Backflow, valves and chiller replacements
| Agency: | JUSTICE, DEPARTMENT OF |
|---|---|
| State: | Maryland |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 5, 2025 |
| Due Date: | Sep 11, 2025 |
| Solicitation No: | 15A00025Q00000111 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Sep 05, 2025 07:09 am EDT
- Original Published Date: Sep 05, 2025 07:08 am EDT
- Updated Date Offers Due: Sep 11, 2025 02:59 pm EDT
- Original Date Offers Due: Sep 11, 2025 02:59 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Sep 26, 2025
- Original Inactive Date: Sep 26, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z1AA - MAINTENANCE OF OFFICE BUILDINGS
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Beltsville , MD 20705USA
The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services:
-
Backflow Preventors
- Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP
- Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP
- Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP
-
Main Gate Valves
- Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits.
- NOTE-This work will need to be completed during off hours.
-
Chiller Pipe Replacement
- Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room.
- Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line.
- Install 2 new thread-o-lets, plug one off and connect the new chemical line.
- Replace the schedule 80 PVC all the way back to the ball valve with new split rings.
- Leak checked to be performed and monitored by building engineers for 24 hours before insulating
- Install new insulation and wrapping over new pipe and tie into existing.
- The plastic vinyl 90's may be reused if not damaged during removal
- The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe.
- Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
- ATF ACQUISITIONS OFFICE 99 NEW YORK AVE
- WASHINGTON , DC 20226
- USA
- Brandon Hodnett
- Brandon.Hodnett@atf.gov
- Sep 05, 2025 07:09 am EDTSolicitation (Updated)
- Sep 05, 2025 07:08 am EDT Solicitation (Original)
Related Document
| Sep 9, 2025 | [Solicitation (Updated)] Backflow, valves and chiller replacements |
| Sep 16, 2025 | [Solicitation (Updated)] Backflow, valves and chiller replacements |
See Also
ID: BPM051541 Title: Maryland Department of Agriculture HVAC Status: Open Due / Close
State Government of Maryland
Due by 11/13/2026
ID: BPM059231 Title: IFB-27043 Door Hardware Replacement at Various Schools-Pkg. 2 Northern Bldg.
State Government of Maryland
Due by 11/24/2026
ID: BPM059372 Title: Plumbing JOC Status: Open Due / Close Date: 11/12/2026 Publish
State Government of Maryland
Due by 11/12/2026
Project Name Documents Deadline Ocean City Convention Center Lobby Floor Replacement Advertisement PDF
City of Ocean
Due by 11/30/2026