BBVC Lakefront Trail and Outhouse Replacement
| Agency: | AGRICULTURE, DEPARTMENT OF |
|---|---|
| State: | Alaska |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Mar 4, 2026 |
| Due Date: | Apr 21, 2026 |
| Solicitation No: | 1240BJ26Q0004 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Mar 03, 2026 03:54 pm AKST
- Original Date Offers Due: Apr 21, 2026 05:00 pm AKDT
- Inactive Policy: Manual
- Original Inactive Date: Jul 01, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
AKUSA
Statement of Requirement
This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.
- Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
- Option item: Construction of a trail connecting the beach access near the building to the parking lot.
Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.
Period of performance: 6/1/2026 to 10/31/2027.
The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.
- FREMONT WINEMA NF KLAMATH FALLS 2819 DAHLIA STREET
- KLAMATH FALLS , OR 97601
- USA
- Eric Oldenkamp
- eric.oldenkamp@usda.gov
- Mar 03, 2026 03:54 pm AKSTCombined Synopsis/Solicitation (Original)
Related Document
| Apr 20, 2026 | [Combined Synopsis/Solicitation (Updated)] BBVC Lakefront Trail and Outhouse Replacement |
See Also
ITB 2027-801 URSA MAJOR ELEMENTARY SCHOOL REPLACEMENT ITB-1-DEMOLITION Click here to be added
Anchorage School District
Due by 10/01/2026
Status Ref# Project Close Date Dayes Left Action Open 2024 - 2034 Selected
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 1/01/2036
Project: On behalf of the Alutiiq Tribe of Old Harbor - site tour
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Due by 9/28/2026
Follow SOURCES SOUGHT: JBE 089 CRH SIMULATOR FACILITY BUILDING (BRAND NAME REQUIREMENTS) Active
DEPT OF DEFENSE
Due by 9/29/2026