Z2DA--657-21-117JB, Correct Deficiencies Identified During Triennial Testing Phase 2
| Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) |
| Posted Date: | Feb 7, 2025 |
| Due Date: | Feb 21, 2025 |
| Solicitation No: | 36C25525R0041 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: Feb 07, 2025 01:20 pm CST
- Original Response Date: Feb 21, 2025 10:00 am CST
- Inactive Policy: Manual
- Original Inactive Date: Mar 23, 2025
-
Initiative:
- None
- Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Product Service Code: Z2DA - REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES
-
NAICS Code:
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
-
Place of Performance:
St louis Jefferson Barracks 1 Jefferson Barracks Drive6 St. Louis , 63125USA
Statement of Work: 657-21-117JB, Phase 2
Correct Deficiencies Identified During Triennial Testing
January 23, 2025 Purpose of Project:
The VA St. Louis Health Care System, Jefferson Barracks Division, will correct various electrical deficiencies in buildings 18, 51, and 53, and outside buildings 18, and 53.
Statement of Work:
The Construction firm must provide construction services as delineated in the Plans and Specifications. This project will correct deficiencies with some VA electrical equipment. New equipment shall have all the required working clearances, according to current electrical codes.
Building 18: Remove and replace outside 300kVA transformer T18-A, construct cast-in-place reinforced concrete pad, per plans and specifications, and manufacturer s recommendations.
Building 51:
Remove and replace Panels MDP-51A in Basement Mechanical Room BA101, construct cast-in-place reinforced concrete housekeeping pad, per plans and specifications, and manufacturer s recommendations.
Remove and replace Panels MSB-51A in Basement Mechanical Room BA100, construct cast-in-place reinforced concrete housekeeping pad, per plans and specifications, and manufacturer s recommendations.
Remove ATS-51A from Basement Mechanical Room BA101, and move to Basement Mechanical Room BA100, in Basement Mechanical area, construct cast-in-place reinforced concrete housekeeping pad, per plans and specifications, and manufacturer s recommendations.
Building 53: Remove and replace outside 750kVA transformer, construct cast-in-place reinforced concrete pad, per plans and specifications, and manufacturer s recommendations.
At the beginning of the project, the Contractor will create a Gantt chart or similar spreadsheet to indicate project phasing and supply it to the COR. The contractor shall be responsible for updating the spreadsheet as the project progresses.
All work shall comply with the VA TIL specifications.
All Contractor personnel shall wear the proper safety equipment required by all applicable VA Safety regulations and OSHA to accomplish this type of work.
All work shall comply with all VA health care provisions, such as ICRA (Infection Control Risk Assessment) provisions, ILSM, and all applicable State, National, and U.S. Federal Codes.
For all items removed by this Statement of Work, the Contractor shall be responsible for the safe and legal disposal or recycle of all items listed. The Contractor will have signed paperwork from the disposal site or recycle center indicating all removed items are disposed of properly and in accordance with all applicable State and Federal Codes and Laws.
All outside equipment installed through this project shall adhere to National Electrical Code (NEC) Outdoors section 10.26(F)(2).
- VA MEDICAL CENTER 4101 SOUTH 4TH STREET
- LEAVENWORTH , KS 66048
- USA
- Jennifer Hill
- Jennifer.Hill@va.gov
- Phone Number 913-946-1975
- Feb 07, 2025 01:20 pm CSTPresolicitation (Original)
Related Document
| Feb 21, 2025 | [Solicitation (Original)] Z2DA--657-21-117JB, Correct Deficiencies Identified During Triennial Testing Phase 2 |
| Mar 18, 2025 | [Solicitation (Updated)] Z2DA--657-21-117JB, Correct Deficiencies Identified During Triennial Testing Phase 2 |
See Also
Follow Z--REPLACE PHYSICAL SECURITY ALARM SYSTEM Active Contract Opportunity Notice ID 140P6326B0010 Related
INTERIOR, DEPARTMENT OF THE
Follow Fuel Tank Inspection, Test and Maintenance Service at Osan AB, Korea Active
DEPT OF DEFENSE
Due by 10/07/2026
Follow Z--GOGA 336173 - Repair Conzelman Road Active Contract Opportunity Notice ID 140P2026R0106
INTERIOR, DEPARTMENT OF THE
Due by 10/29/2026
Follow SPD-AF Fuels Maintenance and Repair Active Contract Opportunity Notice ID W912DY26RA006 Related
DEPT OF DEFENSE
Due by 9/24/2026