Air Compressor for Power Plant

Agency: Iowa State University
State: Iowa
Type of Government: State & Local
NAICS Category:
  • 333912 - Air and Gas Compressor Manufacturing
  • 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
Posted Date: Mar 9, 2024
Due Date: Mar 22, 2024
Solicitation No: RFQ-1000967
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Information
Type Request for Quote (Public)
Status Issued
Number RFQ-1000967 (Air Compressor for Power Plant)
Issue Date & Time 3/8/2024 03:00:57 PM (CT)
Close Date & Time 3/22/2024 04:00:00 PM (CT)
Notes
Iowa State University of Science and Technology, also referred to as Owner, is seeking bids for a Rotary Screw Air Compressor for the Power Plant.

Contractors should read all materials carefully and note the bid due date and project completion date.
Contractors must submit all questions in the "Questions" tab related to this bid opportunity.
Contact Information
Name Jeff Brundage
Address 200 General Service Building
700 Wallace Road
Ames, IA 50011 USA
Phone (515) 294-0829
Fax
Email jbrundag@iastate.edu

Attachment Preview

RFQ-1000967
Air Compressor for Power Plant
Issue Date: 3/8/2024
Questions Deadline: 3/19/2024 04:00 PM (CT)
Response Deadline: 3/22/2024 04:00 PM (CT)
Contact Information
Contact: Jeff Brundage
Address: Procurement Services
200 General Service Building
700 Wallace Road
Ames, IA 50011
Phone: (515) 294-0829
Email: jbrundag@iastate.edu
Page 1 of 10 pages
Deadline: 3/22/2024 04:00 PM (CT)
RFQ-1000967
Event Information
Number:
RFQ-1000967
Title:
Air Compressor for Power Plant
Type:
Request for Quote (Public)
Issue Date:
3/8/2024
Question Deadline: 3/19/2024 04:00 PM (CT)
Response Deadline: 3/22/2024 04:00 PM (CT)
Notes:
Iowa State University of Science and Technology, also referred to as Owner, is
seeking bids for a Rotary Screw Air Compressor for the Power Plant.
Contractors should read all materials carefully and note the bid due date and project
completion date.
Contractors must submit all questions in the "Questions" tab related to this bid
opportunity.
Bid Attachments
Insurance Language - Equipment Repair, Install, Maintenance (low risk) 09-2020.pdf
Download
Insurance Requirements - Equipment Repair, Install, Maintenance (low risk) 09-2020
ISU Instructions.pdf
Download
Review the instructions for important information. REVISED APRIL 2022
ISU General Terms & Conditions.pdf
Download
Review the general terms and conditions carefully and any exceptions should be listed in the "Attributes" section.
REVISED APRIL 2022
ISU Equipment Terms & Conditions.pdf
Download
Review the equipment terms and conditions carefully and any exceptions should be listed in the "Attributes" section
Requested Attachments
Itemized Quotation
(Attachment required)
Attach itemized quotation for Complete System to include equipment, accessories, and freight that meets all
specifications listed under the Attributes tab.
Additional Documents
Use this for any additional literature, quotes for additional costs, etc.
Page 2 of 10 pages
Deadline: 3/22/2024 04:00 PM (CT)
RFQ-1000967
Bid Attributes
1 Evaluation Criteria
The evaluation of this RFP/RFQ may be based upon, but not limited to:
ꞏ Pricing
ꞏ Experience with similar projects
Exceptions taken to RFP Terms and conditions
ꞏ Ability to meet project timeline
Ability to meet required specifications
ꞏ Interchangeability of spare parts with existing equipment-Similarity of operation/maintenance with
existing equipment
Read and understood
(Required: Check if applicable)
2 Expected lead time for equipment.
(Required: Maximum 200 characters allowed)
3 Gear driven, oil flooded, single stage rotary screw air compressor
Read and Understood
(Required: Check if applicable)
4 Water-cooled
Read and Understood
(Required: Check if applicable)
5 Touchscreen microprocessor controller
Read and Understood
(Required: Check if applicable)
6 Oil cooler/aftercooler: shell and tube heat exchanger
Read and Understood
(Required: Check if applicable)
7 cULus listed and CSA approved electronics
Read and Understood
(Required: Check if applicable)
8 Enclosure: unenclosed—standard; quiet enclosed—optional
Read and Understood
(Required: Check if applicable)
Page 3 of 10 pages
Deadline: 3/22/2024 04:00 PM (CT)
RFQ-1000967
9 Automatic, integral part-load control system
Read and Understood
(Required: Check if applicable)
1 Optional package mounted moisture separator/trap
0
Read and Understood
(Required: Check if applicable)
1 Wye-delta starter
1
Read and Understood
(Required: Check if applicable)
1 NEMA 4 electrical enclosure
2
Read and Understood
(Required: Check if applicable)
1 ODP main motor; optional TEFC main motor
3
Read and Understood
(Required: Check if applicable)
1 ASME coded oil reservoir
4
Read and Understood
(Required: Check if applicable)
1 Thermostatic oil control mixing valve
5
Read and Understood
(Required: Check if applicable)
1 Stainless steel control lines
6
Read and Understood
(Required: Check if applicable)
1 Minimum pressure discharge check valve
7
Read and Understood
(Required: Check if applicable)
1 CAPACITY: 1039.3 CFM @ 100 PSI
8
Read and Understood
(Required: Check if applicable)
1 VOLTAGE: 460/3/60
9
Read and Understood
(Required: Check if applicable)
2 HORSEPOWER: 200HP
0
Read and Understood
(Required: Check if applicable)
2 UNIT DIMENSIONS: 126” L x 90” W x 76” H, 9350 lbs.
1
Read and Understood
(Required: Check if applicable)
Page 4 of 10 pages
Deadline: 3/22/2024 04:00 PM (CT)
RFQ-1000967
2 BASE MOUNTED
2
Read and Understood
(Required: Check if applicable)
2 NO ENCLOSURE
3
Read and Understood
(Required: Check if applicable)
2 WITH MOISTURE SEPARATOR
4
Read and Understood
(Required: Check if applicable)
2 WITH AUTO WATER TEMP REGULATOR (SHIPPED LOOSE)
5
Read and Understood
(Required: Check if applicable)
2 WITH MAGNETIC WATER CONTROL VALVE (SHIPPED LOOSE)
6
Read and Understood
(Required: Check if applicable)
2 START UP AND COMMISSIONING SERVICES
7
Read and Understood
(Required: Check if applicable)
2 1 year minimum warranty on all parts, with option for extended warranty through maintenance program.
8
Read and Understood
(Required: Check if applicable)
2 Exceptions to General Terms and Conditions
9 Do you have any exceptions to the General Terms and Conditions (under Attachments tab)? If YES, please list
exceptions below.
Yes No
(Required: Check only one)
3 Exception to General Terms and Conditions - 1
0 Include page number, section and reason for exception.
Note: Exceptions taken to the RFP/RFQ documents may cause the Proposal to be rejected at the sole discretion of
University. Any terms to which Contractor does not take exception shall be binding and any subsequent objections
to those terms shall have no effect.
(Optional: Maximum 1000 characters allowed)
Page 5 of 10 pages
Deadline: 3/22/2024 04:00 PM (CT)
RFQ-1000967

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Bid Information Type Request for Proposal (Public) Status Issued Number RFQ-1000979 (Code Weld

Iowa State University

Bid Due: 5/16/2024