Z--Russel Creek Temporary Bridge Installation for the
| Agency: | INTERIOR, DEPARTMENT OF THE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Jun 24, 2025 |
| Due Date: | Jun 27, 2025 |
| Solicitation No: | DOILFBO250037 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Jun 24, 2025 01:29 pm PDT
- Original Response Date: Jun 27, 2025 02:30 pm PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jul 12, 2025
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Interest is being sought from responsible vendors who have the technical capability to perform the following requirement. The work shall consist of but is not limited to manufacturing and transporting the prefabricated modular bridge and all related components for temporary installation; roadway minor excavation and embankment; hauling excavated material to disposal area as showing the plans; placement of bedding and base aggregate; placement of precast concrete bridge sills; seeding; and cleanup.
The project site is located on the Coos Bay District, Coos County, Oregon, Township 30 South, Range 12 West Section 19, approximately 10.3 miles south of the town of Myrtle Point. The project begins at Milepost 0.0 at the entrance of Dement Creek Road from Power Highway (542 HWY) and the end at Milepost 4.9 at the crossing Russel Creek and 30-12-19.0 Road.
See attached draft Statement of Work and Drawings.
IAW FAR 36.204 Disclosure of the magnitude of construction projects, the magnitude of this project is between $250,000 and $500,000.
All responsible sources may submit a capability statement and express their interest. Responses shall include the following:
1. Company name
2. Company point of contact
3. SAM UEI
Responses must be received by Friday, June 27, 2025, no later than 2:30 PM Pacific Time. Email responses to Susanne Clark, Contract Specialist at: susanneclark@blm.gov with the subject line "Response to Sources Sought Notice - Russel Creek Temp. Bridge Installation - DOILFBO250037".
- 1220 SW 3RD AVE
- PORTLAND , OR 97204
- USA
- Clark, Susanne
- susanneclark@blm.gov
- Phone Number 5038086494
- Fax Number (503) 808-6312
- Jun 24, 2025 01:29 pm PDTSources Sought (Original)
See Also
Follow Z--REPLACE PHYSICAL SECURITY ALARM SYSTEM Active Contract Opportunity Notice ID 140P6326B0010 Related
INTERIOR, DEPARTMENT OF THE
Follow Fuel Tank Inspection, Test and Maintenance Service at Osan AB, Korea Active
DEPT OF DEFENSE
Due by 10/07/2026
Follow Z--GOGA 336173 - Repair Conzelman Road Active Contract Opportunity Notice ID 140P2026R0106
INTERIOR, DEPARTMENT OF THE
Due by 10/29/2026
Follow SPD-AF Fuels Maintenance and Repair Active Contract Opportunity Notice ID W912DY26RA006 Related
DEPT OF DEFENSE
Due by 9/24/2026