| Agency: | City of Albany |
|---|---|
| State: | Oregon |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Jun 29, 2026 |
| Due Date: | Jul 21, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
WTP-26-01 Membrane Header Pipe Repair ACTIVE
See also: City of Albany Standard Construction Specifications
Nolan Nelson, 541-791-0130
This page does not track who downloads the RFP documents so you will need to contact the City of Albany as an interested proposer or periodically check this page in order to receive any available addenda or clarifications.
To be added to the plan holders list for this project, email pw.quotes@albanyoregon.gov .
Appendix A
Division 1
General
1.10 GENERAL
Sections in these specifications titled "Common Work for . . ." shall apply to all following
subsections whether directly referenced or not.
Sections in these specifications titled "Related Sections" shall be read as integral to the
specification as if they were fully detailed within. All work and materials described in such
sections shall be provided and performed by the Contractor.
1.10.16 Definitions
Approximate: Generally as shown or described, but has not been verified, or may require
adjustment. No level of accuracy is implied or should be assumed.
Calculation(s): When the contract documents require the Contractor to provide calculations,
those calculations must be prepared and stamped by a Professional Engineer licensed to
practice in the State where the project is constructed or where components requiring
calculations are fabricated.
Construction Limits: The area within which the Contractor is allowed to perform their
activities. If not specifically labeled as such on the plans, the Construction Limits are the
Owner's property, Owner's easements, or permitted public right of way upon which the
project facilities are to be constructed.
Diameter: The nominal diameter classification common for the type of material and purpose.
Should not be assumed to represent the actual measured inside nor outside diameter unless
specifically identified as such.
Engineer: When used in the context of project design or oversight it means the design
engineer (RH2 Engineering) or the Owner's staff engineer. When used in the context of an
engineer employed by the Contractor or an engineer required by a specification it means a
person licensed as a Professional Engineer in the State in which this project is constructed, or
for a product or system the state where it is fabricated/assembled.
Or Equal (Or Approved Equal): An alternate product, assembly, or method that the
Owner's Representative has reviewed based on information provided by the Contractor and
determined to provide functional equivalence, or better, than that specified. Such
determination does not relieve the Contractor from responsibility should the product,
assembly, or method fail to perform as needed.
Owner's Representative: Person(s) authorized by the Owner to observe the work, administer
the contract, approve tests, make decisions, and otherwise act as an agent of the Owner. The
terms Engineer, Owner's Observer, Owner's Inspector, and Owner are generally
interchangeable with the term Owner's Representative.
Proposed: The word refers to work that is part of the Contract, to be performed by the
Contractor. The word "proposed" does not need to show up to indicate work by the
Contractor. Unless work is specifically noted to be performed by others, all work is to be
performed by the Contractor.
1-1
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
Appendix A
City of Albany Spring 2026
Albany/Millersburg Water Treatment Plant
Membrane System Header Replacements Division 1
Provide: When used in context of the Owner "providing" items (such as materials, water,
equipment, etc.), "provide" means that the items are available, but it is the Contractor's
responsibility to pick up, haul, off-load, secure, manage, install, test, make provisions for, and
perform all work necessary that is not specifically noted as being performed by the Owner.
When used in context of the Contractor "providing" items, it means all materials and work
necessary unless stated otherwise.
The following location designations shall be used except where otherwise noted on the plans:
Dry Locations: Indoor continually dry areas including office, laboratory, blower, and
electrical rooms.
Wet Locations: All locations exposed to the weather, whether under a roof or not, or within
channels, basins or tanks.
Damp Locations: Process areas; areas containing pumps, valves, and major piping; all spaces
wholly or partially underground, or having a wall or ceiling forming part of a channel or tank,
unless otherwise designated on the Plans. Any areas which do not fall within the definitions
for dry, wet, or corrosive shall be considered damp.
Corrosive Locations: Areas where chlorine gas under pressure, sulfuric acid, or liquid
polymer are stored or processed, sewer wetwells and sewer manholes.
Immersed or Submerged Locations: Areas which are periodically, or continuously
submerged in, or contain a liquid.
1.11.00 Summary of Work
The Albany/Millersburg Water Treatment Plant (WTP) Membrane System Header Placement
project consists of the removal, transport, modification, and reinstallation of four 12-inch
diameter stainless steel header pipes. The work will include, but is not limited to, removal,
transportation, cutting, fabrication, and welding of stainless steel pipe, fittings, supports, and
flanges. Both shop and field work is expected as well as the transportation of the stainless steel
header pipes.
1.11.02 Provision and Reuse of Documents
The Owner will provide the following to the Contractor at no charge. Additional hard copies
can be provided at the Contractor's request at cost of production to be paid by the Contractor.
* Electronic (PDF) of contract, specifications, and plans.
Contractor and any Subcontractor or Supplier shall not:
1. Have or acquire any title to or ownership rights in any of the Drawings, Specifications, or
other documents (or copies of any thereof) prepared by or bearing the seal of Engineer or
its consultants, including electronic media editions; or
2. Reuse any such Drawings, Specifications, other documents, or copies thereof on
extensions of the Project or any other project without written consent of Owner and
Engineer and specific written verification or adaptation by Engineer.
1-2
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
Appendix A
City of Albany Spring 2026
Albany/Millersburg Water Treatment Plant
Membrane System Header Replacements Division 1
3. The prohibitions of this Paragraph will survive final payment, or termination of the
Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract
Documents for record purposes.
1.11.03 Electronic Data
1. Unless otherwise stated in supplementary conditions, the data furnished by Owner to
Contractor, or by Contractor to Owner, that may be relied upon are limited to the printed
copies (also known as hard copies) and/or electronic (PDF) if that is how the formal files
were distributed for bidding or changes. Supporting files in electronic media format of
text, data, graphics, or other types when furnished are only for the convenience of the
receiving party. Any conclusion or information obtained or derived from supporting files
will be at the user's sole risk. If there is a discrepancy between supporting files and the
documents (physical or PDF) distributed for bidding or changes, the latter governs.
2. Because data stored in electronic media format can deteriorate or be modified
inadvertently or otherwise without authorization of the data's creator, the party receiving
electronic files agrees that it will perform acceptance tests or procedures within 30 days,
after which the receiving party shall be deemed to have accepted the data thus transferred.
Any errors detected within the 30-day acceptance period will be corrected by the
transferring party.
3. When transferring documents in electronic media format, the transferring party makes no
representations as to long term compatibility, usability, or readability of documents
resulting from the use of software application packages, operating systems, or computer
hardware differing from those used by the data's creator.
4. Computer Aided Design (CAD) files will not be made available to the Contractor. This
includes AutoCAD(TM), Civil3D(TM), or other similar file types. Only printed hard copies or
electronic representations of hard copies (e.g. PDF) will be provided.
1.13 Permits and Licenses
The Contractor shall acquire and pay all necessary permits.
1.14 Work Restrictions
1.14.19 Use of Site
The Contractor shall not perform work activities, store materials or equipment, move
equipment through, or disturb in any way the areas outside the Construction Limits as
designated by the Owner.
The Contractor shall maintain access for the Owner to all parts of the WTP at all times.
1-3
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
Appendix A
City of Albany Spring 2026
Albany/Millersburg Water Treatment Plant
Membrane System Header Replacements Division 1
1.20 PRICE AND PAYMENT PROCEDURES
1.21.55 Cost Increases for Materials
There will be no allowance for additional payment should the cost of any materials go up
during the original contract timeframe. The Contractor is responsible for securing prices at
the time of bid.
1.25.00 Substitution Procedures
Any product or construction method that, in the opinion of the Owner, does not meet these
specifications will be considered a substitution. Substitutions must be approved prior to
incorporation into the project. The Owner has the right to reject any request for substitution.
Incomplete requests will not be reviewed.
Requests shall include an explanation of why the request is being made along with drawings,
details, specifications, and samples sufficient to allow the Owner to evaluate the proposed
substitute. Requests shall include any change necessary in construction methods with a detailed
description and related drawings of the proposed methods. Provide an itemized comparison
of each proposed substitution with the specified product or method. If the Contractor believes
there are no variations from the bid documents, include a statement to that fact in the request
for substitution.
In making a request for a substitution, the Contractor represents that they have investigated
the proposed product or method and has determined that it provides equal or superior form
and function to the product specified. The Contractor shall coordinate incorporation of
accepted substitutions into the work, making changes that may be required for the work to be
completed.
The Contractor waives all claims for additional costs and time related to substitutions. The
Owner reserves the right to charge the Contractor for the Owner's time required for
incorporating the substitution into the work which may include but not be limited to
observation, requests for information, and commissioning.
No guarantee is made that product model numbers included in the specifications or on the
plans are current at the time of bidding. The bidder shall provide pricing in their proposal for
current versions of discontinued models. If the bidder is uncertain of the correct replacement
model, or feels there is a price discrepancy, the bidder shall request a substitution following
the requirements of section 1.25.13.10 Substitutions Prior to Bid Opening. Requests for price
increases after award will not be accepted.
1.25.13.10 Substitutions Prior to Bid Opening
Before opening bids, the Owner may consider written requests from product suppliers or
prime bidders for substitutions. All requests for substitution must be received by Owner a
minimum of 5 working days prior to bid opening. Approval of substitutions will be only by
addendum. The bidder shall include in their proposal all costs for any modifications required
to adopt the substitute.
1-4
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
Appendix A
City of Albany Spring 2026
Albany/Millersburg Water Treatment Plant
Membrane System Header Replacements Division 1
1.25.13.15 Substitutions After Contract Execution
After contract execution, the Owner will consider requests for a substitution of products or
methods in place of those specified. Submit electronically, or two hard copies of each request
for a substitution. Submit requests early enough for the Owner to review the request without
affecting the schedule. The Owner will review with reasonable promptness and will provide a
response within 10 working days after receipt of all information required for the review, unless
the complexity of the proposed substitution requires, in the Owner's sole opinion, additional
review time.
If the Owner approves a request for substitution, and the Contractor subsequently requests
an alternate substitution for the same or similar work, the Owner reserves the right to charge
the Contractor for the costs required to review the alternate substitution.
1.30 ADMINISTRATIVE
1.31 Project Management and Coordination
1.31.01 Contractor's Responsibility
The work included in this contract is shown on the contract plans and described in these
project specifications. All work incidental and necessary to the completion of the work
described and shown shall be performed by the Contractor. In submitting a bid for this project,
the Bidder warrants that they are an expert in this and related work, that they understand the
process and functions shown, and that various work and processes not shown but necessary
for the successful operation of this project will be provided by the Contractor.
The General (or Prime) Contractor is fully responsible for providing the subcontractors and
suppliers with all relevant portions of the plans and specifications necessary to bid and
construct the improvements.
Damage to existing utilities or property shall be repaired or replaced by the Contractor at the
discretion of the Owner.
The Contractor and each of the Subcontractors are responsible for coordinating the required
inspections. There are specific requirements for inspection responsibilities and the advance
notice that must be given to minimize construction delays. It is the Contractor's responsibility
to be familiar with these requirements, include the coordination necessary in this estimate of
project costs and schedule, and to comply with the requirements during construction. Failure
to follow proper inspection and notification procedures may result in on-site work stoppages
and removal or demolition of unapproved structures or systems, all at the Contractor's
expense. See Starting and Adjusting section for details.
Do not start work on this project or on any public or private right-of-way or easement until
clearance is given by the Owner. It will be the responsibility of the Contractor to comply with
the requirements of any permit for the project. Do not hinder private property access without
a 24-hour notice to the private property owner, and do not hinder access for more than an
8-hour period. Do not disrupt emergency aid access to private property.
1-5
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
Appendix A
City of Albany Spring 2026
Albany/Millersburg Water Treatment Plant
Membrane System Header Replacements Division 1
The Contractor is solely responsible for all elements of site safety. Inspections performed by
the Owner are only to monitor and record that project plans and specifications are being
complied with and construction is consistent with the design intent.
The Contractor is responsible for managing, coordinating, and overseeing its subcontractors,
suppliers, manufacturers' representatives, or any other persons performing Work. The
Contractor shall designate and have a competent person, familiar with the project and work
being performed, on site at all times when work is being performed..
1.31.19 Progress Meetings
The Contractor shall schedule and hold regular progress meetings as requested by the Owner
or as required by progress of the work. The Contractor, Owner, and all Subcontractors active
on the site must attend each meeting.
Contractor to provide an agenda covering the following items at a minimum, as applicable.
1. Review minutes of previous meetings.
2. Review of work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede planned schedule.
5. Review of submittals schedule and status of submittals.
6. Review of off-site fabrication and delivery schedules.
7. Maintenance of progress schedule.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Coordination of projected progress.
11. Discussion of upcoming required inspections/approvals.
12. Maintenance of quality and work standards.
13. Effect of proposed changes on progress schedule and coordination.
14. Safety issues relating to work.
15. Other business relating to work.
1.32.13 Scheduling of Work
The Proposal describes the times for Substantial Completion and Physical Completion. Refer
also to the Instructions (or Information) to Bidders.
Where the plans or specifications mention notification periods in hours or days, these time
periods are assumed to be working days unless specifically stated otherwise. For example, a
requirement of 48-hours notification for work desired to be performed at 1:00 pm Monday
requires notification be provided no later than 1:00 pm the preceding Thursday.
1-6
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
Appendix A
City of Albany Spring 2026
Albany/Millersburg Water Treatment Plant
Membrane System Header Replacements Division 1
1.32.16 Construction Progress Schedule
Contractor is responsible for providing an up to date construction schedule with each monthly
pay estimate and at other times as requested by the Owner or as required by progress of the
work. If the current schedule is still in-line with the previous schedule, the Contractor shall
inform the Owner with each pay estimate. Non-working day requests shall also be submitted
by the Contractor with each monthly pay estimate. Owner may delay monthly progress
payments if Contractor fails to submit updated schedule and non-working day requests.
1.32.29 Periodic Work Observation
The Owner may elect to have an observer on site to monitor, observe and record construction
progress. The Contractor maintains complete responsibility to verify construction is meeting
the design intent and is being constructed in accordance with the plans and specifications. It
is not the responsibility of the Owner's observer to address neither means and methods issues
nor direct safety issues. The Owner's observer does not have the authority to stop work if
unsafe conditions are observed.
1.33 Submittals
1.33.23 Shop Drawings, Product Data, and Samples
Submittals are required for all items installed on this contract. Address submittals to:
RH2 Engineering, Inc.
2 Centerpointe Dr #325
Lake Oswego, OR 97035
Attn: Tyler Duncan
Email: tduncan@rh2.com
Submittals may be provided in electronic format (preferred) or hard copy. Owner reserves the
right to require the Contractor to provide hard-copy submittals at no additional cost to the
Owner. When hard-copy submittals are provided, submit three (3) copies; one set will be
returned to the Contractor after review.
Electronic submittal via email is preferred, and the Contractor shall follow up with the Owner
to verify that the submittal was received. The Owner assumes no responsibility for emails that
do not make it to the recipient. In the case of electronic submittals, only one copy will be
returned to the Contractor, either electronically or hard copy at the Owner's discretion.
Submittal data shall contain sufficient information on each item to determine if it complies
with the contract requirements. Submittal cutsheets and datasheets shall be annotated by the
Contractor to clearly indicate the equipment and materials that will be provided, including any
options or additive items. No generic cutsheets or datasheets will be accepted.
Items installed in the work that have not been approved through the submittal process shall
be removed and an approved product shall be furnished, all at the Contractor's expense.
Shop drawing review will be limited to general design requirements only and shall not relieve
the Contractor from responsibility for errors or omissions, or responsibility for consequences
1-7
J:\Data\ALB\25-0217\30 Specs\Technicals\1 General2.docx 4/21/26 9:47 AM
(C) 2026 RH2 Engineering, Inc.
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
WTP-26-01 Membrane Header Pipe Repair ACTIVE It is imperative to follow the procedures
City of Albany
Bid Due: 7/28/2026
WTP-26-01 Membrane Header Pipe Repair ACTIVE It is imperative to follow the procedures
City of Albany
Bid Due: 7/28/2026
INVITATION FOR BIDS FOR WORK ORDER 395 WALKING WOODS DRIVE - NEW STORM
City of Lake Oswego
Bid Due: 8/13/2026
Walking Woods Drive - New Storm System Pipe and Connections Summary INVITATION FOR
City of Lake Oswego
Bid Due: 8/13/2026