Y--Cottonwood Substation Construction, Stage 02, Phase 01
| Agency: | ENERGY, DEPARTMENT OF |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | May 12, 2026 |
| Due Date: | Jun 29, 2026 |
| Solicitation No: | 89503326BWA000019 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Presolicitation (Original)
- Original Published Date: May 12, 2026 09:53 am PDT
- Original Response Date: Jun 29, 2026 12:00 pm PDT
- Inactive Policy: 15 days after response date
- Original Inactive Date: Jul 14, 2026
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
-
NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
Western Area Power Administration, Sierra Nevada Region has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Cottonwood Substation, Stage 02, Phase 01 located in Shasta County, CA.
The principal components of work include one (1) pre-fabricated control building foundation, site development for yard access, removal of existing wall to accommodate one (1) automatic 20-foot rolling gate, gate accessibility equipment including one (1) environmental enclosure and associated control cables, two (2) keypads and one (1) gate motor operator, station service arrangement and associated foundations including one (1) AC distribution panel, one (1) automatic transfer switch and two (2) fusible safety disconnect switches, two (2) precast pull boxes, and concrete encased duct banks.
The estimated construction magnitude of this project is between $500,000 and $1,000,000. All work is to be completed within 180 days from receipt of Notice to Proceed. The solicitation will be issued as a 100% Small Business Set-aside. The applicable NAICS Code is 237130 with an SBA Size Standard of $45.0M. The solicitation including specifications and drawings will be issued electronically on or about 29 May 2026 to the following sites: https://www.fedconnect.net and https://www.sam.gov.
This will be a Sealed Bidding Solicitation, all responses to this Invitation For Bid (IFB) shall be submitted via FedConnect ONLY. Emailed bids WILL NOT be accepted.
Note: The Buy American Act applies to the solicitation. Refer to RFO FAR Clause 52.225-9 and RFO FAR Provision 52.225-10 if any non-domestic material is proposed. Bidders must identify any non-domestic materials included in their bid. Please verify with suppliers and subcontractors whether their quotes will include non-domestic material.
- 114 PARKSHORE DRIVE
- FOLSOM , CA 95630
- USA
- Daoud, Jolene
- Daoud@wapa.gov
- Phone Number (916) 353-4469
- May 12, 2026 09:53 am PDTPresolicitation (Original)
Related Document
| Jun 2, 2026 | [Solicitation (Original)] Cottonwood Substation Construction, Stage 02, Phas |
| Jun 18, 2026 | [Solicitation (Updated)] Y--Cottonwood Substation Construction, Stage 02, Phas |
| Jul 27, 2026 | [Award Notice (Original)] Y--Cottonwood Substation Construction, Stage 02, Phas |
See Also
Follow Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead, No. 6-2025
DEPT OF DEFENSE
Due by 3/18/2028
Follow Beach Parking Lot Rehabilitation, Surry Mountain Lake, Surry, NH Active Contract Opportunity
DEPT OF DEFENSE
Follow Y--SPECIAL NOTICE - INDUSTRY DAY/PROJECT PRESENTATION - National Mall and Memorial Active
INTERIOR, DEPARTMENT OF THE
Due by 9/16/2026
Follow Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile
DEPT OF DEFENSE
Due by 9/16/2026