Project Manual
ESD4J MS Playground Consolidation
Lane County School District 4J
Eugene Public Schools
Eugene, Oregon
January 15, 2026
Project No. CIP 462-900-P0162
DOCUMENT 00 01 01
TITLE PAGE
PROJECT MANUAL:
ESD4J MS Playground Consolidation
Eugene Public School District 4J
Eugene, Oregon
C.I.P. Project No. 462-900-P0162
OWNER:
Eugene School District 4J
715 West 4th Ave.
Eugene, Oregon 97402
POC: A.T Marlar, Project Manager
(541) 790-7417 Office
marlar_a@4j.lane.edu
ARCHITECT:
GMA Architects
860 W Park Street, Ste 300
Eugene, OR 97401
Tel: 541-344-9157
AOR: Joseph E. Moore, AIA
jmoore@gma-arch.com
POC: Bailey Bernheine, AIA
bbernheine@gma-arch.com
CIVIL ENGINEER:
KPFF Consulting Engineers
800 Willamette St, Ste 400
Eugene, OR 97401
Tel: 541-684-4902
POC: Anna Backus, PE
Anna.backus@kpff.com
STRUCTURAL ENGINEER:
Hohbach-Lewin, Inc.
199 E 5th Ave, Ste 23
Eugene, OR 97401
Tel: 541-349-1701
POC: Brent Crawford
bcrawford@hohbach-lewin.com
ELECTRICAL ENGINEER:
JLG Engineering, LLC
Tel: 541-912-0065
POC: Jeffery L. Graper, PE
jeffgraper@jlgengineering.com
PLAYGROUND EQUIPMENT
VENDOR:
MRC Recreation
Tel: 800-922-0070
POC: Martha Rainey
martha@mrcrec.com
DATE: January 15th, 2026
TITLE PAGE
00 01 01 - 1
DOCUMENT 00 01 10
PROJECT MANUAL TABLE OF CONTENTS
ESD4J MS Playground Consolidation
CIP 462-900-P0162
December 4, 2025
The following is a list of all Divisions, Sections, and Drawings which are
included in the Project Manual
INTRODUCTORY PAGES
PAGES
Cover Page
1
Document 00 01 01 Title Page
1
Document 00 01 10 Table of Contents
3
DIVISION 00 BIDDING AND CONTRACT REQUIREMENTS
Document 00 11 13 Invitation To Bid
1
Document 00 21 13 Instructions to Bidders, AIA Document A701
11
Document 00 22 13 Supplementary Instructions to Bidders
5
Document 00 31 13 Notice Summary
1
Document 00 41 13 Bid Form
5
Document 00 43 20 Bid Security
1
Document 00 45 22 First Tier Subcontractor Disclosure Form
1
Document 00 52 13 Form of Agreement A, Sample AIA Document 101
12
Document 00 72 13 General Conditions A. Sample AIA Document A201
64
Document 00 73 43 Prevailing Wage Rates for Public Contracts in Oregon
1
Effective Jan 5, 2026
DIVISION 01 GENERAL REQUIREMENTS
Section 01 11 00
Section 01 21 00
Section 01 22 00
Section 01 23 00
Section 01 25 00
Section 01 29 00
Section 01 30 00
Section 01 31 00
Section 01 32 00
Section 01 33 00
Section 01 40 00
Section 01 50 00
Section 01 60 00
Section 01 61 16
Section 01 70 00
Section 01 73 00
Section 01 73 29
Section 01 74 19
Section 01 77 00
Section 01 78 39
Section 01 78 23
Summary of Work
8
Allowances
3
Unit Prices
2
Alternates
2
Contract Modification Procedures (CR/PO Form)
4
Payment Procedures
3
Administrative Requirements
6
Project Management and Coordination
8
Construction Progress Documentation
4
Submittal Procedures
7
Quality Requirements
4
Temporary Facilities and Controls
7
Product Requirements (Substitution Request Form)
5
Volatile Organic Compound (VOC) Content Restrictions 2
Execution and Closeout Requirements
5
Execution Requirements
6
Cutting and Patching
4
Construction Waste Management & Disposal
3
Closeout Procedures
5
Project Record Documents
3
Operation and Maintenance Data
7
TABLE OF CONTENTS
00 01 10 - 1
TABLE OF CONTENTS – SECTION 00 01 10
DIVISION 02 – EXISTING CONDITIONS
02 41 00
Demolition
DIVISION 03 – CONCRETE
03 10 00
03 20 00
03 30 00
Concrete Forming and Accessories
Concrete Reinforcing
Cast-in-Place Concrete
DIVISION 05 – METALS
05 12 00
05 50 00
Structural Steel Framing
Metal Fabrications
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 60 00
07 61 13
07 92 00
Flashing and Sheet Metal
Standing Seam Metal Roofing
Joint Sealants
DIVISION 09 – FINISHES
09 90 00
Painting and Coating
DIVISION 11 – EQUIPMENT
11 68 23
Exterior Basketball Equipment
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 17 17
32 21 13
32 84 00
32 93 00
Pavement Markings and Vehicular Signage
Chain Link Fences and Gates
Irrigation
Planting
ADDITIONAL TECHNICAL SPECIFICATIONS INCLUDED ON DRAWING SHEETS
DRAWINGS
General Information
G000
COMPOSITE COVER SHEET
Civil
C001
C010
C011
C012
C100
C110
C120
C200
CIVIL NOTES AND ABBREVIATIONS
CIVIL SPECIFICATIONS
CIVIL SPECIFICATIONS
CIVIL SPECIFICATIONS
AWB EXISTING CONDITIONS
AWB DEMOLITION AND EXISTING CONDITIONS PLAN
AWB PAVING, GRADING, AND UTILITY PLAN
CHR EXISTING CONDITIONS
TABLE OF CONTENTS
00 01 10 - 2
C201
C210
C220
C300
C310
C311
C320
C321
C322
C400
C410
C420
C500
C510
C520
C600
C610
C620
C700
C701
C702
Architecture
A100
A110
A111
A200
A210
A211
A300
A310
A311
A312
A313
A320
A321
A400
A410
A411
A420
A421
A500
A510
A511
A600
A610
A611
TABLE OF CONTENTS – SECTION 00 01 10
CHR EXISTING CONDITIONS
CHR DEMOLITION AND EXISTING CONDITIONS PLAN
CHR PAVING, GRADING, AND UTILITY PLAN
EGW EXISTING CONDITIONS
EGW DEMOLITION AND EXISTING CONDITIONS PLAN
EGW DEMOLITION AND EXISTING CONDITIONS PLAN
EGW PAVING, GRADING, AND UTILITY PLAN
EGW PAVING, GRADING, AND UTILITY PLAN
EGW GRADING ENLARGEMENT
KND EXISTING CONDITIONS
KND DEMOLITION AND EXISTING CONDITIONS PLAN
KND PAVING. GRADING, AND UTILITY PLAN
MCN EXISTING CONDITIONS
MCN DEMOLITION AND EXISTING CONDITIONS PLAN
MCN PAVING, GRADING, AND UTILITY PLAN
SPC EXISTING CONDITIONS
SPC DEMOLITION AND EXISTING CONDITIONS PLAN
SPC PAVING, GRADING, AND UTILITY PLAN
CIVIL DETAILS
CIVIL DETAILS
CIVIL DETAILS
AWBREY PARK – COVER SHEET
DEMOLITION PLAN
ARCHITECTURAL SITE PLAN
CHARLEMAGNE – COVER SHEET
DEMOLITION PLAN
ARCHITECTURAL SITE PLAN
EDGEWOOD – COVER SHEET
PARTIAL DEMOLITION SITE PLAN – NORTH
PARTIAL DEMOLITION SITE PLAN – SOUTH
ARCHITECTURAL SITE PLAN – NORTH
ARCHITECTURAL SITE PLAN – SOUTH
ENLARGED COVERED PLAY STRUCTURE PLANS
COVERED PLAY ELEVATIONS & SECTIONS
KENNEDY – COVER SHEET
DEMOLITION PLAN
ARCHITECTURAL SITE PLAN
ENLARGED COVERED PLAY STRUCTURE PLANS
COVERED PLAY ELEVATIONS & SECTIONS
MCCORNACK – COVER SHEET
DEMOLTION PLAN
ARCHITECTURAL SITE PLAN
SPRING CREEK – COVER SHEET
DEMOLTION PLAN
ARCHITECTURAL SITE PLAN
TABLE OF CONTENTS
00 01 10 - 3
This page summarizes the opportunity, including an overview and a preview of the attached documents.