720 Sedimentation Basin Rehabilitation at Coddle Creek WTP Submissions Due: 8-26-2026
City of Concord
Bid Due: 8/26/2026
Follow FY26 Multiple Location BEQ Parking Lot Repairs Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 8/19/2026