| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Apr 20, 2026 |
| Due Date: | Apr 23, 2026 |
| Solicitation No: | 1240BJ26Q0004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Amendment 1 (posted 4/20/2026): The purpose of this amendment is to make the following changes:
1. Disregard the custom sheltered entrances on sheet G-02 of the plans.
2. The quantity for item 2 subitem 55202-B2 has been increased to 2300.
3. The quantity for item 3 subitem 55202-O1 has been increased to 450.
4. There will not be a charge for on-site borrow.
5. The due date for quotes is extended to 4/23/2026 at 1700 (5 pm) Alaska time.
Statement of Requirement
This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.
Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.
Period of performance: 6/1/2026 to 10/31/2027.
The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.
| Mar 4, 2026 | [Combined Synopsis/Solicitation (Original)] BBVC Lakefront Trail and Outhouse Replacement |
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
IFQ # 10-003-27 Copper River Septic Construction IFQ # 10-003-27 Copper River Septic
State Government of Alaska
Bid Due: 8/14/2026
RFP: AIP 3-02-0016-258-2026 / CFAPT01510 - ANC Gates N1 and C3 Passenger Boarding
State Government of Alaska
Bid Due: 8/13/2026
Status Ref# Project Close Date Dayes Left Action Open 2024 - 2034 Selected
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Bid Due: 1/01/2036
Kwigillingok Airport Safety Improvements Plan Holders List Central Region , Kwigillingok This federally
State Government of Alaska
Bid Due: 8/05/2026