Fire suppression system installation
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Texas |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Jul 24, 2026 |
| Due Date: | Aug 7, 2026 |
| Solicitation No: | 12639526Q0210 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jul 24, 2026 08:36 am CDT
- Original Published Date: Jul 08, 2026 01:17 pm CDT
- Updated Date Offers Due: Aug 07, 2026 12:00 pm CDT
- Original Date Offers Due: Aug 06, 2026 12:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Aug 22, 2026
- Original Inactive Date: Aug 21, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1JZ - CONSTRUCTION OF MISCELLANEOUS BUILDINGS
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Edinburg , TX 78541USA
Due to a recent fire in building 6418 at Moore Air Base, Texas, a wet fire suppression system is needed. Building 6418 was constructed in the early 1980s with no fire suppression initially. Contractor shall provide design/as-built drawings submittals and installation of a new retrofitted system. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system.
Solicitation documents are posted below.
NOTE: For those wishing to attend the site visit, please send names of attendees to james.g.roloff@usda,gov. A valid drivers license or state ID is required.
Amendment 1 is posted below.
RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into? If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote? The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed.
The sign-in sheet for the site visit is posted below.
- 250 MARQUETTE AVENUE SUITE 410
- MINNEAPOLIS , MN 55401
- USA
- Jim Roloff
- james.g.roloff@usda.gov
- Phone Number 6125907603
- Jul 24, 2026 08:36 am CDTCombined Synopsis/Solicitation (Updated)
- Jul 13, 2026 02:25 pm CDT Combined Synopsis/Solicitation (Updated)
- Jul 10, 2026 01:54 pm CDT Combined Synopsis/Solicitation (Updated)
- Jul 09, 2026 07:32 am CDT Combined Synopsis/Solicitation (Updated)
- Jul 08, 2026 01:17 pm CDT Combined Synopsis/Solicitation (Original)
Related Document
| Jul 8, 2026 | [Combined Synopsis/Solicitation (Original)] Fire suppression system installation |
| Jul 9, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Jul 10, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Jul 13, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Jul 28, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Aug 2, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Aug 5, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Aug 12, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Aug 17, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Aug 18, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Aug 21, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
| Sep 11, 2026 | [Combined Synopsis/Solicitation (Updated)] Fire suppression system installation |
See Also
STATE LET CONSTRUCTION CONTRACT, LIBERTY CO, BRIDGE MAINTENANCE Follow Solicitation Solicitation ID: 0028-03-119_1226
State Government of Texas
Due by 12/02/2026
STATE LET CONSTRUCTION CONTRACT, WINKLER CO, ROADWAY WIDENING TO A SUPER 2 Follow
State Government of Texas
Due by 12/01/2026
STATE LET CONSTRUCTION CONTRACT, ELLIS CO, WIDEN ROAD - ADD LANES AND SHOULDERS
State Government of Texas
Due by 12/01/2026
STATE LET CONSTRUCTION CONTRACT, POTTER CO, INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
State Government of Texas
Due by 12/02/2026