ITB# ST-24-01-06 New Building 102-STEM 2 Addendum #1 Project Manual II Addendum # 2 Project…
Florida Gateway College | Florida
ITB# ST-24-01-06 New Building 102-STEM 2
Florida Gateway College | Florida
ITB# AI-24-01-05 Audio Integration and LED Video Wall Installation in the Performing Arts Center Bid…
Florida Gateway College | Florida
Addendum #1
Florida Gateway College | Florida
ITB# RS-24-01-05 Resurfacing and Reconstruction of SE Staff Way https://www.fgc.edu/wp-content/uploads/2024/01/ITB-Packet-RS-24-01-05.pdf Posted January 18, 2024 @…
Florida Gateway College | Florida
ITB# RP-24-01-04 Repaving of Parking Lot #11 https://www.fgc.edu/wp-content/uploads/2024/01/ITB-Packet-RP-24-01-04.pdf Posted January 18, 2024 @ 9:00 a.m.
Florida Gateway College | Florida
ITB# RS-24-01-05 Resurfacing and Reconstruction of SE Staff Way
Florida Gateway College | Florida
ITB# RP-24-01-04 Repaving of Parking Lot #11
Florida Gateway College | Florida
ITB# RP-24-01-04 Repaving of Parking Lot #11 Posted January 18, 2024 @ 9:00 a.m. ITB#…
Florida Gateway College | Florida
ITB Packet RP-24-1-03 Repaving of Parking Lot #11 Posted October 13, 2023 @ 12:00 p.m.…
Florida Gateway College | Florida
ITB Packet RP-24-1-03 Repaving of Parking Lot #11 Posted October 13, 2023 @ 12:00 p.m.
Florida Gateway College | Florida
ITB# RP-24-1-03 Repaving of Parking Lot #11 Posted October 6, 2023 @ 2:00 p.m.
Florida Gateway College | Florida
ITB# RR-24-1-02 Re-Roofing for Multi-Use Facility https://www.fgc.edu/wp-content/uploads/2023/09/ITB-Packet-RR-24-1-02.pdf Posted September 25, 2023 @ 4:15 p.m.
Florida Gateway College | Florida
ITB# 24-1-01 RE-ROOFING FOR MULTI-USE FACILITY Due to the upcoming storm, the Pre-Bid conference for…
Florida Gateway College | Florida
ITB# 24-1-01 RE-ROOFING FOR MULTI-USE FACILITY Due to the upcoming storm, the Pre-Bid conference for…
Florida Gateway College | Florida
ITB# 24-1-01 RE-ROOFING FOR MULTI-USE FACILITY Posted August 23, 2023 @ 10:15 a.m.
Florida Gateway College | Florida