2025C026 Chugiak Senior Housing Generator Replacement

Attachment Preview

MUNICIPALITY OF ANCHORAGE
CHUGIAK SENIOR HOUSING GENERATOR REPLACEMENT
CHUGIAK, ALASKA
100% ISSUED FOR CONSTRUCTION 01.30.2025
MUNICIPALITY OF ANCHORAGE
22424 BIRCHWOOD LOOP ROAD
DRAWING INDEX
Sheet Number
Sheet Title
GENERAL
G-001 TITLE SHEET
ELECTRICAL
E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
E-002 ELECTRICAL SPECIFICATIONS
E-003 ELECTRICAL SPECIFICATIONS
E-004 ELECTRICAL SPECIFICATIONS
E-101 ELECTRICAL OVERALL SITE PLAN
E-102 ELECTRICAL
E-103 ELECTRICAL
E-104 ELECTRICAL DEMOLITION ONE-LINE DIAGRAM
E-105 ELECTRICAL ONE-LINE DIAGRAM
E-106 CALCULATIONS
E-110 DETAILS
LOCATION MAP
RUSSIA
ARCTIC
OCEAN
RUSUSSIAA
BERING
SEA
ALASKA
FAIRBANKS
CHUGIAK
ANCHORAGE
CANADA
PROJECT
LOCATION
JUNEAU
GULF OF
ALASKA
KETCHIKAN
PACIFIC
OCEAN
OWNER:
MUNICIPALITY OF ANCHORAGE
MAINTENANCE & OPERATIONS DEPARTMENT
3640 E Tudor Road
Warehouse No. 1
Anchorage, AK 99507
Project Manager: Travis O'Rourke
ph 907.350.2784
ELECTRICAL ENGINEERS:
301 W. Northern Lights Blvd.
Suite 200
Anchorage, AK 99503
ph 907.276.6664
www.coffman.com AECC249
VICINITY MAP
CHUGIAK
EAGLE RIVER
ANCHORAGE
PROJECT LOCATION:
22424 BIRCHWOOD
LOOP RD.
1
2
3
4
5
GENERAL NOTES:
11. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN EQUIPMENT GROUNDING CONDUCTOR IN ALL 25. PROVIDE TYPED, UPDATED PANEL SCHEDULES FOR NEW PANELS AND PANELS MODIFIED BY THIS
1. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH THE CURRENT NATIONAL ELECTRICAL CODE,
CONDUITS OR CABLING.
PROJECT.
NFPA 72, STATE AND LOCAL AMENDMENTS, AND NECA STANDARDS OF INSTALLATION.
2. ALL ELECTRICAL EQUIPMENT AND MATERIALS SHALL BE LISTED AND LABELED FOR THEIR
INTENDED APPLICATION BY A NATIONALLY RECOGNIZED TESTING LABORATORY ACCEPTABLE TO
THE AUTHORITY HAVING JURISDICTION.
12. OUTAGES OF ELECTRICAL, TELECOMMUNICATIONS, FIRE ALARM, OR SECURITY SYSTEMS SHALL
OCCUR AT AN ABSOLUTE MINIMUM. COORDINATE SCHEDULED OUTAGES WITH THE OWNER AND
GENERAL CONTRACTOR.
13. ALL CONDUIT AND CABLE SHALL BE INSTALLED ORTHOGONAL TO THE STRUCTURE.
3. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UTILITIES AND STRUCTURES AFFECTING
THE WORK. NOTIFY THE PROJECT MANAGER IN WRITING OF ANY DISCREPANCIES BETWEEN
EXISTING CONDITIONS AND THOSE SHOWN IN THE CONTRACT DOCUMENTS WHICH ADVERSELY
14. NEW ELECTRICAL DEVICES SHALL BE INSTALLED TO MATCH THE HEIGHT OF EXISTING DEVICES.
D
IMPACT THE WORK.
15. SURFACE MOUNTED CONDUIT IS NOT ALLOWED EXCEPT IN MECHANICAL ROOMS, ELECTRICAL
4. CONTACT LOCAL UTILITY PROVIDERS FOR UTILITY LINE LOCATES PRIOR TO COMMENCING
ROOMS, COMMUNICATIONS ROOMS, AND BOILER ROOMS, UNLESS OTHERWISE NOTED ON THE
DRAWINGS.
EXCAVATION ON THE SITE.
26. DRAWINGS ARE SCHEMATIC ONLY AND DO NOT SHOW ALL CONDUIT AND CONNECTIONS BETWEEN
RESPECTIVE DEVICES AND FIXTURES. CONTRACTOR SHALL DETERMINE THE EXACT ROUTING OF
CONDUIT, CABLE, AND WIRING CONNECTIONS BETWEEN RESPECTIVE DEVICES AND FIXTURES FOR
A COMPLETE AND OPERATIONAL SYSTEM.
27. ALL EQUIPMENT, INSTRUMENTATION, CONDUIT, MC CABLE, AND WIRING MUST HAVE A FORM OF
IDENTIFICATION. PROVIDE STAINLESS STEEL IDENTITY TAGS FOR ALL NEW EQUIPMENT INSTALLED.
28. COORDINATE INSTRUMENTATION & CONTROLS SCOPE OF WORK WITH ALL TRADES TO AVOID
CONFLICTS AND MAINTAIN CONSTRUCTION SCHEDULE. REFER TO COMPLETE PROJECT WORK
PACKAGE TO FACILITATE FIELD COORDINATION.
5. EXISTING EQUIPMENT INFORMATION SHOWN ON THESE DRAWINGS SHOULD BE FIELD VERIFIED.
CONFIRM NEW EQUIPMENT LOCATIONS WITH OWNER AND ADJUST AS REQUIRED.
6. APPROVED-EQUAL EQUIPMENT: EQUIPMENT SHOWN OR SPECIFIED ON THE DRAWINGS WAS
USED AS THE BASIS-OF-DESIGN. DIFFERENT MAKES, MODELS AND MANUFACTURERS MAY BE
16. ALL CONDUCTOR SIZES SHOWN ARE BASED ON COPPER UNLESS NOTED OTHERWISE.
17. MAINTAIN A MINIMUM 6” CLEARANCE BETWEEN CONDUIT AND PIPING. MAINTAIN A 12” CLEARANCE
BETWEEN CONDUIT AND HEAT SOURCES SUCH AS FLUES, HEATING PIPES, AND HEATING
APPLIANCES.
29. EXISTING CONDITIONS SHOWN ON THESE DRAWING ARE BASED ON RECORD DRAWINGS AND A
NON-DESTRUCTIVE SITE INVESTIGATION OF THE FACILITY. THERE IS NO WARRANTY OR
GUARANTEE AS TO THE ACCURACY OF THE INFORMATION SHOWN HERE-IN. THE CONTRACTOR
SHALL FIELD VERIFY EXISTING CONDITIONS AND ALL ITEMS SCHEDULED FOR DEMOLITION PRIOR
TO THE START OF WORK.
PROVIDED WHEN THE SUBSTITUTE IS OF SUBSTANTIALLY THE SAME FUNCTION, QUALITY,
RELIABILITY, ETC. AND HAS BEEN SUBMITTED AND APPROVED BY THE OWNER AS AN
EQUIVALENT PRODUCT.
18. VERIFY CEILING TYPES THROUGHOUT THE PROJECT PRIOR TO ORDERING LIGHT FIXTURES.
PROVIDE COMPATIBLE MOUNTING ACCESSORIES AND ALL TRIM, FLANGES, SUPPORTS, OUTLET
BOXES, ETC. FOR A COMPLETE AND FINISHED INSTALLATION.
30. THE OWNER SHALL HAVE FIRST RIGHT OF REFUSAL FOR ALL SALVAGEABLE MATERIALS. THE
CONTRACTOR SHALL DELIVER SALVAGED MATERIALS TO A LOCATION AS DIRECTED BY THE OWNER
IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
PERMIT STAMP
7. CONTRACTOR SHALL DISPOSE OF ALL DEMOLISHED AND UNUSED EQUIPMENT AND MATERIALS
OFFSITE IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS.
8. CONTRACTOR SHALL MAINTAIN A RED-LINE SET OF CONSTRUCTION DOCUMENTS DURING
CONSTRUCTION. RED-LINE DRAWINGS SHALL BE SUBMITTED TO THE OWNER UPON PROJECT
COMPLETION.
19. THE ELECTRICAL INSTALLATION SHALL COMPLY WITH THE CURRENT NEC ARTICLES 500. PROVIDE
CONDUIT SEALS AT ALL BOUNDARY LOCATIONS AS REQUIRED.
20. CIRCUIT NUMBERS ARE SHOWN NEXT TO ELECTRICAL DEVICES ONLY. REFER TO THE EQUIPMENT
SCHEDULE IF A CIRCUIT ASSIGNMENT IS NOT SHOWN ON THE PLANS. PROVIDE WIRING AS SHOWN
ON DRAWINGS AND LISTED IN SPECIFICATIONS.
31. ALL NEW CIRCUIT BREAKERS PROVIDED FOR EXISTING DISTRIBUTION EQUIPMENT SHALL BE
SUITABLE AND LISTED FOR USE IN THE EXISTING EQUIPMENT AND SHALL HAVE AN AIC RATING TO
MAINTAIN DISTRIBUTION EQUIPMENT SHORT CIRCUIT CURRENT RATING.
21. ANY PENETRATION OF THE BUILDING VAPOR BARRIER SYSTEM SHALL BE APPROPRIATELY SEALED
9. ALL WIRING INSTALLED IN UNHEATED OR EXTERIOR SPACES SHALL BE XHHW-2. INTERIOR WIRING
TO RETAIN THE INTEGRITY OF THE WALL OR ROOFING SYSTEM. THIS INCLUDES, BUT IS NOT
MAY BE THHW/THHN UNLESS NOTED OTHERWISE.
LIMITED TO, CONDUITS AND BACKS OF ELECTRICAL BOXES.
SCOPE OF WORK OVERVIEW:
10. CONDUCTORS SHALL BE #12 AWG COPPER MINIMUM OR AS SHOWN ON DRAWINGS. HOME RUN
CONDUCTORS SHALL BE #10 AWG COPPER MINIMUM OR AS REQUIRED BY THE NEC. THE MINIMUM
SIZE FOR 20A BRANCH CIRCUITS MEASURED FROM THE PANELBOARD TO THE FURTHEST DEVICE
ON THE CIRCUIT UNLESS NOTED ON DRAWINGS:
22. SEAL ALL RACEWAYS SUBJECT TO MOISTURE TRANSFER OR TRANSITIONING FROM INTERIOR TO
EXTERIOR OF THE BUILDING IN ACCORDANCE WITH NEC. REFERENCE NEC 225.27, 230.8, 300.5(G)
AND 300.7(A).
#10 AWG CONDUCTORS FOR 120V BRANCH CIRCUITS GREATER THAN 75'
23. LOCATIONS OF EQUIPMENT SHOWN ARE APPROXIMATE ONLY.
#8 AWG CONDUCTORS FOR 120V BRANCH CIRCUITS GREATER THAN 175'
C
INCREASE GROUND CONDUCTOR SIZE PER NEC
FOR 15A AND 20A CIRCUITS, TRANSITION TO #12 AWG WITHIN 15' OF DEVICE IF A SMALL
24. CUT AND PATCH THE EXISTING CEILING AND WALLS AS REQUIRED TO INSTALL NEW BRANCH
CIRCUITS. ANY PATCHES SHALL BE FINISHED TO MATCH THE EXISTING ADJACENT SURFACES.
REPLACE ANY DAMAGED CEILING TILES AS REQUIRED.
CONDUCTOR IS REQUIRED FOR DEVICE TERMINATION.
THE SCOPE OF THIS PROJECT IS TO REPLACE THE EXISTING 60KW GENERATOR LOCATED IN THE SECOND FLOOR ELECTRICAL ROOM WITH A NEW 60KW
GENERATOR, AND TO PROVIDE A NEW ELECTRICAL SERVICE TO SUPPLY THE EXISTING 20HP FIRE PUMP. DEMOLITION AND/OR REMOVAL OF THE EXISTING
GENERATOR, FIRE PUMP TRANSFER SWITCH, DISCONNECT SWITCH, CONDUCTORS, AND OTHER EQUIPMENT AND WIRING AS SHOWN ON THE DRAWINGS, AS WELL
AS PROVISION AND INSTALLATION OF ANCILLARY COMPONENTS AND WIRING AS SHOWN ON THE DRAWINGS AND SPECIFICATIONS. ADDITIONALLY, A NUMBER OF
PANELBOARDS WILL BE REFED TO CONNECT THEM TO THE STANDBY SYSTEM.
ELECTRICAL SYMBOLS
ELECTRICAL ABBREVIATIONS
SYMBOL
DESCRIPTION
SYMBOL
DESCRIPTION
ABBREVIATION
DESCRIPTION
ABBREVIATION
DESCRIPTION
2
X-XXXX
DETAIL REFERENCE BUBBLE
METER
A
AMPERE
AC
ALTERNATING CURRENT
AFF
ABOVE FINISHED FLOOR
MAX
MAXIMUM
MBJ
MAIN BONDING JUMPER
MDP
MAIN DISTRIBUTION PANEL
DETAIL / REFERENCE NUMBER
MOTOR CONNECTION
AIP
ABANDONED IN PLACE
AWG
AMERICAN WIRE GAUGE
MEA
MECH
MATANUSKA ELECTRIC ASSOCIATION
MECHANICAL
SHEET NUMBER WHERE DETAIL IS
BATT
BATTERY
MH
MAN HOLE
LOCATED
GENERATOR
BLDG
BUILDING
MIN
MINIMUM
BRKR
BREAKER
ML&P
MUNICIPAL LIGHT & POWER
UGC
UNDERGROUND COMMUNICATIONS
EMERGENCY GENERATOR
C
CABLE - CONDUIT - COIL
CAT
CATEGORY
NC
NEUT, N
NORMALLY CLOSED
NEUTRAL
CB
CIRCUIT BREAKER
NIC
NOT IN CONTRACT
UGE
UNDERGROUND ELECTRICAL
CEA
CHUGACH ELECTRIC ASSOCIATION
NO
NUMBER - NORMALLY OPEN
PANELBOARD
CEI
COFFMAN ENGINEERS INCORPORATED
NRTL
NATIONAL RECOGNIZED
ABOVE GROUND ROUTING
CJB
CONTROL JUNCTION BOX
CKT
CIRCUIT
TESTING LABORATORY
NTS
NOT TO SCALE
TRANSFORMER
COM
COMMUNICATIONS
OH/E
OVERHEAD ELECTRICAL
B
CIRCUIT BREAKER
CP
CATHODIC PROTECTION
CT
CURRENT TRANSFORMER
PH
PHASE
PJB
POWER JUNCTION BOX
RECEPTACLE
CU
COPPER
PK
POWER KIT
CONTACT - NORMALLY OPEN
DIV
DIVISION
PKG
PACKAGE
RECEPTACLE, CEILING MOUNTED
DWG
EA
DRAWING
EACH
PNL
PANEL - PANELBOARD
PR
PAIR
CONTACT - NORMALLY CLOSED
EK
END KIT
PVC
POLYVINYL CHLORIDE CONDUIT
CONTACTOR
RECEPTACLE, SPECIAL PURPOSE
EL
ELEC
(E), E, EXIST
ELEVATION
ELECTRICAL
EXISTING
(R), R
RECEPT
RMC
REPLACE
RECEPTACLE
RIGID METAL CONDUIT
CURRENT TRANSFORMER
JUNCTION BOX
ESD
(ETR), ETR
EMERGENCY SHUT DOWN
EXISTING TO REMAIN
SBJ
SYSTEM BONDING JUMPER
SCH
SCHEDULE
FA
FIRE ALARM
SECT
SECTION
EMERGENCY SHUT DOWN PUSHBUTTON
DISCONNECT SWITCH
FACP
FO
FIRE ALARM CONTROL PANEL
FIBER OPTIC
SHLD
SPEC
SHIELDED
SPECIFICATIONS
FT
FEET FOOT
SSBJ
SUPPLY SIDE BONDING JUMPER
EQUIPMENT CONNECTION
FUSED DISCONNECT SWITCH
GEC
GROUNDING ELECTRODE CONDUCTOR
GFCI
GROUND FAULT CIRCUIT INTERRUPTER
STBY
STD
STANDBY
STANDARD
GFI, G
GROUND FAULT INTERRUPTER
STL
STEEL
FUSE WITH RATING
HANDHOLE
GND
GROUND
GRS
GALVANIZED RIGID STEEL
SUSE
SUITABLE FOR USE AS SERVICE
EQUIPMENT
HH
HANDHOLE
SYS
SYSTEM
FUSED DISCONNECT SWITCH
EQUIPMENT CABINET
HOA
HAND-OFF-AUTO
HP
HORSEPOWER
TB
TEMP
TERMINAL BLOCK
TEMPORARY - TEMPERATURE
HZ
HERTZ - CYCLES PER SEC
TS
TEMPERATURE SENSOR
A
GROUND CONNECTION
AUTOMATIC TRANSFER SWITCH
IC
INTERRUPTING CAPACITY
IN
INCH
TSP
TWISTED SHIELDED PAIR
TYP
TYPICAL
JB, JBOX
JUNCTION BOX
UGC
UNDERGROUND COMMUNICATIONS
kcmil
THOUSAND CIRCULAR MILS
UGE
UNDERGROUND ELECTRICAL
KVA
KILOVOLT AMPERES
UG/T
UNDERGROUND TELEPHONE CABLE
KW
KILOWATT
V
VOLT
KWH
KILOWATT HOUR
W
WATT, WIDE, WEST
LFMC
LIQUID TIGHT FLEXIBLE METAL CONDUIT
WHM
WATT HOUR METER
LTG
LIGHTING
WP
WEATHERPROOF-WHILE-IN-USE
M.A.S.S.
MUNICIPALITY OF ANCHORAGE STANDARD
XFMR
TRANSFORMER
SPECIFICATIONS
Z
IMPEDANCE
ALL SYMBOLS AND ABBREVIATIONS DO NOT NECESSARILY APPEAR ON DRAWINGS
1
2
3
4
5
301 W. Northern Lights Blvd.
Suite 200
Anchorage, AK 99503
ph 907.276.6664
www.coffman.com AECC249
D
TOM E. LOONEY
Jan 30, 2025
TERED
No. EE9369
PROFESSIONA
L
ENG
CHUGIAK SENIOR
CENTER GENERATOR
C REPLACEMENT
MUNICIPALITY OF
ANCHORAGE
100% ISSUED FOR
CONSTRUCTION
B
REV DATE DESCRIPTION
PROJ. NO.
DRAWN
CHECKED
DATE
241484
ALM
TEL
01/30/2025
C COFFMAN ENGINEERS INC.
SHEET TITLE:
ELECTRICAL
LEGEND AND
ABBREVIATIONS
A
SHEET NO:
E-001
1
2
3
4
DIVISION 26 SPECIFICATIONS
PART 1
GENERAL
1.1 SUMMARY
A. THIS SECTION INCLUDES GENERAL REQUIREMENTS FOR ELECTRICAL
INSTALLATION AND IS APPLICABLE TO ALL DIVISION 26 SECTIONS.
1.2 SCOPE OF WORK
METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED FOR THE
CONTRACTOR TO PERFORM HIS WORK. THE CONTRACTOR WILL BE SOLELY AND
COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING
SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF HIS WORK.
THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS. THE DUTY OF THE ENGINEER TO CONDUCT CONSTRUCTION
OBSERVATIONS OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO
INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES,
IN, ON OR NEAR THE CONSTRUCTION SITE.
O. INSTALL INSULATED SPRING WIRE CONNECTORS WITH PLASTIC CAPS FOR COPPER
CONDUCTOR SPLICES AND TAPS, 8 AWG AND SMALLER.
P. WHERE STRANDED CONDUCTORS ARE TERMINATED ON SCREW TYPE TERMINALS
INSTALL CRIMP ON FORK TERMINALS. DO NOT PLACE BARE STRANDED
CONDUCTORS DIRECTLY UNDER SCREWS.
Q. SUPPORT CONDUIT AT MAXIMUM INTERVALS OF 10 FEET AND ADDITIONAL
SUPPORTS AT BENDS, FITTINGS, AND FIXTURES. MAKE CONDUIT SYSTEM RIGID
AND FREE FROM VIBRATION.
A. PROVIDE ALL LABOR. EQUIPMENT, MATERIALS, AND SERVICES REQUIRED FOR A
1.7 SUBMITTALS
R. DETECTABLE UNDERGROUND WARNING TAPE: CONDUCTING UNDERGROUND LINES
COMPLETE INSTALLATION, TESTING, AND STARTUP OF ALL SYSTEMS DENOTED ON
D
THE PLANS AND SPECIFICATIONS.
A. CONTRACTOR SHALL SUBSTANTIATE CONFORMANCE TO THIS SPECIFICATION BY
SUPPLYING THE NECESSARY DOCUMENTS, PERFORMANCE DATA AND WIRING
B. VERIFY EXISTING CONDITIONS AFFECTING THE ELECTRICAL WORK TO PRIOR TO
DIAGRAMS TO THE OWNERS REPRESENTATIVE. ANY DEVIATIONS TO THIS
NOT ENCASED IN CONCRETE THAT ARE BURIED 18 INCHES OR MORE SHALL HAVE
WARNING TAPE NO LESS THAN 12 INCHES ABOVE THE UNDERGROUND
INSTALLATION. ALIGN TAPE PARALLEL TO CONDUIT RUN.
COMMENCEMENT OF PROJECT.
SPECIFICATION MUST BE CLEARLY STATED BY LETTER AND SUBMITTED.
2.4 DISTRIBUTION EQUIPMENT AND PANELBOARDS
1.3 ELECTRICAL DRAWINGS AND SYMBOLS
A. ELECTRICAL DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO SHOW
B. PROVIDE STANDARD CATALOG LITERATURE FOR ALL NEW ELECTRICAL EQUIPMENT
AND DEVICES INCLUDING OUTLETS, DISCONNECTS, STARTERS ETC.
A. SERVICE: BUILDING SERVICE SHALL BE 208/120V, THREE PHASE, 4 WIRE. METER
BASE AND SERVICE DISCONNECT SHALL BE LOCATED AS SHOWN ON PLANS.
COORDINATE WITH THE UTILITY FOR INSTALLATION REQUIREMENTS.
ALL FEATURES OF WORK. HOWEVER, THE CONTRACTOR SHALL PROVIDE
PRODUCTS NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM IN
ACCORDANCE WITH NEC, AND ALL LOCAL AMENDMENTS.
B. INSTALL UN-DIMENSIONED ELECTRICAL ITEMS IN A MANNER TO PROVIDE
SYMMETRICAL APPEARANCE. DO NOT SCALE DRAWINGS FOR EQUIPMENT
LOCATION. REVIEW, STRUCTURAL AND MECHANICAL DRAWINGS FOR LOCATIONS.
C. CATALOG SHEETS MUST CLEARLY STATE COMPLETE PART NUMBERS.
D. WARRANTY: THE CONTRACTOR SHALL GUARANTEE ALL WORK INSTALLED UNDER
THIS SPECIFICATION AND MAKE GOOD, REPAIR OR REPLACE AT HIS OWN EXPENSE,
ANY DEFECTIVE WORK, MATERIALS OR PARTS WITHIN ONE YEAR AFTER FINAL
ACCEPTANCE, IF, IN THE OPINION OF THE ARCHITECT, SAID DEFECT IS DUE TO
IMPERFECTION IN MATERIAL, DESIGN OR WORKMANSHIP
B. DISTRIBUTION PANELS: SHALL BE 208/120V, SIZE AND CURRENT RATINGS SHOWN
ON THE DRAWINGS.
C. INSTALL PANEL BOARDS PLUMB AND LEVEL. HEIGHT: 6 FEET TO TOP OF PANEL
BOARD; INSTALL PANEL BOARDS TALLER THAN 6 FEET WITH BOTTOM NO MORE
THAN 4 INCHES ABOVE FLOOR.
ADJUST WORK TO CONFORM TO ACTUAL CONDITIONS SHOWN.
1.8 QUALITY ASSURANCE
D. INSTALL FILLER PLATES FOR UNUSED SPACES IN PANEL BOARDS.
C. DRAWING SYMBOLS USED FOR BASIC MATERIALS, EQUIPMENT, ETC., ARE
DENOTED BY INDUSTRY STANDARD SYMBOLS. SPECIAL ITEMS ARE DENOTED BY
SYMBOL LEGEND OR CALLED OUT ON THE DRAWINGS OR SPECIFICATION.
A. WORKMANSHIP IS CONSIDERED IMPORTANT AND IS SUBJECT TO APPROVAL.
EMPLOY WORKMEN SKILLED IN THE TRADE AND FAMILIAR WITH PARTICULAR
TECHNIQUES APPLICABLE TO VARIOUS SECTIONS OF WORK.
E. PROVIDE TYPED CIRCUIT DIRECTORY FOR EACH BRANCH CIRCUIT PANEL BOARD.
REVISE DIRECTORY TO REFLECT CIRCUITING CHANGES TO MATCH AS-BUILT
CONDITIONS.
1.4 COORDINATION
B. PROVIDE ALL MATERIALS TO CONFORM WITH APPLICABLE INDUSTRY STANDARDS
F. INSTALL ENGRAVED PLASTIC NAMEPLATES.
A. COORDINATE WITH MEA ON CONNECTION TO SERVICE LATERAL.
AND UNDERWRITERS LABORATORIES STANDARDS. WHENEVER POSSIBLE, SIMILAR 2.5 SERVICE EQUIPMENT
B. EXPOSED RACEWAYS SHALL BE ROUTED ORTHOGONAL TO THE STRUCTURE.
ITEMS SHALL BE SUPPLIED BY THE SAME MANUFACTURER THROUGHOUT THE
PROJECT.
A. SERVICE EQUIPMENT SHALL BE AS SHOWN ON THE DRAWINGS AND IN THE 2024
C. OBTAIN WRITTEN PERMISSION FROM OWNER'S REPRESENTATIVE PRIOR TO
EDITION OF THE MEA SERVICE GUIDE, FIGURE 9 - THREE PHASE CT SERVICE 200
CUTTING, DRILLING OR WEAKENING STRUCTURAL COMPONENTS.
1.9 EQUIPMENT SCHEDULES
AMP TO 600 AMP 208/120 VOLT. ALL SERVICE EQUIPMENT MUST BE MOUNTED ON
C
D. COORDINATE WITH OWNER'S REPRESENTATIVE TO FORM A WORK PLAN AND
SCHEDULE. SOME AREAS OF THE BUILDING MAY BE OFF LIMITS TO THE
A. FIXTURE AND EQUIPMENT SCHEDULES ON THE DRAWINGS DENOTING
CAPABILITIES, RATINGS, SIZES, ETC., SHOWN ARE THE MINIMUM ACCEPTABLE AND
THE EQUIPMENT RACK AS SHOWN ON THE DRAWINGS AND IN COMPLIANCE WITH
THE MEA SERVICE GUIDE.
CONTRACTOR DURING SPECIFIC HOURS.
MAY NOT NECESSARILY CORRESPOND WITH CATALOG RATINGS OR EQUIPMENT
B. ALL SERVICE EQUIPMENT AND WIRING MUST CONFORM TO THE LATEST EDITION OF
SPECIFIED.
THE NATIONAL ELECTRIC CODE, TO STATE OR LOCAL CODES, AND MATANUSKA
E. AT EACH PANEL-BOARD AND ELECTRICAL DEVICE THAT REQUIRES WORKING
CLEARANCE BY THE NEC THE CONTRACTOR SHALL ARRANGE EQUIPMENT TO
PROVIDE ADEQUATE CLEARANCE INCLUDING REARRANGEMENT OF SUCH
EQUIPMENT TO OPTIMIZE ACTUAL FIELD CONDITIONS. THE CONTRACTOR SHALL
MONITOR THE WORK OF ALL TRADES TO ASSURE THAT THE SPACE AND
CLEARANCE REQUIREMENTS OF THE CODE ARE MET.
F. THE HORSEPOWER AND WATTAGE OF EQUIPMENT DENOTED ON THE DRAWINGS
ARE ESTIMATED REQUIREMENTS OF EQUIPMENT FURNISHED UNDER OTHER
DIVISIONS OF THE CONTRACT. COORDINATE OVERLOAD ELEMENTS TO MATCH
ACTUAL EQUIPMENT NAMEPLATES.
PART 2
PRODUCTS
2.1 GENERAL
A. MATERIALS AND EQUIPMENT SHALL BE ACCEPTABLE TO THE AUTHORITY HAVING
JURISDICTION AS SUITABLE FOR THE USE INTENDED. ALL ELECTRICAL EQUIPMENT
SHALL BEAR THE SEAL OF A NATIONALLY RECOGNIZED TESTING LABORATORY FOR
THE PURPOSE FOR WHICH IT IS INSTALLED.
2.2 LABELING
ELECTRIC ASSOCIATION (MEA) REQUIREMENTS.
C. ALL SERVICE EQUIPMENT COMPONENTS MUST BE UL LISTED, WEATHERPROOF,
AND MANUFACTURED FOR THE APPLICATION USED. ENCLOSURES MUST BE RATED
FOR NEMA 3R WEATHERPROOFING, AT A MINIMUM. INSTALLATION WILL NOT ALLOW
ACCESS TO UTILITIES' (MEA'S) SERVICE CONDUCTORS WITHOUT REMOVING THE
METER, OR OTHER UTILITY SEALS.
D. EACH ELECTRIC SERVICE SHALL COMPLY WITH ALL APPLICABLE GROUNDING
REQUIREMENTS OF THE LATEST VERSION OF THE NEC AND WITH ANY LOCAL
AMENDMENTS TO THE NEC.
1.5 PAINTING AND REPAIR
A. ALL BUILDINGS MATERIALS, EQUIPMENT AND EXISTING FURNITURE DAMAGED
A. PROVIDE TYPED CIRCUIT DIRECTORY FOR EACH BRANCH CIRCUIT PANEL BOARD.
REVISE DIRECTORY TO REFLECT CIRCUITING CHANGES TO MATCH AS-BUILT
CONDITIONS.
E. TWO GROUND RODS ARE REQUIRED, SPACED NOT LESS THAT SIX FEET APART.
GROUND RODS MUST BE 5/8” X 8' COPPER CLAD STEEL OR GALVANIZED STEEL
DRIVEN VERTICALLY INTO UNDISTURBED EARTH. CLAMPS MUST BE A
DURING THE INSTALLATION OF THE WORK MUST BE REPAIRED OR REPLACED WITH
MATERIALS IN LIKE KIND AND QUALITY OF THE ORIGINAL BY SKILLED LABOR
EXPERIENCED IN THAT PARTICULAR BUILDING TRADE.
B. PROVIDE CIRCUIT LABELS AT ALL JUNCTION BOX AND OUTLET LOCATIONS.
PROVIDE THERMAL LABELS INDICATING CIRCUIT NUMBER ON ALL RECEPTACLE
FACE PLATES.
MANUFACTURED TYPE APPROVED FOR THE PURPOSE. GROUND ROD
CONNECTIONS MUST REMAIN VISIBLE UNTIL INSPECTIONS ARE COMPLETE. THE
TOP OF THE GROUND RODS MUST BE A MINIMUM OF SIX INCHES BELOW FINAL
B. ITEMS SCRATCHED OR MARRED IN SHIPMENT OR INSTALLATION SHALL BE
REFINISHED WITH TOUCHUP PAINT SELECTED TO MATCH INSTALLED EQUIPMENT
FINISH.
C. PROVIDE PHENOLIC LABELS FOR NEW SERVICE EQUIPMENT.
2.3 WIRING AND CONDUIT
GRADE AFTER COVERING.
F. GROUND WIRE MUST BE BARE COPPER, UNSPLICED IN ITS ENTIRE LENGTH,
FASTENED TO THE STRUCTURE, RUNNING CONTINUOUSLY FROM THE NEUTRAL
1.6 CODES AND STANDARDS
B
A. CODES: PERFORM ALL WORK IN ACCORDANCE WITH ALL LATEST LEGALLY
ENACTED EDITIONS OF NATIONAL, STATE AND LOCAL CODES INCLUDING:
A. EXTERIOR ABOVE GRADE CONDUIT, OR INTERIOR CONDUIT SUBJECT TO PHYSICAL
DAMAGE SHALL BE GALVANIZED RIGID STEEL (GRS).
B. UNDERGROUND CONDUIT SHALL BE SCHEDULE 40 POLY VINYL CHLORIDE (PVC).
BUS INSIDE THE SERVICE DISCONNECT TO THE GROUND RODS. THE GROUND WIRE
AND CONNECTIONS MUST BE VISIBLE FOR MEA INSPECTION. THE GROUNDING
SYSTEM SHALL TIE TOGETHER THE SERVICE ENTRANCE, GROUND RODS, WATER
SYSTEM, AND BUILDING WIRING. GROUND ROD GROUNDING CONDUCTOR SIZE
1. NFPA 70 - NATIONAL ELECTRICAL CODE (NEC)
2. NFPA 72 AND 101 - NATIONAL FIRE ALARM CODE AND LIFE SAFETY CODE.
3. ANSI/IEEE C2 - NATIONAL ELECTRICAL SAFETY CODE (NESC)
C. INTERIOR CONDUITS NOT EXPOSED TO PHYSICAL DAMAGE MAY BE ELECTRICAL
METALLIC TUBING (EMT).
D. CONDUCTORS SHALL BE #12 AWG COPPER MINIMUM OR AS SHOWN ON DRAWINGS.
HOME RUN CONDUCTORS SHALL BE #10 AWG COPPER MINIMUM OR AS REQUIRED
SHALL BE A MINIMUM OF #6 AWG SOLD COPPER UNLESS REQUIRED TO BE LARGER
BY THE NEC. ONLY ONE CONDUCTOR MAY BE INSTALLED IN EACH CONDUCTOR
LUG POSITION.
G. MAIN DISCONNECT SWITCHES ASSOCIATED WITH SERVICE ENTRANCE EQUIPMENT
4. INTERNATIONAL BUILDING CODE (IBC)
5. INTERNATIONAL FIRE CODE (IFC)
6. STATE OF ALASKA AMENDMENTS TO NEC, IBC, AND IFC.
BY THE NEC. FOR 15A AND 20A CIRCUITS, TRANSITION TO #12 AWG WITHIN 15' OF
DEVICE IF A SMALL CONDUCTOR IS REQUIRED FOR DEVICE TERMINATION.
E. THE CONTRACTOR SHALL PROVIDE AND INSTALL AN EQUIPMENT GROUNDING
CONDUCTOR IN ALL CONDUITS OR CABLING.
MUST PROVIDE A VISUAL OPEN, LOCK OUT CAPABILITY, LOCKABLE IN BOTH THE
OPEN AND CLOSED POSITIONS.
H. COORDINATE THE INSTALLATION OF THE SERVICE EQUIPMENT WITH MATANUSKA
ELECTRIC ASSOCIATION.
7. ALASKA ADMINISTRATIVE CODE 8.70 ELECTRICAL SAFETY CODE.
F. ALL CONDUCTOR SIZES SHOWN ARE BASED ON COPPER UNLESS NOTED
2.6 DIESEL - ENGINE DRIVE GENERATOR SET
B. STANDARDS: PROVIDE ALL EQUIPMENT, MATERIALS AND INSTALLATION IN
CONFORMANCE WITH THE FOLLOWING LATEST CURRENT PUBLICATIONS AND
STANDARDS AS APPLICABLE.
1. UNDERWRITER'S LABORATORY (UL)
OTHERWISE.
G. MAINTAIN A MINIMUM 6" CLEARANCE BETWEEN CONDUIT AND PIPING. MAINTAIN A
MINIMUM 12" CLEARANCE BETWEEN CONDUIT AND HEAT SOURCES SUCH AS
FLUES, HEATING PIPES, AND HEATING APPLIANCES. MAINTAIN A MINIMUM OF 12"
PART 1
A.
GENERAL
SUMMARY
1. SECTION INCLUDES:
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
3. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
4. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
CLEARANCE BETWEEN POWER AND COMMUNICATION CONDUITS.
H. PROVIDE ALL CONDUCTORS SIZED PER NEC REQUIREMENTS INCLUDING
ADJUSTMENT FACTORS FOR AMBIENT TEMPERATURE AND MORE THAT THREE
CURRENT CARRYING CONDUCTORS PER RACEWAY.
a. DIESEL-ENGINE-DRIVEN GENERATOR SETS.
b. DIESEL ENGINE.
c. CONTROL AND MONITORING.
5. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA)
6. NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA)
A
7. INTERNATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
8. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
I. PROVIDE ALL BRANCH CIRCUITS SIZED TO PROVIDE LESS THAN 3%VOLTAGE DROP
FORM THE PANEL BOARD TO THE LAST DEVICE ON THE CIRCUIT. USE THE LOAD
PROVIDED IN THE PANEL SCHEDULE FOR CALCULATIONS.
J. PERFORM WIRING CONNECTIONS AND SPLICES ONLY IN ACCESSIBLE OUTLET OR
JUNCTION BOXES.
d. GENERATOR OVERCURRENT AND FAULT PROTECTION.
e. GENERATOR, EXCITER, AND VOLTAGE REGULATOR.
f. VIBRATION ISOLATION DEVICES.
B. DEFINITIONS
9. NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
K. CLEAN CONDUCTOR SURFACES BEFORE INSTALLING LUGS AND CONNECTORS.
1. EPS: EMERGENCY POWER SUPPLY.
C. CERTIFICATE OF INSPECTION: OBTAIN A CERTIFICATE OF ELECTRICAL INSPECTION
FROM THE LOCAL INSPECTING AUTHORITY INDICATING FINAL ACCEPTANCE.
SUBMIT TO THE OWNER UPON COMPLETION OF THE PROJECT AS PART OF
PROJECT CLOSEOUT.
D. SAFETY MEASURES TO BE TAKEN: THE ENGINEER HAS NOT BEEN RETAINED OR
COMPENSATED TO PROVIDE DESIGN AND CONSTRUCTION REVIEW SERVICES
RELATING TO THE CONTRACTOR'S SAFETY PRECAUTIONS OR TO MEANS,
L. STRIP CONDUCTOR INSULATION TO THE EXPOSED LENGTH AS RECOMMENDED BY
THE MANUFACTURER FOR THE CONNECTOR USED.
M. TAPE UNINSULATED CONDUCTORS AND CONNECTORS WITH ELECTRICAL TAPE TO
150 PERCENT OF INSULATION RATING OF CONDUCTOR.
N. INSTALL COMPRESSION CONNECTORS FOR COPPER CONDUCTOR SPLICES AND
TAPS, 6 AWG AND LARGER.
2. EPSS: EMERGENCY POWER SUPPLY SYSTEM.
3. OPERATIONAL BANDWIDTH: THE TOTAL VARIATION FROM THE LOWEST TO
HIGHEST VALUE OF A PARAMETER OVER THE RANGE OF CONDITIONS
INDICATED, EXPRESSED AS A PERCENTAGE OF THE NOMINAL VALUE OF THE
PARAMETER.
1
2
3
4
5
301 W. Northern Lights Blvd.
Suite 200
Anchorage, AK 99503
ph 907.276.6664
PERMIT STAMP
www.coffman.com AECC249
C. ACTION SUBMITTALS
1. PRODUCT DATA: FOR EACH TYPE OF PRODUCT.
a. INCLUDE RATED CAPACITIES, OPERATING CHARACTERISTICS, ELECTRICAL
CHARACTERISTICS, AND FURNISHED SPECIALTIES AND ACCESSORIES.
b. INCLUDE THERMAL DAMAGE CURVE FOR GENERATOR.
c. INCLUDE TIME-CURRENT CHARACTERISTIC CURVES FOR GENERATOR
PROTECTIVE DEVICE.
d. INCLUDE FUEL CONSUMPTION IN GALLONS PER HOUR AT 0.8 POWER FACTOR
AT 0.5, 0.75, AND 1.0 TIMES GENERATOR CAPACITY.
e. INCLUDE GENERATOR EFFICIENCY AT 0.8 POWER FACTOR AT 0.5, 0.75, AND 1.0
TIMES GENERATOR CAPACITY.
f. INCLUDE AIRFLOW REQUIREMENTS FOR COOLING AND COMBUSTION AIR IN
CUBIC FEET PER MINUTE AT 0.8 POWER FACTOR, WITH AIR-SUPPLY
TEMPERATURE OF 95, 80, 70, AND 50 DEG F. PROVIDE DRAWINGS INDICATING
REQUIREMENTS AND LIMITATIONS FOR LOCATION OF AIR INTAKE AND
EXHAUSTS.
g. INCLUDE GENERATOR CHARACTERISTICS, INCLUDING, BUT NOT LIMITED TO,
KILOWATT RATING, EFFICIENCY, REACTANCES, AND SHORT-CIRCUIT
CURRENT CAPABILITY.
2. SHOP DRAWINGS:
a. INCLUDE PLANS AND ELEVATIONS FOR ENGINE GENERATOR AND OTHER
COMPONENTS SPECIFIED.
b. INCLUDE DETAILS OF EQUIPMENT ASSEMBLIES. INDICATE DIMENSIONS,
WEIGHTS, LOADS, REQUIRED CLEARANCES, METHOD OF FIELD ASSEMBLY,
COMPONENTS, AND LOCATION AND SIZE OF EACH FIELD CONNECTION.
c. IDENTIFY FLUID DRAIN PORTS AND CLEARANCE REQUIREMENTS FOR PROPER
FLUID DRAIN.
d. DESIGN CALCULATIONS FOR SELECTING VIBRATION ISOLATORS AND SEISMIC
RESTRAINTS AND FOR DESIGNING VIBRATION ISOLATION BASES.
e. VIBRATION ISOLATION BASE DETAILS: DETAIL FABRICATION INCLUDING
ANCHORAGES AND ATTACHMENTS TO STRUCTURE AND TO SUPPORTED
EQUIPMENT. INCLUDE BASE WEIGHTS.
f. INCLUDE DIAGRAMS FOR POWER, SIGNAL, AND CONTROL WIRING. COMPLETE
SCHEMATIC, WIRING, AND INTERCONNECTION DIAGRAMS SHOWING TERMINAL
MARKINGS FOR ENGINE GENERATORS AND FUNCTIONAL RELATIONSHIP
BETWEEN ALL ELECTRICAL COMPONENTS.
D. CLOSEOUT SUBMITTALS
1. OPERATION AND MAINTENANCE DATA: FOR PACKAGED ENGINE GENERATORS
TO INCLUDE IN EMERGENCY, OPERATION, AND MAINTENANCE MANUALS.
a. INCLUDE THE FOLLOWING:
a.a. LIST OF TOOLS AND REPLACEMENT ITEMS RECOMMENDED TO BE
STORED AT PROJECT FOR READY ACCESS. INCLUDE PART AND
DRAWING NUMBERS, CURRENT UNIT PRICES, AND SOURCE OF SUPPLY.
a.b. OPERATING INSTRUCTIONS LAMINATED AND MOUNTED ADJACENT TO
GENERATOR LOCATION.
a.c. TRAINING PLAN.
E. WARRANTY
1. MANUFACTURER'S WARRANTY: MANUFACTURER AGREES TO REPAIR OR
REPLACE COMPONENTS OF PACKAGED ENGINE GENERATORS AND
ASSOCIATED AUXILIARY COMPONENTS THAT FAIL IN MATERIALS OR
WORKMANSHIP WITHIN SPECIFIED WARRANTY PERIOD.
b. WARRANTY PERIOD: 2 YEARS FROM DATE OF SUBSTANTIAL COMPLETION.
D
TOM E. LOONEY
Jan 30, 2025
TERED
No. EE9369
PROFESSIO
NA
L
ENGI
CHUGIAK SENIOR
CENTER GENERATOR
C REPLACEMENT
MUNICIPALITY OF
ANCHORAGE
100% ISSUED FOR
CONSTRUCTION
B
REV DATE
PROJ. NO.
DRAWN
CHECKED
DATE
DESCRIPTION
241484
ALM
TEL
01/30/2025
C COFFMAN ENGINEERS INC.
SHEET TITLE:
ELECTRICAL
SPECIFICATIONS
A
SHEET NO:
E-002
5
1
2
3
4
5
2.6 DIESEL - ENGINE DRIVE GENERATOR SET
h. START TIME:
a. OPERATING AND SAFETY INDICATIONS, PROTECTIVE DEVICES, BASIC SYSTEM
PART 2
PRODUCTS
a.a. COMPLY WITH NFPA 110, LEVEL 2, TYPE 10 SYSTEM REQUIREMENTS.
A. DIESEL-ENGINE-DRIVEN GENERATOR SETS
D. DIESEL ENGINE
1. DESIGN BASED ON CUMMINS NORTHWEST DIESEL-ENGINE GENERATOR MODEL NUMBER
C60D6.
2. SOURCE LIMITATIONS: OBTAIN PACKAGED ENGINE GENERATORS AND AUXILIARY
COMPONENTS FROM SINGLE SOURCE FROM SINGLE MANUFACTURER.
B. PERFORMANCE REQUIREMENTS
1. NFPA COMPLIANCE:
D
a. COMPLY WITH NFPA 37.
b. COMPLY WITH NFPA 70.
c. COMPLY WITH NFPA 110 REQUIREMENTS FOR LEVEL 2 EPSS.
1. FUEL: ASTM D975, DIESEL FUEL OIL, GRADE 2-D S15.
2. RATED ENGINE SPEED: 1800 RPM.
3. LUBRICATION SYSTEM: ENGINE OR SKID-MOUNTED.
a. FILTER AND STRAINER: RATED TO REMOVE 90 PERCENT OF PARTICLES 5
MICROMETERS AND SMALLER WHILE PASSING FULL FLOW.
b. THERMOSTATIC CONTROL VALVE: CONTROL FLOW IN SYSTEM TO MAINTAIN
OPTIMUM OIL TEMPERATURE. UNIT SHALL BE CAPABLE OF FULL FLOW AND IS
DESIGNED TO BE FAIL-SAFE.
c. CRANKCASE DRAIN: ARRANGED FOR COMPLETE GRAVITY DRAINAGE TO AN EASILY
REMOVABLE CONTAINER WITH NO DISASSEMBLY AND WITHOUT USE OF PUMPS,
CONTROLS, AND ENGINE GAGES SHALL BE GROUPED IN A COMMON CONTROL AND
MONITORING PANEL MOUNTED ON THE ENGINE GENERATOR. MOUNTING METHOD
SHALL ISOLATE THE CONTROL PANEL FROM ENGINE GENERATOR VIBRATION.
PANEL SHALL BE POWERED FROM THE ENGINE GENERATOR BATTERY.
6. CONTROL AND MONITORING PANEL:
a. DIGITAL ENGINE GENERATOR CONTROLLER WITH INTEGRATED LCD DISPLAY,
CONTROLS, AND MICROPROCESSOR, CAPABLE OF LOCAL AND REMOTE CONTROL,
MONITORING, AND PROGRAMMING, WITH BATTERY BACKUP.
b. INSTRUMENTS: LOCATED ON THE CONTROL AND MONITORING PANEL AND
VIEWABLE DURING OPERATION.
a.a. ENGINE LUBRICATING-OIL PRESSURE GAGE.
a.b. ENGINE-COOLANT TEMPERATURE GAGE.
a.c. DC VOLTMETER (ALTERNATOR BATTERY CHARGING).
PERMIT STAMP
a. INITIATES A GENERATOR OVERLOAD ALARM WHEN GENERATOR HAS OPERATED AT
AN OVERLOAD EQUIVALENT TO 110 PERCENT OF FULL-RATED LOAD FOR 60
SECONDS. INDICATION FOR THIS ALARM IS INTEGRATED WITH OTHER ENGINE
D
GENERATOR MALFUNCTION ALARMS. CONTACTS SHALL BE AVAILABLE FOR LOAD
SHED FUNCTIONS.
b. UNDER SINGLE- OR THREE-PHASE FAULT CONDITIONS, REGULATES GENERATOR
301 W. Northern Lights Blvd.
Suite 200
Anchorage, AK 99503
ph 907.276.6664
www.coffman.com AECC249
2. UL COMPLIANCE: COMPLY WITH UL 2200.
3. ENGINE EXHAUST EMISSIONS: COMPLY WITH EPA TIER 4 REQUIREMENTS AND
APPLICABLE STATE AND LOCAL GOVERNMENT REQUIREMENTS.
4. NOISE EMISSION: COMPLY WITH APPLICABLE STATE AND LOCAL GOVERNMENT
REQUIREMENTS FOR MAXIMUM NOISE LEVEL AT ADJACENT PROPERTY BOUNDARIES DUE
SIPHONS, SPECIAL TOOLS, OR APPLIANCES.
4. INTEGRAL COOLING SYSTEM: CLOSED LOOP, LIQUID COOLED, WITH RADIATOR FACTORY
MOUNTED ON ENGINE GENERATOR SET MOUNTING FRAME AND INTEGRAL
ENGINE-DRIVEN COOLANT PUMP.
a. COOLANT: SOLUTION OF 50 PERCENT ETHYLENE-GLYCOL-BASED ANTIFREEZE AND
a.d. RUNNING-TIME METER.
b. CONTROLS AND PROTECTIVE DEVICES: CONTROLS, SHUTDOWN DEVICES, AND
COMMON ALARM INDICATION, INCLUDING THE FOLLOWING:
b.a. CRANKING CONTROL EQUIPMENT.
TO 300 PERCENT OF RATED FULL-LOAD CURRENT FOR UP TO 10 SECONDS.
c. AS OVERCURRENT HEATING EFFECT ON THE GENERATOR APPROACHES THE
THERMAL DAMAGE POINT OF THE UNIT, PROTECTOR SWITCHES THE EXCITATION
SYSTEM OFF, OPENS THE GENERATOR DISCONNECT DEVICE, AND SHUTS DOWN
THE ENGINE GENERATOR.
TOM E. LOONEY
Jan 30, 2025
TERED
No. EE9369
PROFESSIONA
L
ENG
TO SOUND EMITTED BY ENGINE GENERATOR INCLUDING ENGINE, ENGINE EXHAUST,
50 PERCENT WATER, WITH ANTICORROSION ADDITIVES AS RECOMMENDED BY
b.b. RUN-OFF-AUTO SWITCH.
d. SENSES CLEARING OF A FAULT BY OTHER OVERCURRENT DEVICES AND
ENGINE COOLING-AIR INTAKE AND DISCHARGE, AND OTHER COMPONENTS OF
INSTALLATION.
5. ENVIRONMENTAL CONDITIONS: ENGINE GENERATOR SYSTEM SHALL WITHSTAND THE
FOLLOWING ENVIRONMENTAL CONDITIONS WITHOUT MECHANICAL OR ELECTRICAL
DAMAGE OR DEGRADATION OF PERFORMANCE CAPABILITY:
a. AMBIENT TEMPERATURE: 41 TO 104 DEG F.
b. RELATIVE HUMIDITY: ZERO TO 95 PERCENT.
c. ALTITUDE: SEA LEVEL TO 500.
C. ENGINE GENERATOR ASSEMBLY DESCRIPTION
1. FACTORY-ASSEMBLED AND -TESTED, WATER-COOLED ENGINE, WITH BRUSHLESS
C
GENERATOR AND ACCESSORIES.
2. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED AS
ENGINE MANUFACTURER.
b. SIZE OF RADIATOR: ADEQUATE TO CONTAIN EXPANSION OF TOTAL SYSTEM
COOLANT FROM COLD START TO 110 PERCENT LOAD CONDITION.
c. TEMPERATURE CONTROL: SELF-CONTAINED, THERMOSTATIC-CONTROL VALVE
MODULATES COOLANT FLOW AUTOMATICALLY TO MAINTAIN OPTIMUM CONSTANT
COOLANT TEMPERATURE AS RECOMMENDED BY ENGINE MANUFACTURER.
d. COOLANT HOSE: FLEXIBLE ASSEMBLY WITH INSIDE SURFACE OF NONPOROUS
RUBBER AND OUTER COVERING OF AGING-, UV-, AND ABRASION-RESISTANT
FABRIC.
a. RATING: 50-PSIG MAXIMUM WORKING PRESSURE WITH COOLANT AT 180 DEG F,
AND NONCOLLAPSIBLE UNDER VACUUM.
b. END FITTINGS: FLANGES OR STEEL PIPE NIPPLES WITH CLAMPS TO SUIT PIPING
AND EQUIPMENT CONNECTIONS.
b.c. CONTROL SWITCH NOT IN AUTOMATIC POSITION ALARM.
b.d. OVERCRANK ALARM.
b.e. OVERCRANK SHUTDOWN DEVICE.
b.f. LOW-WATER TEMPERATURE ALARM.
b.g. HIGH ENGINE TEMPERATURE PREALARM.
b.h. HIGH ENGINE TEMPERATURE.
b.i. HIGH ENGINE TEMPERATURE SHUTDOWN DEVICE.
b.j. OVERSPEED ALARM.
b.k. OVERSPEED SHUTDOWN DEVICE.
b.l. COOLANT LOW-LEVEL ALARM.
CONTROLS RECOVERY OF RATED VOLTAGE TO AVOID OVERSHOOT.
H. GENERATOR, EXCITER, AND VOLTAGE REGULATOR
1. COMPLY WITH NEMA MG 1.
2. DRIVE: GENERATOR SHAFT SHALL BE DIRECTLY CONNECTED TO ENGINE SHAFT.
EXCITER SHALL BE ROTATED INTEGRALLY WITH GENERATOR ROTOR.
3. ELECTRICAL INSULATION: CLASS H.
4. STATOR-WINDING LEADS: BROUGHT OUT TO TERMINAL BOX TO PERMIT FUTURE
RECONNECTION FOR OTHER VOLTAGES IF REQUIRED. OUTPUT VOLTAGE ADJUSTMENT
IN "RANGE" PARAGRAPH BELOW INCREASES IN EACH OF THE THREE RANGES.
5. RANGE: PROVIDE RANGE OF OUTPUT VOLTAGE BY ADJUSTING THE EXCITATION LEVEL.
6. CONSTRUCTION SHALL PREVENT MECHANICAL, ELECTRICAL, AND THERMAL DAMAGE
DUE TO VIBRATION, OVERSPEED UP TO 125 PERCENT OF RATING, AND HEAT DURING
CHUGIAK SENIOR
CENTER GENERATOR
C REPLACEMENT
DEFINED IN NFPA 70, BY A QUALIFIED TESTING AGENCY, AND MARKED FOR INTENDED
LOCATION AND USE.
3. POWER RATING: STANDBY.
5. MUFFLER/SILENCER:
a. COMMERCIAL TYPE, SIZED AS RECOMMENDED BY ENGINE MANUFACTURER AND
SELECTED WITH EXHAUST PIPING SYSTEM TO NOT EXCEED ENGINE
b.m. COOLANT LOW-LEVEL SHUTDOWN DEVICE.
b.n. COOLANT HIGH-TEMPERATURE PREALARM.
b.o. COOLANT HIGH-TEMPERATURE ALARM.
OPERATION AT 110 PERCENT OF RATED CAPACITY.
7. ENCLOSURE: DRIP PROOF.
8. INSTRUMENT TRANSFORMERS: MOUNTED WITHIN GENERATOR ENCLOSURE.
4. EPSS CLASS: ENGINE GENERATOR SHALL BE CLASSIFIED AS A CLASS 6 ACCORDING TO
NFPA 110.
5. SERVICE LOAD: 60 KW/75 KVA.
6. POWER FACTOR: 0.8, LAGGING.
MANUFACTURER'S ENGINE BACKPRESSURE REQUIREMENTS.
a. MINIMUM SOUND ATTENUATION OF 12 DB AT 500 HZ.
b. SOUND LEVEL MEASURED AT A DISTANCE OF 25 FEET FROM EXHAUST DISCHARGE
AFTER INSTALLATION IS COMPLETE SHALL BE 90 DBA OR LESS.
b.p. COOLANT LOW-TEMPERATURE ALARM.
b.q. COOLANT HIGH-TEMPERATURE SHUTDOWN DEVICE.
b.r. EPS LOAD INDICATOR.
9. VOLTAGE REGULATOR: SOLID-STATE TYPE, SEPARATE FROM EXCITER, PROVIDING
PERFORMANCE AS SPECIFIED.
a. ADJUSTING RHEOSTAT ON CONTROL AND MONITORING PANEL: PROVIDE PLUS OR
MINUS 5 PERCENT ADJUSTMENT OF OUTPUT-VOLTAGE OPERATING BAND.
MUNICIPALITY OF
ANCHORAGE
7. FREQUENCY: 60 HZ.
6. STARTING SYSTEM: 12-V ELECTRIC, WITH NEGATIVE GROUND.
b.s. BATTERY HIGH-VOLTAGE ALARM.
b. MAINTAIN VOLTAGE WITHIN 30 PERCENT ON ONE STEP, FULL LOAD.
8. VOLTAGE: 208-V AC.
a. COMPONENTS: SIZED SO THEY ARE NOT DAMAGED DURING A FULL
b.t. LOW CRANKING VOLTAGE ALARM.
c. PROVIDE ANTI-HUNT PROVISION TO STABILIZE VOLTAGE.
9. PHASE: THREE-PHASE, FOUR WIRE, WYE.
ENGINE-CRANKING CYCLE WITH AMBIENT TEMPERATURE AT MAXIMUM SPECIFIED
b.u. BATTERY-CHARGER MALFUNCTION ALARM.
d. MAINTAIN FREQUENCY WITHIN 5 PERCENT AND STABILIZE AT RATED FREQUENCY
10. INDUCTION METHOD: TURBOCHARGED.
IN "PERFORMANCE REQUIREMENTS" ARTICLE.
b.v. BATTERY LOW-VOLTAGE ALARM.
WITHIN 2 SECONDS.
100% ISSUED FOR
11. GOVERNOR: ADJUSTABLE ISOCHRONOUS, WITH SPEED SENSING.
12. MOUNTING FRAME: STRUCTURAL STEEL FRAMEWORK TO MAINTAIN ALIGNMENT OF
MOUNTED COMPONENTS WITHOUT DEPENDING ON CONCRETE FOUNDATION. PROVIDE
b. CRANKING MOTOR: HEAVY-DUTY UNIT THAT AUTOMATICALLY ENGAGES AND
RELEASES FROM ENGINE FLYWHEEL WITHOUT BINDING.
c. CRANKING CYCLE: AS REQUIRED BY NFPA 110 FOR SYSTEM LEVEL SPECIFIED.
b.w. LAMP TEST.
b.x. CONTACTS FOR LOCAL AND REMOTE COMMON ALARM.
b.y. LOW-STARTING HYDRAULIC PRESSURE ALARM.
10.WINDINGS: TWO-THIRDS PITCH STATOR WINDING AND FULLY LINKED AMORTISSEUR
WINDING.
11.SUBTRANSIENT REACTANCE: 12 PERCENT, MAXIMUM.
CONSTRUCTION
LIFTING ATTACHMENTS SIZED AND SPACED TO PREVENT DEFLECTION OF BASE DURING
LIFTING AND MOVING.
d. BATTERY CABLE: SIZE AS RECOMMENDED BY ENGINE MANUFACTURER FOR CABLE
LENGTH INDICATED. INCLUDE REQUIRED INTERCONNECTING CONDUCTORS AND
CONNECTION ACCESSORIES.
b.z. REMOTE MANUAL STOP SHUTDOWN DEVICE.
7. COMMON REMOTE PANEL WITH COMMON AUDIBLE ALARM: INCLUDE NECESSARY
I. VIBRATION ISOLATION DEVICES
1. ELASTOMERIC ISOLATOR PADS: OIL- AND WATER-RESISTANT ELASTOMER OR NATURAL
13. CAPACITIES AND CHARACTERISTICS:
B
a. POWER OUTPUT RATINGS: NOMINAL RATINGS AS INDICATED AT 0.8 POWER
FACTOR EXCLUDING POWER REQUIRED FOR THE CONTINUED AND REPEATED
OPERATION OF THE UNIT AND AUXILIARIES.
e. BATTERY-CHARGING ALTERNATOR: FACTORY MOUNTED ON ENGINE WITH
SOLID-STATE VOLTAGE REGULATION AND 35-A MINIMUM CONTINUOUS RATING.
E. DIESEL FUEL-OIL SYSTEM
CONTACTS AND TERMINALS IN CONTROL AND MONITORING PANEL. REMOTE PANEL
SHALL BE POWERED FROM THE ENGINE GENERATOR BATTERY.
8. SUPPORTING ITEMS: INCLUDE SENSORS, TRANSDUCERS, TERMINALS, RELAYS, AND
OTHER DEVICES AND INCLUDE WIRING REQUIRED TO SUPPORT SPECIFIED ITEMS.
RUBBER, ARRANGED IN SINGLE OR MULTIPLE LAYERS, MOLDED WITH A NONSLIP
PATTERN AND GALVANIZED-STEEL BASEPLATES OF SUFFICIENT STIFFNESS FOR
B
UNIFORM LOADING OVER PAD AREA, AND FACTORY CUT TO SIZES THAT MATCH
REQUIREMENTS OF SUPPORTED EQUIPMENT.
b. NAMEPLATES: FOR EACH MAJOR SYSTEM COMPONENT TO IDENTIFY
1. COMPLY WITH NFPA 37.
LOCATE SENSORS AND OTHER SUPPORTING ITEMS ON ENGINE OR GENERATOR UNLESS
a. MATERIAL: STANDARD NEOPRENE SEPARATED BY STEEL SHIMS.
MANUFACTURER'S NAME AND ADDRESS, MODEL, AND SERIAL NUMBER OF
2. PIPING: FUEL-OIL PIPING SHALL BE SCHEDULE 40 BLACK STEEL. CAST IRON, ALUMINUM,
OTHERWISE INDICATED.
3. RESTRAINED SPRING ISOLATORS: FREESTANDING, STEEL, OPEN-SPRING ISOLATORS
COMPONENT.
COPPER, AND GALVANIZED STEEL SHALL NOT BE USED IN THE FUEL-OIL SYSTEM.
G. GENERATOR OVERCURRENT AND FAULT PROTECTION
WITH SEISMIC RESTRAINT.
14. ENGINE GENERATOR PERFORMANCE:
a. STEADY-STATE VOLTAGE OPERATIONAL BANDWIDTH: 3 PERCENT OF RATED
OUTPUT VOLTAGE FROM NO LOAD TO FULL LOAD.
3. MAIN FUEL PUMP: MOUNTED ON ENGINE TO PROVIDE PRIMARY FUEL FLOW UNDER
STARTING AND LOAD CONDITIONS.
4. FUEL FILTERING: REMOVE WATER AND CONTAMINANTS LARGER THAN 1 MICRON.
1. OVERCURRENT PROTECTIVE DEVICES SHALL BE COORDINATED TO OPTIMIZE SELECTIVE
TRIPPING WHEN A SHORT CIRCUIT OCCURS.
a. OVERCURRENT PROTECTIVE DEVICES FOR THE ENTIRE EPSS SHALL BE
a. HOUSING: STEEL WITH RESILIENT VERTICAL-LIMIT STOPS TO PREVENT SPRING
EXTENSION DUE TO WIND LOADS OR IF WEIGHT IS REMOVED; FACTORY-DRILLED
BASEPLATE BONDED TO 1/4-INCH-THICK, ELASTOMERIC ISOLATOR PAD ATTACHED
TO BASEPLATE UNDERSIDE; AND ADJUSTABLE EQUIPMENT-MOUNTING AND
REV DATE
PROJ. NO.
DESCRIPTION
241484
b. TRANSIENT VOLTAGE PERFORMANCE: NOT MORE THAN 20 PERCENT VARIATION
5. RELIEF-BYPASS VALVE: AUTOMATICALLY REGULATES PRESSURE IN FUEL LINE AND
COORDINATED TO OPTIMIZE SELECTIVE TRIPPING WHEN A SHORT CIRCUIT
LEVELING BOLT THAT ACTS AS BLOCKING DURING INSTALLATION.
DRAWN
ALM
FOR 50 PERCENT STEP-LOAD INCREASE OR DECREASE. VOLTAGE SHALL RECOVER
AND REMAIN WITHIN THE STEADY-STATE OPERATING BAND WITHIN THREE
SECONDS.
c. STEADY-STATE FREQUENCY OPERATIONAL BANDWIDTH: 0.5 PERCENT OF RATED
FREQUENCY FROM NO LOAD TO FULL LOAD.
d. STEADY-STATE FREQUENCY STABILITY: WHEN SYSTEM IS OPERATING AT ANY
CONSTANT LOAD WITHIN THE RATED LOAD, THERE SHALL BE NO RANDOM SPEED
VARIATIONS OUTSIDE THE STEADY-STATE OPERATIONAL BAND AND NO HUNTING
RETURNS EXCESS FUEL TO SOURCE.
F. CONTROL AND MONITORING
1. AUTOMATIC STARTING SYSTEM SEQUENCE OF OPERATION: WHEN MODE-SELECTOR
SWITCH ON THE CONTROL AND MONITORING PANEL IS IN THE AUTOMATIC POSITION,
REMOTE-CONTROL CONTACTS IN ONE OR MORE SEPARATE AUTOMATIC TRANSFER
SWITCHES INITIATE STARTING AND STOPPING OF ENGINE GENERATOR. WHEN
MODE-SELECTOR SWITCH IS SWITCHED TO THE ON POSITION, ENGINE GENERATOR
STARTS. THE OFF POSITION OF SAME SWITCH INITIATES ENGINE GENERATOR
OCCURS. COORDINATION OF PROTECTIVE DEVICES SHALL CONSIDER BOTH
UTILITY AND EPSS AS THE VOLTAGE SOURCE.
b. OVERCURRENT PROTECTIVE DEVICES FOR THE EPSS SHALL BE ACCESSIBLE ONLY
TO AUTHORIZED PERSONNEL.
2. GENERATOR OVERCURRENT PROTECTIVE DEVICE:
a. MOLDED-CASE CIRCUIT BREAKER, THERMAL-MAGNETIC TYPE; 100 PERCENT
RATED; COMPLYING WITH UL 489:
b. OUTSIDE SPRING DIAMETER: NOT LESS THAN 80 PERCENT OF COMPRESSED
HEIGHT OF THE SPRING AT RATED LOAD.
c. MINIMUM ADDITIONAL TRAVEL: 50 PERCENT OF REQUIRED DEFLECTION AT RATED
LOAD.
d. LATERAL STIFFNESS: MORE THAN 80 PERCENT OF RATED VERTICAL STIFFNESS.
e. OVERLOAD CAPACITY: SUPPORT 200 PERCENT OF RATED LOAD, FULLY
COMPRESSED, WITHOUT DEFORMATION OR FAILURE.
CHECKED
DATE
TEL
01/30/2025
C COFFMAN ENGINEERS INC.
SHEET TITLE:
ELECTRICAL
OR SURGING OF SPEED.
e. TRANSIENT FREQUENCY PERFORMANCE: LESS THAN 5 PERCENT VARIATION FOR
50 PERCENT STEP-LOAD INCREASE OR DECREASE. FREQUENCY SHALL RECOVER
SHUTDOWN. WHEN ENGINE GENERATOR IS RUNNING, SPECIFIED SYSTEM OR
EQUIPMENT FAILURES OR DERANGEMENTS AUTOMATICALLY SHUT DOWN ENGINE
GENERATOR AND INITIATE ALARMS.
a. TRIPPING CHARACTERISTIC: DESIGNED SPECIFICALLY FOR GENERATOR
PROTECTION.
b. TRIP RATING: MATCHED TO GENERATOR OUTPUT RATING.
f. MINIMUM DEFLECTION: 1 INCH.
4. VIBRATION ISOLATION DEVICES SHALL NOT BE USED TO ACCOMMODATE
MISALIGNMENTS OR TO MAKE BENDS.
SPECIFICATIONS
A
AND REMAIN WITHIN THE STEADY-STATE OPERATING BAND WITHIN FIVE SECONDS. 2. MANUAL STARTING SYSTEM SEQUENCE OF OPERATION: SWITCHING ON-OFF SWITCH ON
c. SHUNT TRIP: CONNECTED TO TRIP BREAKER WHEN ENGINE GENERATOR IS SHUT
A
f. OUTPUT WAVEFORM: AT NO LOAD, HARMONIC CONTENT MEASURED LINE TO LINE
OR LINE TO NEUTRAL SHALL NOT EXCEED 5 PERCENT TOTAL AND 3 PERCENT FOR
SINGLE HARMONICS. TELEPHONE INFLUENCE FACTOR, DETERMINED ACCORDING
TO NEMA MG 1, SHALL NOT EXCEED 50 PERCENT.
THE GENERATOR CONTROL PANEL TO THE ON POSITION STARTS ENGINE GENERATOR.
THE OFF POSITION OF SAME SWITCH INITIATES ENGINE GENERATOR SHUTDOWN. WHEN
ENGINE GENERATOR IS RUNNING, SPECIFIED SYSTEM OR EQUIPMENT FAILURES OR
DERANGEMENTS AUTOMATICALLY SHUT DOWN ENGINE GENERATOR AND INITIATE
DOWN BY OTHER PROTECTIVE DEVICES.
d. MOUNTING: ADJACENT TO, OR INTEGRATED WITH, CONTROL AND MONITORING
PANEL.
J. CONTRACTOR SHALL PROVIDE A DEFERRED SUBMITTAL FOR THE SEISMIC RESTRAINT OF
THE NEW GENERATOR. THE DEFERRED SUBMITTAL SHALL INCLUDE CALCULATIONS AND
DRAWING(S) STAMPED BY AN ALASKA REGISTERED CIVIL/STRUCTURAL ENGINEER.
K. FINISHES
g. SUSTAINED SHORT-CIRCUIT CURRENT: FOR A THREE-PHASE, BOLTED SHORT
CIRCUIT AT SYSTEM OUTPUT TERMINALS, SYSTEM SHALL SUPPLY A MINIMUM OF
250 PERCENT OF RATED FULL-LOAD CURRENT FOR NOT LESS THAN 10 SECONDS
AND THEN CLEAR THE FAULT AUTOMATICALLY, WITHOUT DAMAGE TO GENERATOR
ALARMS.
3. PROVIDE MINIMUM RUN TIME CONTROL SET FOR 15 MINUTES WITH OVERRIDE ONLY BY
OPERATION OF A REMOTE EMERGENCY-STOP SWITCH.
4. COMPLY WITH UL 508A.
3. GENERATOR PROTECTOR: MICROPROCESSOR-BASED UNIT SHALL CONTINUOUSLY
MONITOR CURRENT LEVEL IN EACH PHASE OF GENERATOR OUTPUT, INTEGRATE
GENERATOR HEATING EFFECT OVER TIME, AND PREDICT WHEN THERMAL DAMAGE OF
ALTERNATOR WILL OCCUR. WHEN SIGNALED BY GENERATOR PROTECTOR OR OTHER
ENGINE GENERATOR PROTECTIVE DEVICES, A SHUNT-TRIP DEVICE IN THE GENERATOR
1. INDOOR AND OUTDOOR ENCLOSURES AND COMPONENTS: MANUFACTURER'S STANDARD
FINISH OVER CORROSION-RESISTANT PRETREATMENT AND COMPATIBLE PRIMER.
SHEET NO:
E-003
SYSTEM COMPONENTS.
5. CONFIGURATION:
DISCONNECT SWITCH SHALL OPEN THE SWITCH TO DISCONNECT THE GENERATOR FROM
LOAD CIRCUITS. PROTECTOR PERFORMS THE FOLLOWING FUNCTIONS:
1
2
3
4
5
1
L. SOURCE QUALITY CONTROL
1. PROTOTYPE TESTING: FACTORY TEST ENGINE GENERATOR USING SAME ENGINE MODEL,
CONSTRUCTED OF IDENTICAL OR EQUIVALENT COMPONENTS AND EQUIPPED WITH
IDENTICAL OR EQUIVALENT ACCESSORIES.
TESTS: COMPLY WITH IEEE 115 AND WITH NFPA 110, LEVEL 2 ENERGY CONVERTERS.
PART 3
EXECUTION
A. EXAMINATION
1. EXAMINE AREAS, EQUIPMENT BASES, AND CONDITIONS, WITH INSTALLER PRESENT, FOR
COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION AND OTHER CONDITIONS
D
AFFECTING PACKAGED ENGINE GENERATOR PERFORMANCE.
2. EXAMINE ROUGHING-IN FOR PIPING SYSTEMS AND ELECTRICAL CONNECTIONS. VERIFY
ACTUAL LOCATIONS OF CONNECTIONS BEFORE PACKAGED ENGINE GENERATOR
INSTALLATION.
3. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN
CORRECTED.
2
3
CONNECTION, AND INTEGRITY OF EACH ELEMENT OF ENGINE GENERATOR SYSTEM
BEFORE AND DURING SYSTEM OPERATION. CHECK FOR AIR, EXHAUST, AND FLUID
LEAKS.
2. COORDINATE TESTS WITH TESTS FOR TRANSFER SWITCHES AND RUN THEM
CONCURRENTLY.
3. LEAK TEST: AFTER INSTALLATION, CHARGE EXHAUST, COOLANT, AND FUEL SYSTEMS
AND TEST FOR LEAKS. REPAIR LEAKS AND RETEST UNTIL NO LEAKS EXIST.
4. OPERATIONAL TEST: AFTER ELECTRICAL CIRCUITRY HAS BEEN ENERGIZED, START UNITS
TO CONFIRM PROPER MOTOR ROTATION AND UNIT OPERATION FOR GENERATOR AND
ASSOCIATED EQUIPMENT.
5. RETEST: CORRECT DEFICIENCIES IDENTIFIED BY TESTS AND OBSERVATIONS, AND
RETEST UNTIL SPECIFIED REQUIREMENTS ARE MET.
6. REPORT RESULTS OF TESTS AND INSPECTIONS IN WRITING. RECORD ADJUSTABLE
RELAY SETTINGS AND MEASURED INSULATION RESISTANCES, TIME DELAYS, AND OTHER
VALUES AND OBSERVATIONS. ATTACH A LABEL OR TAG TO EACH TESTED COMPONENT
INDICATING SATISFACTORY COMPLETION OF TESTS.
B. PREPARATION
F. DEMONSTRATION
1. INTERRUPTION OF EXISTING ELECTRICAL SERVICE: DO NOT INTERRUPT ELECTRICAL
SERVICE TO FACILITIES OCCUPIED BY OWNER OR OTHERS UNLESS PERMITTED UNDER
THE FOLLOWING CONDITIONS AND THEN ONLY AFTER ARRANGING TO PROVIDE
TEMPORARY ELECTRICAL SERVICE ACCORDING TO REQUIREMENTS INDICATED:
1. ENGAGE A FACTORY-AUTHORIZED SERVICE REPRESENTATIVE TO TRAIN OWNER'S
MAINTENANCE PERSONNEL TO ADJUST, OPERATE, AND MAINTAIN PACKAGED ENGINE
GENERATORS.
c. NOTIFY OWNER NO FEWER THAN TWO WORKING DAYS IN ADVANCE OF PROPOSED
INTERRUPTION OF ELECTRICAL SERVICE.
d. DO NOT PROCEED WITH INTERRUPTION OF ELECTRICAL SERVICE WITHOUT OWNER'S
WRITTEN PERMISSION.
C. INSTALLATION
1. COMPLY WITH NECA 1 AND NECA 404.
2. COMPLY WITH PACKAGED ENGINE GENERATOR MANUFACTURERS' WRITTEN
INSTALLATION AND ALIGNMENT INSTRUCTIONS AND WITH NFPA 110.
C
3. EQUIPMENT MOUNTING:
a. INSTALL PACKAGED ENGINE GENERATORS ON CAST-IN-PLACE CONCRETE
EQUIPMENT BASES. COMPLY WITH REQUIREMENTS ON DRAWINGS FOR EQUIPMENT
BASES AND FOUNDATIONS
b. INSTALL PACKAGED ENGINE GENERATOR WITH VIBRATION ISOLATION DEVICES
DESCRIBED IN SECTION 2.9.
4. INSTALL PACKAGED ENGINE GENERATOR TO PROVIDE ACCESS, WITHOUT REMOVING
CONNECTIONS OR ACCESSORIES, FOR PERIODIC MAINTENANCE.
5. EXHAUST SYSTEM: INSTALL SCHEDULE 40 BLACK STEEL PIPING WITH WELDED JOINTS
AND CONNECT TO ENGINE MUFFLER. RE-USE EXISTING THIMBLE AT CEILING. PIPING
SHALL BE SAME DIAMETER AS MUFFLER OUTLET.
6. INSTALL ELECTRICAL DEVICES FURNISHED BY EQUIPMENT MANUFACTURERS BUT NOT
SPECIFIED TO BE FACTORY MOUNTED.
D. IDENTIFICATION
1. INSTALL A SIGN INDICATING THE GENERATOR NEUTRAL IS BONDED TO THE MAIN
SERVICE NEUTRAL AT THE MAIN SERVICE LOCATION.
E. FIELD QUALITY CONTROL
1. TESTING AGENCY:
a. PERFORM TESTS RECOMMENDED BY MANUFACTURER AND EACH VISUAL AND
B
MECHANICAL INSPECTION AND ELECTRICAL AND MECHANICAL TEST LISTED IN FIRST
TWO SUBPARAGRAPHS BELOW, AS SPECIFIED IN NETA ATS. CERTIFY COMPLIANCE
WITH TEST PARAMETERS.
a. VISUAL AND MECHANICAL INSPECTION:
a.a. COMPARE EQUIPMENT NAMEPLATE DATA WITH DRAWINGS AND THE
SPECIFICATIONS.
a.b. INSPECT PHYSICAL AND MECHANICAL CONDITION.
a.c. INSPECT ANCHORAGE, ALIGNMENT, AND GROUNDING.
a.d. VERIFY THAT THE UNIT IS CLEAN.
b. ELECTRICAL AND MECHANICAL TESTS:
b.a. TEST PROTECTIVE RELAY DEVICES.
b.b. VERIFY PHASE ROTATION, PHASING, AND SYNCHRONIZED OPERATION AS
REQUIRED BY THE APPLICATION.
b.c. FUNCTIONALLY TEST ENGINE SHUTDOWN FOR LOW OIL PRESSURE,
OVERTEMPERATURE, OVERSPEED, AND OTHER PROTECTION FEATURES AS
APPLICABLE.
b.d. VERIFY CORRECT FUNCTIONING OF THE GOVERNOR AND REGULATOR.
c. NFPA 110 ACCEPTANCE TESTS: PERFORM TESTS REQUIRED BY NFPA 110 THAT ARE
ADDITIONAL TO THOSE SPECIFIED HERE, INCLUDING, BUT NOT LIMITED TO,
SINGLE-STEP FULL-LOAD PICKUP TEST.
d. BATTERY TESTS: EQUALIZE CHARGING OF BATTERY CELLS ACCORDING TO
A
MANUFACTURER'S WRITTEN INSTRUCTIONS. RECORD INDIVIDUAL CELL VOLTAGES.
a. MEASURE CHARGING VOLTAGE AND VOLTAGES BETWEEN AVAILABLE BATTERY
TERMINALS FOR FULL-CHARGING AND FLOAT-CHARGING CONDITIONS. CHECK
ELECTROLYTE LEVEL AND SPECIFIC GRAVITY UNDER BOTH CONDITIONS.
b. VERIFY THAT MEASUREMENTS ARE WITHIN MANUFACTURER'S SPECIFICATIONS.
d. BATTERY-CHARGER TESTS: VERIFY SPECIFIED RATES OF CHARGE FOR BOTH
EQUALIZING AND FLOAT-CHARGING CONDITIONS.
e. SYSTEM INTEGRITY TESTS: METHODICALLY VERIFY PROPER INSTALLATION,
1
2
3
4
5
PERMIT STAMP
301 W. Northern Lights Blvd.
Suite 200
Anchorage, AK 99503
ph 907.276.6664
www.coffman.com AECC249
D
TOM E. LOONEY
Jan 30, 2025
TERED
No. EE9369
PROFESSIONA
L
ENG
CHUGIAK SENIOR
CENTER GENERATOR
C REPLACEMENT
MUNICIPALITY OF
ANCHORAGE
100% ISSUED FOR
CONSTRUCTION
B
REV DATE DESCRIPTION
PROJ. NO.
DRAWN
CHECKED
DATE
241484
ALM
TEL
01/30/2025
C COFFMAN ENGINEERS INC.
SHEET TITLE:
ELECTRICAL
SPECIFICATIONS
A
SHEET NO:
E-004
4
5
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

School Siding Replacement Rebidding Bid/RFP Status Open - accepting bids and proposals Bid/RFP

Haines Borough

Bid Due: 7/27/2025

RFP 25-14 - Gas Compressor Building Mandoor Canopies Published until 3 pm AKDT,

Chugach Electric Association, Inc

Bid Due: 7/30/2025

Academic Avenue Asphalt Parking Lot Repair Project JBER, AK The Department of Military

State Government of Alaska

Bid Due: 7/30/2025

RFB 25-14 - Gas Compressor Building Mandoor Canopies Published until 3 pm AKDT,

Chugach Electric Association, Inc

Bid Due: 7/30/2025