C1DZ--631-25-002 Renovate B2 for Pharmacy SF330 Requests for Qualifications Responses to RFIs Received.
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 16, 2025 |
| Due Date: | Dec 30, 2024 |
| Solicitation No: | 36C24124R0106 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Follow
Active
Contract Opportunity
Notice ID
36C24124R0106
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
241-NETWORK CONTRACT OFFICE 01 (36C241)
General Information View Changes
Classification View Changes
Description
Contact Information
History
- Contract Opportunity Type: Special Notice (Updated)
- Updated Published Date: May 15, 2025 11:15 am EDT
- Original Published Date: Nov 21, 2024 03:38 pm EST
- Updated Response Date: Dec 30, 2024 01:00 pm EST
- Original Response Date: Dec 30, 2024 01:00 pm EST
- Inactive Policy: Manual
- Updated Inactive Date: Jul 08, 2025
- Original Inactive Date: Apr 08, 2025
-
Initiative:
- None
- Original Set Aside:
- Updated Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: C1DZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS
-
NAICS Code:
- 541310 - Architectural Services
-
Place of Performance:
,
631-25-002 Renovate Building 2 for Pharmacy RFIs Received
Paragraph A. INTRODUCTION on page 1 indicates that the scope to be performed consists of interior spaces, however the design service list on page 3 indicates that Building 2 is part of the Northampton Veterans Administration Hospital Historic District and therefore care must be made with exterior changes to remain close to historical appearances. Please clarify, does scope include exterior improvements or is all work expected to be interior for the Building 2 renovation?
VA Response: Some exterior work expected. SOW has following line items regarding exterior:
Review and design of building egress pathways (i.e., entry doors, rear doors, ADA ramps, emergency egress stair towers, etc.)
Review of exterior walls to improve envelope performance.
Repairing the building envelope will be a part of this design as there are known issues with the masonry, windowsills and lintels, and other infrastructure.
Replacement of existing windows.
Professional Qualifications listed on page 6 state that the design firm must provide a Physical Security team member and resume as part of the submission. Please advise if this a low-voltage security designer or otherwise. The role of Physical Security is a bit ambiguous.
VA Response: Physical Security team member must be familiar with the PSRDM and meet the qualifications in section 1.8 of the manual:
In order to meet the physical security and resiliency requirements of this manual, as appropriate to the scope of the project, the design team must include: (1) a certified physical security specialist with an emphasis on risk and vulnerability assessments, physical security design and CPTED, and anti-terrorism force protection; (2) a control systems cybersecurity specialist with in-depth knowledge of the Risk Management Framework; (3) a certified physical security specialist with an emphasis on Electronic Security Systems; (4) certified information and communications technology (ICT) specialist with an emphasis on networking and cabling; (5) a certified systems integrator specialist with an emphasis on HSPD/PPD-21 integrations; and, (6) a licensed professional structural engineer who has specialized training in blast design and analysis (structural blast specialist). These specialists must be part of the design team during the concept phase of any project. The résumé of the specialist must be submitted to the VA Project Manager (PM), local facility equivalent, or Contracting Officer Representative for review and approval prior to the concept phase of the project. The qualifications of the firm for whom the specialist works must also be submitted with the résumé. The professional qualifications that all specialists must comply with PHYSICAL SECURITY & RESILIENCY DESIGN MANUAL October 1, 2020 Revised 05-01-2024 INTRODUCTION 1-23 are found where their respective disciplines are addressed in Chapters 2, 6, 7, and 10 of this manual.
Does the VA hire the Fire Protection engineer for the independent fire review or is that a consultant that should be included?
VA Response: The VA provides the Fire Protection Engineer for the Independent Fire Review. See section 2.2 which states, [a] complete design including but not limited to determination and evaluation of existing conditions, necessary engineering calculation, necessary design work, independent fire safety/life safety review (Independent Fire Safety Review provided by VA. A/E is required to address comments from this review), IH Services, quantity and cost estimates, bid schedule, construction cost estimates, a proposed construction schedule, design analyses and calculations, a design documentation report, engineering considerations and options report shall be developed for this project.Â
Paragraph A. INTRODUCTION on page 1 indicates that the scope to be performed consists of interior spaces, however the design service list on page 3 indicates that Building 2 is part of the Northampton Veterans Administration Hospital Historic District and therefore care must be made with exterior changes to remain close to historical appearances. Please clarify, does scope include exterior improvements or is all work expected to be interior for the Building 2 renovation?
VA Response: Some exterior work expected. SOW has following line items regarding exterior:
Review and design of building egress pathways (i.e., entry doors, rear doors, ADA ramps, emergency egress stair towers, etc.)
Review of exterior walls to improve envelope performance.
Repairing the building envelope will be a part of this design as there are known issues with the masonry, windowsills and lintels, and other infrastructure.
Replacement of existing windows.
Professional Qualifications listed on page 6 state that the design firm must provide a Physical Security team member and resume as part of the submission. Please advise if this a low-voltage security designer or otherwise. The role of Physical Security is a bit ambiguous.
VA Response: Physical Security team member must be familiar with the PSRDM and meet the qualifications in section 1.8 of the manual:
In order to meet the physical security and resiliency requirements of this manual, as appropriate to the scope of the project, the design team must include: (1) a certified physical security specialist with an emphasis on risk and vulnerability assessments, physical security design and CPTED, and anti-terrorism force protection; (2) a control systems cybersecurity specialist with in-depth knowledge of the Risk Management Framework; (3) a certified physical security specialist with an emphasis on Electronic Security Systems; (4) certified information and communications technology (ICT) specialist with an emphasis on networking and cabling; (5) a certified systems integrator specialist with an emphasis on HSPD/PPD-21 integrations; and, (6) a licensed professional structural engineer who has specialized training in blast design and analysis (structural blast specialist). These specialists must be part of the design team during the concept phase of any project. The résumé of the specialist must be submitted to the VA Project Manager (PM), local facility equivalent, or Contracting Officer Representative for review and approval prior to the concept phase of the project. The qualifications of the firm for whom the specialist works must also be submitted with the résumé. The professional qualifications that all specialists must comply with PHYSICAL SECURITY & RESILIENCY DESIGN MANUAL October 1, 2020 Revised 05-01-2024 INTRODUCTION 1-23 are found where their respective disciplines are addressed in Chapters 2, 6, 7, and 10 of this manual.
Does the VA hire the Fire Protection engineer for the independent fire review or is that a consultant that should be included?
VA Response: The VA provides the Fire Protection Engineer for the Independent Fire Review. See section 2.2 which states, [a] complete design including but not limited to determination and evaluation of existing conditions, necessary engineering calculation, necessary design work, independent fire safety/life safety review (Independent Fire Safety Review provided by VA. A/E is required to address comments from this review), IH Services, quantity and cost estimates, bid schedule, construction cost estimates, a proposed construction schedule, design analyses and calculations, a design documentation report, engineering considerations and options report shall be developed for this project.Â
Attachments/Links
Contracting Office Address
- ONE VA CENTER
- TOGUS , ME 04330
- USA
Primary Point of Contact
- Brian Kelly
- Brian.Kelly@va.gov
- Phone Number 413-584-4040 x6722
Secondary Point of Contact
- May 15, 2025 11:15 am EDTSpecial Notice (Updated)
- Apr 08, 2025 11:55 pm EDT Special Notice (Updated)
- Dec 18, 2024 10:38 am EST Special Notice (Updated)
- Nov 22, 2024 11:43 am EST Special Notice (Updated)
- Nov 21, 2024 03:38 pm EST Special Notice (Original)
Related Document
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Follow Project FLYTRAP 6.0 Active Contract Opportunity Notice ID WHSDIUFLYTRAP Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 10/16/2026
Follow $625M USACE SPD Vertical AE Design MATOC Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Due by 10/12/2026
Follow C--AR-POND CRK NWR-T26P1-RIVER ROAD BRIDGE Active Contract Opportunity Notice ID 140FGA26R0036 Related
INTERIOR, DEPARTMENT OF THE
Due by 10/02/2026
Follow C--PLAYGROUND HAZARD MITIGATION SIPI Active Contract Opportunity Notice ID 140A2326Q0244 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 10/02/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.