Z2DA--Renovate Halls, Walls, Ceilings
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Feb 28, 2025 |
| Due Date: | Mar 18, 2025 |
| Solicitation No: | 36C24624B0005 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Feb 28, 2025 09:26 am EST
- Original Published Date: Feb 27, 2024 11:54 am EST
- Updated Date Offers Due: Mar 18, 2025 11:00 am EDT
- Original Date Offers Due: Apr 04, 2024 10:00 am EDT
- Inactive Policy: Manual
- Updated Inactive Date: Apr 17, 2025
- Original Inactive Date: Jul 12, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
1.Hazmat survey - Question #8 & #10 requested a copy of the HAZmat Surveys and the response was that an "ACM report was provided in the Bid Documents", however no ACM report was included with the bid documents. Please provide. Â
The ACM report by dated November 23, 2020, should have been included right after Section 02 83 33.13 in the specification book. IT is attached herein as a separate file.
2.Asbestos containment Question #31 - The answer stated that "halls must be in operational state the next day".  Please clarify if the Government intends for us to take down containment areas at the end of each day and set them up again the following morning which will dramatically slow down the abatement process and could create a potentially unsafe environment with multiple disturbances to the affected areas.  We would propose to keep containment in place to quickly complete abatement activities and keep hall access open as much as possible.  Please clarify the Gov'ts intent on this.
Abatement/containment will take priority. Containment not to be removed once in place. Abatement procedures to be followed. The contractor may be required to work with the VA on setup to maintain access to a certain area, if possible.
(Note: Specification Sections 02 82 11, 02 82 13.19, and 02 83 33.13 should be reviewed for additional asbestos containment procedures.) 3. Expansion Joints scope of work Question #23:
A-101 Demo Note 1, states to remove existing joint cover plate at floor and walls (do not remove until new plates are ready for installation).
A-101 Key Note 1, states to provide aluminum expansion joint cover plate at floor at walls.
A-101 Key Note 6, states to replace steel protection at both sides of expansion joint cover plate.
Detail 12/A-501 indicates a cut section of a floor expansion joint. There is a note that states to field verify. The note is pointing to a dotted line that seems to indicate the removal of the entire body of the expansion joint.
The intent is to remove and replace the cover plate, while leaving the expansion joint body in place. The steel protection on both sides of wall expansion joint cover plate in Corridor CG004 as shown on A-101 Keynote 6 and Floor Plan 1 is a separate item. Please also refer to Hallway Elevations 3 and 4 on Sheet A-201.
- 100 EMANCIPATION DR
- HAMPTON , VA 23667
- USA
- Alice V Custis
- Alice.Custis@va.gov
- Feb 28, 2025 09:26 am ESTSolicitation (Updated)
- Feb 28, 2025 09:25 am EST Solicitation (Updated)
- Feb 14, 2025 03:44 pm EST Solicitation (Updated)
- Feb 14, 2025 03:41 pm EST Solicitation (Updated)
- Jan 31, 2025 09:37 am EST Solicitation (Updated)
- Jan 31, 2025 08:42 am EST Solicitation (Updated)
- Jan 22, 2025 02:16 pm EST Solicitation (Updated)
- Jan 22, 2025 02:11 pm EST Solicitation (Updated)
- Dec 18, 2024 12:36 pm EST Solicitation (Updated)
- Dec 18, 2024 12:30 pm EST Solicitation (Updated)
- Nov 26, 2024 11:28 am EST Solicitation (Updated)
- Nov 22, 2024 12:05 pm EST Solicitation (Updated)
- Oct 31, 2024 09:07 am EDT Solicitation (Updated)
- Oct 31, 2024 08:52 am EDT Solicitation (Updated)
- Oct 29, 2024 11:49 am EDT Solicitation (Updated)
- Oct 29, 2024 11:37 am EDT Solicitation (Updated)
- Oct 29, 2024 11:06 am EDT Solicitation (Updated)
- Oct 29, 2024 11:05 am EDT Solicitation (Updated)
- Oct 29, 2024 10:00 am EDT Solicitation (Updated)
- Oct 29, 2024 09:31 am EDT Solicitation (Updated)
- Oct 28, 2024 12:49 pm EDT Solicitation (Updated)
- Oct 28, 2024 12:48 pm EDT Solicitation (Updated)
- Oct 28, 2024 12:24 pm EDT Solicitation (Updated)
- Oct 16, 2024 10:34 am EDT Solicitation (Updated)
- Oct 16, 2024 09:46 am EDT Solicitation (Updated)
- Sep 27, 2024 11:22 am EDT Solicitation (Updated)
- Sep 27, 2024 09:30 am EDT Solicitation (Updated)
- Sep 26, 2024 01:51 pm EDT Solicitation (Updated)
- Apr 07, 2024 11:55 pm EDT Solicitation (Updated)
- Feb 27, 2024 11:54 am EST Solicitation (Original)
Related Document
| Sep 27, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Sep 27, 2024 | [Presolicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Oct 16, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Oct 28, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Oct 29, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Oct 31, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Nov 22, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Nov 26, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Dec 18, 2024 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Jan 22, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Jan 31, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Feb 14, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Mar 6, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Apr 3, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Apr 14, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Apr 17, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| May 8, 2025 | [Solicitation (Updated)] Z2DA--Renovate Halls, Walls, Ceilings |
| Jun 27, 2025 | [Award Notice (Original)] Z2DA--Renovate Halls, Walls, Ceilings |
See Also
Follow Z1DA--Replace Cast Iron Fittings 676-23-009 Active Contract Opportunity Notice ID 36C25226B0037 Related
VETERANS AFFAIRS, DEPARTMENT OF
Due by 10/14/2026
Follow ZION-EAST ENTRANCE STATION REHAB Active Contract Opportunity Notice ID 140P6026Q0063 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/15/2026
Follow NNSY DD4 DUCT INSULATION REPLACEMENT Active Contract Opportunity Notice ID N4008526R0254 Related
DEPT OF DEFENSE
Due by 9/21/2026
Follow MT-BOWDOIN NWR-HQ OFFICE FLOORS Active Contract Opportunity Notice ID 140FGA26Q0074 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 9/23/2026