Y--DEVA 335272 - TITUS CANYON ROAD CONSTRUCTION
| Agency: | INTERIOR, DEPARTMENT OF THE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Nov 7, 2024 |
| Due Date: | Nov 22, 2024 |
| Solicitation No: | 140P2025R0024 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Nov 07, 2024 08:33 am MST
- Original Response Date: Nov 22, 2024 11:00 am MST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Dec 07, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Project Scope:
Titus Canyon is the most popular back-country road in Death Valley National Park. This project will make repairs to the eastern 13.5 miles of Titus Canyon Road between the east boundary gate and the head of the canyon just west of the Leadfield town site. The 97-year-old, 24.7-mile route, of which the easternmost 22 miles were classified as a route suitable only for high clearance/4x4 vehicles, was heavily damaged in both the August 2022 and 2023 storm events. Due to the severe damage, the road currently is impassable for all vehicles larger than a bicycle at multiple locations. Those two storm events produced rainfall that far exceeded previous historic storm events.
The most common form of damage was erosional gully cutting from storm runoff running down long lengths of the roadway due to the extremely high flows and inadequate numbers of runoff diversion structures, or diversions that were no longer maintained and thus allowed runoff to concentrate on the roadway. There also were multiple road crossings of wash channels where the high flood flows jumped the wash channels and ran down and cut gullies in long lengths of the roadway. Additionally, the heavy rains destabilized many of the steep slopes above the roadway and generated significant rockfall onto the roadway. On multiple steep sidehill roadway segments, especially in the vicinity of Red Pass, the poorly compacted outboard edge of the roadway was also destabilized by the heavy rains and runoff. In several of these areas the remaining roadway width has been reduced to an unsafe dimension (even for 4x4 vehicles) of 10-feet or less. On the westernmost 8-miles of the road between Leadfield and the canyon mouth where the road was located on the floor of Titus Canyon, the road was totally obliterated by the flood flows and deep deposition of alluvial sand, gravel, and boulders.
- 1 Denver Federal Center, Building 50 P.O. Box 25287
- Denver , CO 80225
- USA
- Dyer, Rachel
- rachel_dyer@nps.gov
- Phone Number 0000000000
- Nov 07, 2024 08:33 am MSTSources Sought (Original)
See Also
Follow Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025
DEPT OF DEFENSE
Due by 3/18/2028
Follow Beach Parking Lot Rehabilitation, Surry Mountain Lake, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Follow Y--SPECIAL NOTICE - INDUSTRY DAY/PROJECT PRESENTATION - National Mall and Memorial Active
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile
DEPT OF DEFENSE
Due by 9/16/2026