CITY OF PROVIDENCE
ON-CALL SEWER & DRAINAGE REPAIRS
(BLANKET CONTRACT 2026-2030)
ADDENDUM NO. 2
The following changes, revisions and/or supplemental information, as applicable, are hereby issued as
ADDENDUM NO. 2 in connection with the Contract Documents (Specifications) issued for the
above-referenced project.
This Addendum amends the Schedule of Unit Prices (Appendix A) to remove all line items regarding
Cured-in-Place Pipe (CIPP) Lining, as well as all per-foot unit prices for Cleaning and CCTV.
REVISIONS TO THE REQUEST FOR PROPOSALS
• Replace Bid Form, Schedule of Unit Prices in its entirety with the attached revised version
with Addendum No. 2 in its header.
o To ensure pricing accuracy and competitiveness, future services for these items will be
solicited on a per-project basis. Since CIPP and CCTV & Cleaning costs are driven by
highly variable site-specific factors—such as bypass pumping requirements, installation
depth, access constraints, and run length—fixed unit prices are often inaccurate over
multi-year terms. By retaining the Day Rate specifically for emergencies, the City ensures
immediate responsiveness while guaranteeing that planned work is bid competitively
based on actual site conditions.
o Consequently, Cured-in-Place Pipe (CIPP) Lining and Cleaning & CCTV Contractors
will be qualified based on experience (per Section 2.10.C) and shall submit pricing upon
request for specific projects (per Special Condition 6.1).
• To be considered responsive and be qualified, bidders must meet all requirements for their desired
category, including submitting pricing for all remaining bid items applicable to that category:
o Open-Cut Bidders: Must meet 2.10.D qualifications AND submit pricing for Parts 1, 2,
and 3.
o Sewer & Drain Cleaning & CCTV Bidders: Must meet 2.10.F qualifications AND submit
pricing for Parts 3 and 4 (Items 5a, 5b, and 5c).
o Trenchless Rehabilitation (CIPP) Bidders: Must meet 2.10.E qualifications AND submit
pricing for Parts 3 and 4 (Items 5a, 5b, and 5c).
All other terms, conditions, and specifications of the Request for Proposals remain unchanged.
Bidders must acknowledge receipt of this Addendum No. 2 in their bid submission.
Should you have any questions, please do not hesitate to contact Roger Biron at 401-680-7531.
Respectfully,
Roger C. Biron
City of Providence
Department of Public Works
DEPARTMENT OF PUBLIC WORKS,
75 CHAPMAN STREET, PROVIDENCE, RI 02905
PHONE (401) 680-7500 | FAX (401) 941-2567
Note: The rates you provide in Parts 1 and 2 of the
"Schedule of Unit Rates" are the final, all-inclusive
rates that will be used for any work paid on a time
and materials basis. These rates are understood to
already include your company's overhead, profit,
insurance, and other administrative costs for
providing that labor or equipment.
CITY OF PROVIDENCE,
ON-CALL SEWER & DRAINAGE REPAIRS
(BLANKET CONTRACT 2026-2030)
ADDENDUM NO. 2
Part 1
LABOR RATES
(OPEN-CUT CONTRACTORS ONLY)
1. Labor Rates per hour - includes insurance, fringes, and overhead
(Submission of Certified Payrolls required)
a. Foreman
Classification
b. Heavy Equipment Operator
Classification
c. Truck Driver
Classification
d. Laborer
Classification
e.
Classification
f.
Classification
g.
Classification
Use additional sheets if necessary
SCHEDULE OF UNIT PRICES
$
Standard Rate per hour
$
Overtime Rate per hour
$
Standard Rate per hour
$
Overtime Rate per hour
$
Standard Rate per hour
$
Overtime Rate per hour
$
Standard Rate per hour
$
Overtime Rate per hour
$
Standard Rate per hour
$
Overtime Rate per hour
$
Standard Rate per hour
$
Overtime Rate per hour
$
Standard Rate per hour
$
Overtime Rate per hour
Page 2 of 8
Note: The rates you provide in Parts 1 and 2 of the
"Schedule of Unit Rates" are the final, all-inclusive
rates that will be used for any work paid on a time
and materials basis. These rates are understood to
already include your company's overhead, profit,
insurance, and other administrative costs for
providing that labor or equipment.
CITY OF PROVIDENCE,
ON-CALL SEWER & DRAINAGE REPAIRS
(BLANKET CONTRACT 2026-2030)
ADDENDUM NO. 2
Part 2
EQUIPMENT RATES
(OPEN-CUT CONTRACTORS ONLY)
2. Equipment Rates
a.
Type
Make
$
Year
Rate per hour
b.
Type
Make
$
Year
Rate per hour
c.
Type
Make
$
Year
Rate per hour
d.
Type
Make
$
Year
Rate per hour
e.
Type
Make
$
Year
Rate per hour
f.
Type
Make
$
Year
Rate per hour
g.
Type
Make
$
Year
Rate per hour
h.
Type
Make
$
Year
Rate per hour
I.
Type
Make
$
Year
Rate per hour
j.
Type
Make
$
Year
Rate per hour
k.
Type
Use additional sheets if necessary
SCHEDULE OF UNIT PRICES
Make
$
Year
Rate per hour
Page 3 of 8