2025 WWTF Improvements - Tonganoxie, KS
| Agency: | Drexel Technologies |
|---|---|
| State: | Missouri |
| Type of Government: | State & Local |
| Posted Date: | Aug 14, 2025 |
| Due Date: | Sep 9, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Bid Date | 9/9/25 2:00pm |
Tonganoxie, KS
Date Issued: 8/13/25
City of Tonganoxie (Owner) is requesting Bids for the construction of the following Project:
2025 WWTF Improvements
23-1106M (KDHE No. C20 3067 01)
Bids for the construction of the Project will be received at the City Hall located at 526 E 4th Street, Tonganoxie, KS 66086, until the above time. At that time the Bids received will be publicly opened and read.
The Project includes the following Work:
- Install 2 new influent pumps
- Install 1 new influent screen with 1 new washer / compactor
- Construct a second aerobic treatment basin, CIP
- Install new diffused aeration system within the existing aerobic digester
- Construct blower pad and install two blowers with piping
- Remove and replace Waste Activated Sludge (WAS) pump
- Install launder covers in the two existing final clarifiers with clarifier mechanism repaint as alternate
- Headworks building improvements – HVAC & Soffit
- Associated site, piping and electrical improvements to accommodate new infrastructure
Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows:
Thaniel Monaco
Project Manager
See Also
Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY
DEPT OF DEFENSE
Due by 11/16/2026
Request for Bids: Brickline Greenway: North Connector Phase 3, Spring Ave between Washington
Great Rivers Greenway
Due by 9/24/2026
District KC Posting Date: 8/26/26 Expiration Date: 9/16/26 Description: JKU0114 & JKU0503 -
Missouri Department of Transportation(MDOT)
Due by 9/16/2026
Follow LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY
DEPT OF DEFENSE
Due by 11/16/2026