Procurement #: 51027>
CITY OF PROVIDENCE, RHODE ISLAND
Department: Public Works
RFP Title: City of Providence – On-Call Sewer & Drainage Repairs (Blanket Contract 2026-
2030)
Opening Date: 12/1/2025
Addendum #: 4
Issue Date: 11/21/2025
The purpose of this addendum is:
Addendum No. 4 is issued to respond to questions raised during the pre-bid period and to
correct inconsistencies in the contract documents prior to the bid opening.
Providence City Hall
25 Dorrance Street
Providence, RI 02903
CITY OF PROVIDENCE
ON-CALL SEWER & DRAINAGE REPAIRS
(BLANKET CONTRACT 2026-2030)
ADDENDUM NO. 4
The following changes, revisions and/or supplemental information, as applicable, are hereby issued as
ADDENDUM NO. 4 in connection with the Contract Documents (Specifications) issued for the
above-referenced project.
This Addendum corrects the language concerning cost-plus work to align with the fixed markups
established in the Bid Schedule, and clarifies the Warranty Period (2-Year vs. 5-Year) to differentiate
between the General Guarantee and Pavement Restoration liabilities. Additionally, it provides
responses to bidder questions submitted during the pre-bid period.
REVISIONS TO THE REQUEST FOR PROPOSALS (RFP):
1. Replace Contract Book page 30, with the attached, revised pages. (See attachment: Contract
Book (Page 30) - REVISED PER ADDENDUM NO. 4).
Note: For all replacements, Addendum No. 4 is noted in the header, and all revisions are
noted in red font. The original Appendices remain unchanged unless they were
specifically included in the items above or previous Addenda.
RESPONSE TO BIDDER QUESTIONS & CLARIFICATIONS
1. Question 1: Can any specialty category perform the role of a General Contractor (Prime
Contractor) on a job with more than one specialty in scope?
Response: Yes. Any qualified firm may act as the Prime Contractor so long as their pre-
qualified specialty is included in the proposed scope of work. Future Task Order solicitations
will be distributed based on the scope of work required:
• Singular Specialty Scope: Projects involving a single specialty (e.g., CCTV Inspection
only) will be solicited to those contractors pre-qualified in that specific category.
• Mixed Specialty Scope: Projects involving multiple specialties (e.g., Open Cut repairs
combined with CIPP lining) will be solicited to the entire group of pre-qualified
contractors.
2. Question 2: Are we required to use only qualified specialists in the final on-call group that is
awarded? For example, if we have a job and it has both specialties, am I required to use a
CCTV operator or CIPP installer from the on-call list?
Response: The Prime Contractor is not required to subcontract to another firm on the City's
pre-qualified list. The subcontractor MUST still meet the minimum technical qualifications
for that specialty as defined in Section 2.10 “Statement of Bidder's Qualifications” (e.g.,
NASSCO PACP certification, minimum footage experience, etc.). The Prime Contractor
remains responsible for verifying and documenting that the subcontractor meets those
standards and providing this material to OWNER for confirmation. The Prime Contractor is
fully responsible for the entire project, including all subcontractor liability, coordination,
DEPARTMENT OF PUBLIC WORKS,
75 CHAPMAN STREET, PROVIDENCE, RI 02905
PHONE (401) 680-7500 | FAX (401) 941-2567
CITY OF PROVIDENCE
ON-CALL SEWER & DRAINAGE REPAIRS
(BLANKET CONTRACT 2026-2030)
scheduling, insurance, and warranty for the whole scope.
3. Question 3: What’s the warranty period for the work 2-Year or 5-Year?
Response: To eliminate confusion between the General Guarantee and pavement restoration
liabilities:
• The General Guarantee (Construction Agreement, Section 3.13) remains two (2) years
from the date of final payment for all pipe, structure, and general workmanship.
• The five (5) year warranty period for pavement settlement as specified in Appendix C,
Tech Specs - 2 ('Standards for Road and Sidewalk Openings', Section 4.2) shall govern for
all pavement restoration work. The Contractor is responsible for correcting any pavement
settlement (0.25" vertical difference or greater) for a full five (5) years from the completion
of final restoration.
4. Question 4: Do we need to submit MBE/WBE plans and percentages or First Source /
Apprenticeship materials with this bid?
Response: No. These utilization plans are not required for the initial Contract bid. However,
they will be required to be submitted for each specific Scoped Task Order solicited under the
contract. However, should you have already secured the services of MBE or WBE contractors,
you may provide them on your proposed subcontractor form.
All other terms, conditions, and specifications of the Request for Proposals remain unchanged.
Bidders must acknowledge receipt of this Addendum No. 4 (as well as Addenda No. 1 through 3) in
their bid submission.
Should you have any questions, please do not hesitate to contact Roger Biron at 401-680-7531.
Respectfully,
Roger C. Biron
City of Providence
Department of Public Works
Attachments:
1. Contract Book (Page 30) - REVISED PER ADDENDUM NO. 4
DEPARTMENT OF PUBLIC WORKS,
75 CHAPMAN STREET, PROVIDENCE, RI 02905
PHONE (401) 680-7500 | FAX (401) 941-2567
ADDENDUM NO. 4
DEPARTMENT OF PUBLIC WORKS
CITY OF PROVIDENCE, RHODE ISLAND
CONTRACT BOOK
CITY OF PROVIDENCE,
ON-CALL SEWER & DRAINAGE REPAIRS
(BLANKET CONTRACT 2026-2030)
from him covering the work involved in the change after which the procedure shall be as
follows:
1. If the proposal is acceptable, the OWNER will prepare the change order in accordance
with Paragraph E below for acceptance by the Contractor, and
2. If the proposal is not acceptable and prompt agreement between the two parties cannot
be reached, the OWNER may order the Contractor to proceed with the work on a time
and materials basis, defined as the net cost of the Contractor's labor, equipment,
materials, and subcontractor costs plus the overhead and profit markups defined in
Section 5.9.F, the total cost not to exceed a specified limit.
E. Each change order shall include in its final form:
1. A detailed description of the change in the work.
2. The Contractor's proposal (if any) or a conformed copy thereof.
3. A definite statement as to the resulting change in the contract price and/or time.
4. The statement that all work involved in the change shall be performed in accordance with
Contract requirements except as modified by the change order.
F. For any changes agreed by OWNER and the Contractor, the Contractor shall be allowed a
markup on any additional work not accounted for, as follows:
1. The Contractor shall consider a markup of cost of work plus general conditions at three
percent (3%) plus overhead and profit at nine percent (9%).
2. The Subcontractor shall consider a markup of cost of work plus general conditions at
three percent (3%) plus overhead and profit at nine percent (9%).
3. The Contractor’s markup on Subcontractors shall be five percent (5%).
4. Labor and equipment rates shall be as provided as part of the original Bid document.
5.10. CLAIMS FOR EXTRA COST
A. If the Contractor has any claims for additional cost or extension of time, they shall, within three
days after the occurrence of the claim, and in any event before proceeding to execute the
work, submit their claim in writing to the OWNER, stating clearly in detail the basis of the
claim. No such claim will be considered unless so made.
B. Claims for additional compensation for extra work, due to alleged errors in ground elevations,
contour lines, or benchmarks, will not be recognized unless accompanied by certified survey
data, made prior to the time the original ground was disturbed, clearly showing that errors exist
which resulted, or would result, in handling more material, or performing more work, than
would be reasonably estimated from the Drawings and maps issued.
C. Any discrepancies which may be discovered between actual conditions and those represented
by the Drawings and maps shall at once be reported to the OWNER and work shall not
proceed except at the Contractor's risk, until written instructions have been received by him
from the OWNER.