Y--Stegall Substation Stage 07
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | May 21, 2026 |
| Due Date: | Jul 24, 2026 |
| Solicitation No: | 89503226BWA000075 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: May 21, 2026 09:30 am MDT
- Original Response Date: Jul 24, 2026 02:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Sep 30, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project.
The Stegall Substation Stage 07 Phase 01 Construction Project enhances WAPA’s ability to provide reliable/cost-efficient electrical power by replacing end-of-life control building, disconnect switches, and oil circuit breakers. New gas circuit breakers are on site and ready for installation by the contractor. WAPA benefits from these replacements by resolving deteriorating and potentially dangerous equipment conditions while setting up the substation for future Phase 02 conversion to breaker and a half bus configuration.
The principal components of work include the following:
Replace 115kV circuit breakers, 230 and 115kV disconnect switches, re-conductor 230 and 115kV main bus, construct new control building and comm tower
Location:
Stegall Substation
Situated near Stegall Road in the unincorporated community of Stegall, NE, just north of the Colorado-Nebraska border.
Directions:
From Gering head south on 10th Street (Kimball Avenue) from M Street for 1.8 miles to Robidoux Road. Turn right and go 4 miles to County Road 17. Turn right and go 0.1 miles to Robidoux Road. Turn left and go 3.3 miles on Robidoux Road, turn right and continue 5 miles on Robadeuax Road to Stegall Road. Turn right and go 0.8 miles to substation on the right.
Latitude: N 41° 49' 10"
Longitude: W 103° 56' 37"
Elevation: 4256 '
Datum: NAD83/WGS84
The anticipated period of performance is 800 calendar days after Notice to Proceed. The estimated magnitude of construction is Between $5M and $10M. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M.
The solicitation including specifications and drawings will be issued electronically on or about 9 June 2026 at the following sites: https://www.fedconnect.net and https://www.sam.gov.
NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.
Please see the link for Construction Change Order Definitization Notices -
https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx
- 5555 E. CROSSROADS BLVD
- LOVELAND , CO 80538
- USA
- Pratt, John W.
- jpratt@wapa.gov
- Phone Number 720-962-7166
- May 21, 2026 09:30 am MDTPresolicitation (Original)
Related Document
| Jun 29, 2026 | [Solicitation (Original)] Stegall Substation Stage 07 Phase 01 |
| Aug 5, 2026 | [Solicitation (Updated)] Y--Stegall Substation Stage 07 Phase 01 |
| Aug 13, 2026 | [Solicitation (Updated)] Y--Stegall Substation Stage 07 Phase 01 |
See Also
Follow Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025
DEPT OF DEFENSE
Due by 3/18/2028
Follow Beach Parking Lot Rehabilitation, Surry Mountain Lake, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Follow Y--SPECIAL NOTICE - INDUSTRY DAY/PROJECT PRESENTATION - National Mall and Memorial Active
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile
DEPT OF DEFENSE
Due by 9/16/2026