191Z1026R0001 - INTEGRATION OF EPO IN JUCR
| Agency: | STATE, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| Set Aside: | No Set aside used |
| Posted Date: | Apr 13, 2026 |
| Due Date: | Apr 30, 2026 |
| Solicitation No: | 191Z1026R0001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
- Original Published Date: Apr 13, 2026 09:21 am UTC+03
- Original Date Offers Due: Apr 30, 2026 05:00 pm UTC+03
- Inactive Policy: Manual
- Original Inactive Date: Apr 30, 2026
-
Initiative:
- None
- Original Set Aside: No Set aside used
- Product Service Code: C1EZ - ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER INDUSTRIAL BUILDINGS
-
NAICS Code:
- 2362 - Nonresidential Building Construction
-
Place of Performance:
Baghdad , IQ-BGIRQ
The United States Embassy in Baghdad is soliciting proposal of a project to provide Emergency Power off button in the Computer Room (JUCR), Comply with OBO requirements to ensure safety.The United States Embassy in Baghdad is soliciting proposal of a project to provide Emergency Power off button in the Computer Room (JUCR), Comply with OBO requirements to ensure safety.
The Statement of Work covers the integration of an Emergency Power Off (EPO) system into an existing electrical and UPS installation. The work is limited to the addition of EPO functionality and associated control wiring, interfaces, and verification activities only. No replacement, relocation, or upgrade of existing UPS units, batteries, or distribution equipment is included, except as required to properly interface the EPO system.
The intent of this work is to ensure that activation of a single EPO device results in shutdown of all UPS units and tripping of the main circuit breakers, while preventing stored battery energy from supplying the load, in accordance with NFPA 70 (NEC) Article 645.11.
- US DEPT OF STATE, 2201 C ST NW
- WASHINGTON , DC 20520
- USA
- Procurement Agent 2
- baghdadgsoprocagt2@state.gov
- Apr 13, 2026 09:21 am UTC+03Combined Synopsis/Solicitation (Original)
See Also
Follow C--Martime NWR Interpretive Exhibit Services Active Contract Opportunity Notice ID 140FF027Q0002 Related
INTERIOR, DEPARTMENT OF THE
Due by 11/11/2026
Follow MN FERGUS FALLS WMD PRKING REHAB Active Contract Opportunity Notice ID 140FF027R0006
INTERIOR, DEPARTMENT OF THE
Due by 11/10/2026
Follow C1AZ--631-21-011 Build Elevator Tower for Building 25 A/E Design SF330 Request for
VETERANS AFFAIRS, DEPARTMENT OF
Due by 12/07/2026
Follow GEOTECHNICAL ARCHITECTURE AND ENGINEER SERVICES IN Active Contract Opportunity Notice ID 140SS127R0001
INTERIOR, DEPARTMENT OF THE
Due by 11/21/2026