Y--North Gunnison Substation 115kV Switch Installation
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | May 4, 2026 |
| Due Date: | Jul 3, 2026 |
| Solicitation No: | 89503226BWA000078 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: May 04, 2026 09:06 am MDT
- Original Response Date: Jul 03, 2026 02:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Aug 28, 2026
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
The Western Area Power Administration (WAPA, Rocky Mountain Region (RMR) has a requirement for a Contractor to provide labor, materials, tools, equipment, transportation, and other resources necessary to complete this project.
North Gunnison 115-kV Switch Installation to add a 115kV Disconnect Switch to the bus work to provide flexible operation to feed the North Gunnison loads and allow WAPA to maintain all the electrical substation equipment.
The principal components of work include the following:
a. Provide demolition and site development.
b. Remove and dispose of existing pedestals, rigid bus, insulators, and concrete foundations.
c. Furnish and install 115kV disconnect switch, structural steel, foundations, and associated equipment.
Location:
North Gunnison Substation
Directions: From Montrose, Colorado, take U.S. Highway 50 (east) approximately 66 miles to Gunnison, Colorado. Turn left (north) on State Route 135; go approximately 1.1 miles towards Crested Butte, Colorado. Then turn right (east) on Clark Boulevard to go to North Gunnison Communication Site.
Latitude: N 38° 33' 37"
Longitude: W 106° 55' 29"
Elevation: 7749'
Datum: NAD83/WGS84
The anticipated period of performance is 730 calendar days after Notice to Proceed. The estimated magnitude of construction is Between $100,000 and $250,000. FAR Part 14 is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $45.0M.
The solicitation including specifications and drawings will be issued electronically on or about 3 June 2026 at the following sites:
https://www.fedconnect.net and https://www.sam.gov.
NOTE: The Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.
Please see the link for Construction Change Order Definitization Notices -
https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx
- 5555 E. CROSSROADS BLVD
- LOVELAND , CO 80538
- USA
- Pratt, John W.
- jpratt@wapa.gov
- Phone Number 720-962-7166
- May 04, 2026 09:06 am MDTPresolicitation (Original)
Related Document
| Jun 3, 2026 | [Solicitation (Original)] North Gunnison Substation 115kV Switch Install |
| Jun 9, 2026 | [Solicitation (Updated)] Y--North Gunnison Substation 115kV Switch Install |
| Jun 12, 2026 | [Solicitation (Updated)] Y--North Gunnison Substation 115kV Switch Install |
| Jun 20, 2026 | [Solicitation (Updated)] Y--North Gunnison Substation 115kV Switch Install |
| Jul 2, 2026 | [Solicitation (Updated)] Y--North Gunnison Substation 115kV Switch Install |
| Jul 31, 2026 | [Award Notice (Original)] Y--North Gunnison Substation 115kV Switch Installation |
See Also
Follow Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025
DEPT OF DEFENSE
Due by 3/18/2028
Follow Beach Parking Lot Rehabilitation, Surry Mountain Lake, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Follow Y--SPECIAL NOTICE - INDUSTRY DAY/PROJECT PRESENTATION - National Mall and Memorial Active
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile
DEPT OF DEFENSE
Due by 9/16/2026