Y--Construction of Power Line
| Agency: | INTERIOR, DEPARTMENT OF THE |
|---|---|
| State: | Federal |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Posted Date: | Oct 3, 2024 |
| Due Date: | Nov 4, 2024 |
| Solicitation No: | 140R3025R0001 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- Original Published Date: Oct 02, 2024 03:27 pm PDT
- Original Response Date: Nov 04, 2024 01:00 pm PST
- Inactive Policy: 15 days after response date
- Original Inactive Date: Nov 19, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1NZ - CONSTRUCTION OF OTHER UTILITIES
-
NAICS Code:
- 237130 - Power and Communication Line and Related Structures Construction
-
Place of Performance:
Proposed Project:
The Bureau of Reclamation (Reclamation), Lower Colorado Region has a for the requirement for electrical service to power several pump motors and other ancillary services at the Firebreak Canal and Beal Lake. The United States Fish and Wildlife Service (USFWS) and Bureau of Reclamation (USBR) are working to implement several projects at Topock Marsh. The USFWS will seek to transfer its maintenance yard and groundwater pump, which is currently serviced by Cal Edison, to the Mohave Electrical Cooperative (MEC). All components of this project are within the service area of the MEC. The following document outlines the project components and proposes a conceptual above ground power alignment for MEC to begin evaluating this line extension. The proposed power alignment is approximately 10.5 miles of poles (government will furnish 150 utility poles) and power line for the extension.
Projects
The following details the primary electrical requirements for the three projects. Each project will require a separate service for billing purposes. Ancillary services may be required, more details can be gathered and provided.
1. USFWS/USBR Pump Station at Firebreak
Components
-Two 75HP-100HP Motors (used January-March and intermittently throughout summer)
-Scada and monitoring equipment
-High Priority
2. USBR Pump Stands at Beal Lake
Components
-Two 115HP Motors
-Scada and monitoring equipment
-Construction tentatively scheduled for 2025
-High Priority
3. USFWS Maintenance Yard/Building and Ground Water Pump
Components
-Maintenance shop (uses less than 700 KW per month)
-75HP groundwater pump (used approx. 1 week per year)
-1 HP Domestic well
Proposed Power Line Extension Alignment
The attached map depicts a proposed alignment for the power line extension. This alignment is conceptual and subject to change based on feedback and requirements from MEC. Nearly all 10.5 miles of the extension is on USFWS refuge lands. USFWS and USBR will work with MEC to assist in ensuring all necessary rights-of-way and easements are granted.
The applicable North American Industry Classification System (NAICS) Code 237130, Power and Communication Line and Related Structures Construction with a corresponding small business size standard of $45M.
Interested firms are requested to submit the following information:
1. Name and address of Firm
2. Phone number
3. Email Address
4. DUNS Number
5. Size status/SBA certifications (Small business, Women Owned Small Business, HUBZone, Service-Disabled Veteran Owned Small Business, other)
6. Capability Statement (not to exceed 10 pages). A brief summary of capabilities to include demonstration of the firm's capability to perform the work. Previous procurements performed of similar size and complexity to include references with point of contact information.
All responses must be submitted via email no later than 2:00 P.M., Pacific Time, November 4, 2024. Email address: DLRodriguez@usbr.gov. Include the reference number (140R3024R0001) in the subject line. All questions concerning the sources sought announcement should be directed to Diane Rodriguez by email at DLRodriguez@usbr.gov. No phone calls please.
When it is determined that a formal solicitation will be issued, the pre-solicitation notice will be posted on Contract Opportunities at sam.gov web site at http://sam.gov/.
- 500 DATE STREET BUILDING 200
- BOULDER CITY , NV 89005
- USA
- Rodriguez, Diane
- DLRodriguez@usbr.gov
- Phone Number 7022938368
- Fax Number 702293
- Oct 02, 2024 03:27 pm PDTSources Sought (Original)
Related Document
| Nov 25, 2024 | [Presolicitation (Original)] Y--Construction of Power Line |
| Jan 16, 2025 | [Solicitation (Updated)] Y--Construction of Power Line |
| Jan 28, 2025 | [Solicitation (Updated)] Y--Construction of Power Line |
See Also
Follow Y--Turnout Buildings Active Contract Opportunity Notice ID 140R4026B0002 Related Notice 140R4026B0002 Department/Ind.
INTERIOR, DEPARTMENT OF THE
Due by 11/10/2026
Follow Philpott Restroom Replacement Active Contract Opportunity Notice ID W912PM26QA041 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 10/09/2026
Follow Philpott Restroom Replacement Active Contract Opportunity Notice ID W912PM26QA041 Related Notice Department/Ind.
DEPT OF DEFENSE
Due by 10/09/2026
Follow Y--BRCA 318695 - CONSTRUCTION Active Contract Opportunity Notice ID 140P2026B0004 Related Notice
INTERIOR, DEPARTMENT OF THE
Due by 10/08/2026