WSU Project Numbers - 040-340775 RFP - Ceramics Lab Dust Collector - 2026 Addendum #3
| Agency: | Wayne State University |
|---|---|
| State: | Michigan |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Sep 7, 2026 |
| Due Date: | Sep 9, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
| Release Date | Title | Mandatory Pre-Bid? | Pre-Bid Date | Contact | Due Date |
| 08-18-2026 |
WSU Project
Numbers - 040-340775 RFP - Ceramics Lab Dust Collector - 2026 Complete RFP Information Detailed Drawings Detailed?Specifications Appendix?A - Prevailing wage Rates WHD 9917 General Information Regarding Fringe Benefits 2-2024 WHD 9918?Prevailing Wages Requirements on State Projects 2-2024 Official Rate Schedule Issued 11-01-2025 Power Point Presentation Addendum #1 - Minutes of the Pre-Bid Meeting held 08-25-2026 Prebid Meeting Sign-In Sheet - posted 08-25-2026 Addendum #2 - posted 08-28-2026 Second Site Visit Addendum #3 - posted 09-07-2026 Ceramics Lab Dust Collector - Link to Submit Bids |
Mandatory
in person |
08-25-2026
10:30 am |
Brittney Mills
(313) 577-3757 brittney.mills2@wayne.edu |
09-09-2026 |
Attachment Preview
SPECIFICATIONS
WAYNE STATE UNIVERSITY (WSU)
ART BUILDING 040
CERAMICS LAB - DUST COLLECTOR
________________________________________________
DETROIT, MICHIGAN
WSU Project No. 040-340775
DSD Project No. 25-0201
BID and Permit
July 27, 2026
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
013300 SUBMITTAL PROCEDURES ................................................................................................ 013300-1 - 9
013516 ALTERATION PROJECT PROCEDURES ........................................................................... 013516-1 - 7
014000 QUALITY REQUIREMENTS ............................................................................................... 014000-1 - 11
014200 REFERENCES ...................................................................................................................... 014200-1 - 8
016000 PRODUCT REQUIREMENTS .............................................................................................. 016000-1 - 6
017300 EXECUTION ....................................................................................................................... 017300-1 - 10
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL ............................................. 017419-1 - 7
017700 CLOSEOUT PROCEDURES ................................................................................................ 017700-1 - 6
017823 OPERATION AND MAINTENANCE DATA .......................................................................... 017823-1 - 8
017839 PROJECT RECORD DOCUMENTS .................................................................................... 017839-1 - 3
017900 DEMONSTRATION AND TRAINING .................................................................................... 017900-1 - 6
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION ................................................................................................... 024119-1 - 8
DIVISION 21 - FIRE PROTECTION
211313 WET-PIPE SPRINKLER SYSTEMS ..................................................................................... 211313-1 - 8
DIVISION 22 - PLUMBING ....................................................................................................................................
220500 COMMON WORK RESULTS FOR PLUMBING ................................................................... 220500-1 - 9
226113 COMPRESSED-AIR PIPING FOR LABORATORY FACILITIES ......................................... 226113-1 - 7
DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING ..................................................................
230500 COMMON WORK RESULTS FOR HVAC .......................................................................... 230500-1 - 10
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT ....................................... 230513-1 - 2
230593 TESTING, ADJUSTING AND BALANCING FOR HVAC .................................................... 230593-1 - 15
230800 COMISSIONING OF HVAC .................................................................................................. 230800-1 - 7
233113 METAL DUCTS ................................................................................................................... 233113-1 - 13
233300 AIR DUCT ACCESSORIES .................................................................................................. 233300-1 - 6
233513 DUST COLLECTION SYSTEM ............................................................................................. 233513-1 - 3
234100 PARTICULATE AIR FILTRATION ........................................................................................ 234100-1 - 5
DIVISON 26 - ELECTRICAL
On Drawings
END OF TABLE OF CONTENTS
DSD PROJECT NO. 26-4802
Julyy 16, 2026
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Submittal schedule requirements.
2. Administrative and procedural requirements for submittals.
B. Related Requirements:
1. Section 012900 "Payment Procedures" for submitting Applications for Payment and the
schedule of values.
2. Section 013100 "Project Management and Coordination" for submitting coordination
drawings and subcontract list and for requirements for web-based Project software.
3. Section 013200 "Construction Progress Documentation" for submitting schedules and
reports, including Contractor's construction schedule.
4. Section 013233 "Photographic Documentation" for submitting preconstruction
photographs, periodic construction photographs, and final completion construction
photographs.
5. Section 014000 "Quality Requirements" for submitting test and inspection reports, and
schedule of tests and inspections.
6. Section 017700 "Closeout Procedures" for submitting closeout submittals and
maintenance material submittals.
7. Section 017823 "Operation and Maintenance Data" for submitting operation and
maintenance manuals.
8. Section 017839 "Project Record Documents" for submitting record Drawings, record
Specifications, and record Product Data.
9. Section 017900 "Demonstration and Training" for submitting video recordings of
demonstration of equipment and training of Owner's personnel.
1.3 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require Architect's
responsive action. Action submittals are those submittals indicated in individual Specification
Sections as "action submittals."
B. Informational Submittals: Written and graphic information and physical samples that do not
require Architect's responsive action. Submittals may be rejected for not complying with
SUBMITTAL PROCEDURES 013300 - 1
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
requirements. Informational submittals are those submittals indicated in individual Specification
Sections as "informational submittals."
1.4 SUBMITTAL SCHEDULE
A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in
chronological order by dates required by construction schedule. Include time required for
review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include
additional time required for making corrections or revisions to submittals noted by Architect and
additional time for handling and reviewing submittals required by those corrections.
1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and
Contractor's construction schedule.
2. Initial Submittal: Submit concurrently with construction schedule (Gantt-Chart Schedule).
Include submittals required during the entire construction duration. List those submittals
required to maintain orderly progress of the Work and those required early because of
long lead time for manufacture or fabrication.
3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's
construction schedule.
a. Submit revised submittal schedule to reflect changes in current status and timing
for submittals.
4. Format: Arrange the following information in a tabular format:
a. Scheduled date for first submittal.
b. Specification Section number and title.
c. Submittal Category: Action; informational.
d. Name of subcontractor.
e. Description of the Work covered.
f. Scheduled date for Architect's final release or approval.
g. Scheduled dates for purchasing.
h. Scheduled date of fabrication.
i. Scheduled dates for installation.
j. Activity or event number.
1.5 SUBMITTAL FORMATS
A. Submittal Information: Include the following information in each submittal:
1. Project name.
2. Date.
3. Name of Architect.
4. Name of Contractor.
5. Name of firm or entity that prepared submittal.
6. Names of subcontractor, manufacturer, and supplier.
7. Unique submittal number, including revision identifier. Include Specification Section
number with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals.
8. Category and type of submittal.
9. Submittal purpose and description.
SUBMITTAL PROCEDURES 013300 - 2
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
10. Number and title of Specification Section, with paragraph number and generic name for
each of multiple items.
11. Other necessary identification.
12. Remarks.
13. Signature of transmitter.
B. Options: Identify options requiring selection by Architect.
C. Deviations and Additional Information: On each submittal, clearly indicate deviations from
requirements in the Contract Documents, including minor variations and limitations; include
relevant additional information and revisions, other than those requested by Architect on
previous submittals. Indicate by highlighting on each submittal or noting on attached separate
sheet.
D. Samples:
1. Place a permanent label or title block on each submittal item for identification; include
name of firm or entity that prepared submittal.
2. Provide a space approximately 6 by 8 inches on label or beside title block to record
Contractor's review and approval markings.
3. Transmittal for Submittals: Assemble each submittal individually and appropriately for
transmittal and handling. Transmit each submittal using a transmittal form acceptable to
Owner and Architect
E. PDF Submittals: Prepare submittals as PDF package, incorporating complete information into
each PDF file. Name PDF file with submittal number.
1. Place a permanent label or title block on each submittal item for identification; include
name of firm or entity that prepared submittal.
2. Provide a space approximately 6 by 8 inches on label or beside title block to record
Contractor's review and approval markings.
3. Transmittal for Submittals: Assemble each submittal individually and appropriately for
transmittal and handling. Transmit each submittal using a transmittal form acceptable to
Owner and Architect
1.6 SUBMITTAL PROCEDURES
A. Prepare and submit submittals required by individual Specification Sections. Types of submittals
are indicated in individual Specification Sections.
1. Email: Prepare submittals as PDF package, and transmit to Architect by sending via
email. Include PDF transmittal form. Include information in email subject line as
requested by Architect.
a. Architect will return annotated file. Annotate and retain one copy of file as a digital
Project Record Document file.
B. Coordination: Coordinate preparation and processing of submittals with performance of
construction activities.
SUBMITTAL PROCEDURES 013300 - 3
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals,
and related activities that require sequential activity.
2. Submit all submittal items required for each Specification Section concurrently unless
partial submittals for portions of the Work are indicated on approved submittal schedule.
3. Submit action submittals and informational submittals required by the same Specification
Section as separate packages under separate transmittals.
4. Coordinate transmittal of submittals for related parts of the Work specified in different
Sections so processing will not be delayed because of need to review submittals
concurrently for coordination.
a. Architect reserves the right to withhold action on a submittal requiring coordination
with other submittals until related submittals are received.
C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.
Time for review shall commence on Architect's receipt of submittal. No extension of the
Contract Time will be authorized because of failure to transmit submittals enough in advance of
the Work to permit processing, including resubmittals.
1. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if
coordination with subsequent submittals is required. Architect will advise Contractor when
a submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner
as initial submittal.
3. Resubmittal Review: Allow 10 days for review of each resubmittal.
4. Sequential Review: Where sequential review of submittals by Architect's consultants,
Owner, or other parties is indicated, allow 15 days for initial review of each submittal.
a. Concrete.
b. Masonry
c. Hydraulic elevator.
5. Concurrent Consultant Review: Where the Contract Documents indicate that submittals
may be transmitted simultaneously to Architect and to Architect's consultants, allow 15
days for review of each submittal. Submittal will be returned to Architect before being
returned to Contractor.
D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of
revision.
3. Resubmit submittals until they are marked with approval notation from Architect's action
stamp.
E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers,
fabricators, installers, authorities having jurisdiction, and others as necessary for performance of
construction activities. Show distribution on transmittal forms.
F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action
submittals that are marked with approval notation from Architect's action stamp.
SUBMITTAL PROCEDURES 013300 - 4
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
1.7 SUBMITTAL REQUIREMENTS
A. Product Data: Collect information into a single submittal for each element of construction and
type of product or equipment.
1. If information must be specially prepared for submittal because standard published data
are unsuitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's catalog cuts.
b. Manufacturer's product specifications.
c. Standard color charts.
d. Statement of compliance with specified referenced standards.
e. Testing by recognized testing agency.
f. Application of testing agency labels and seals.
g. Notation of coordination requirements.
h. Availability and delivery time information.
4. For equipment, include the following in addition to the above, as applicable:
a. Wiring diagrams that show factory-installed wiring.
b. Printed performance curves.
c. Operational range diagrams.
d. Clearances required to other construction, if not indicated on accompanying Shop
Drawings.
5. Submit Product Data before Shop Drawings, and before or concurrent with Samples.
B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base
Shop Drawings on reproductions of the Contract Documents or standard printed data unless
submittal based on Architect's digital data drawing files is otherwise permitted.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the
following information, as applicable:
a. Identification of products.
b. Schedules.
c. Compliance with specified standards.
d. Notation of coordination requirements.
e. Notation of dimensions established by field measurement.
f. Relationship and attachment to adjoining construction clearly indicated.
g. Seal and signature of professional engineer if specified.
2. Sheet Size: Except for templates, patterns, and similar full-size Drawings, submit Shop
Drawings on sheets at least 8-1/2 by 11 inches, but no larger than 30 by 42 inches.
C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these
characteristics with other materials.
1. Transmit Samples that contain multiple, related components such as accessories
together in one submittal package.
SUBMITTAL PROCEDURES 013300 - 5
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
2. Identification: Permanently attach label on unexposed side of Samples that includes the
following:
a. Project name and submittal number.
b. Generic description of Sample.
c. Product name and name of manufacturer.
d. Sample source.
e. Number and title of applicable Specification Section.
f. Specification paragraph number and generic name of each item.
3. Email Transmittal: Provide PDF transmittal. Include digital image file illustrating Sample
characteristics, and identification information for record.
4. Paper Transmittal: Include paper transmittal including complete submittal information
indicated.
5. Disposition: Maintain sets of approved Samples at Project site, available for quality-
control comparisons throughout the course of construction activity. Sample sets may be
used to determine final acceptance of construction associated with each set.
a. Samples that may be incorporated into the Work are indicated in individual
Specification Sections. Such Samples must be in an undamaged condition at time
of use.
b. Samples not incorporated into the Work, or otherwise designated as Owner's
property, are the property of Contractor.
6. Samples for Verification: Submit full-size units or Samples of size indicated, prepared
from same material to be used for the Work, cured and finished in manner specified, and
physically identical with material or product proposed for use, and that show full range of
color and texture variations expected. Samples include, but are not limited to, the
following: partial sections of manufactured or fabricated components; small cuts or
containers of materials; complete units of repetitively used materials; swatches showing
color, texture, and pattern; color range sets; and components used for independent
testing and inspection.
a. Number of Samples: Submit three sets of Samples. Architect will retain one
Sample sets; remainder will be returned. Mark up and retain one returned Sample
set as a project record Sample.
1) Submit a single Sample where assembly details, workmanship, fabrication
techniques, connections, operation, and other similar characteristics are to
be demonstrated.
2) If variation in color, pattern, texture, or other characteristic is inherent in
material or product represented by a Sample, submit at least three sets of
paired units that show approximate limits of variations.
D. Product Schedule: As required in individual Specification Sections, prepare a written summary
indicating types of products required for the Work and their intended location. Include the
following information in tabular form:
1. Type of product. Include unique identifier for each product indicated in the Contract
Documents or assigned by Contractor if none is indicated.
2. Manufacturer and product name, and model number if applicable.
3. Number and name of room or space.
4. Location within room or space.
SUBMITTAL PROCEDURES 013300 - 6
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
E. Qualification Data: Prepare written information that demonstrates capabilities and experience of
firm or person. Include lists of completed projects with project names and addresses, contact
information of architects and owners, and other information specified.
F. Design Data: Prepare and submit written and graphic information indicating compliance with
indicated performance and design criteria in individual Specification Sections. Include list of
assumptions and summary of loads. Include load diagrams if applicable. Provide name and
version of software, if any, used for calculations. Number each page of submittal.
G. Certificates:
1. Certificates and Certifications Submittals: Submit a statement that includes signature of
entity responsible for preparing certification. Certificates and certifications shall be signed
by an officer or other individual authorized to sign documents on behalf of that entity.
Provide a notarized signature where indicated.
2. Installer Certificates: Submit written statements on manufacturer's letterhead certifying
that Installer complies with requirements in the Contract Documents and, where required,
is authorized by manufacturer for this specific Project.
3. Manufacturer Certificates: Submit written statements on manufacturer's letterhead
certifying that manufacturer complies with requirements in the Contract Documents.
Include evidence of manufacturing experience where required.
4. Material Certificates: Submit written statements on manufacturer's letterhead certifying
that material complies with requirements in the Contract Documents.
5. Product Certificates: Submit written statements on manufacturer's letterhead certifying
that product complies with requirements in the Contract Documents.
6. Welding Certificates: Prepare written certification that welding procedures and personnel
comply with requirements in the Contract Documents. Submit record of Welding
Procedure Specification and Procedure Qualification Record on AWS forms. Include
names of firms and personnel certified.
H. Test and Research Reports:
1. Compatibility Test Reports: Submit reports written by a qualified testing agency, on
testing agency's standard form, indicating and interpreting results of compatibility tests
performed before installation of product. Include written recommendations for primers
and substrate preparation needed for adhesion.
2. Field Test Reports: Submit written reports indicating and interpreting results of field tests
performed either during installation of product or after product is installed in its final
location, for compliance with requirements in the Contract Documents.
3. Material Test Reports: Submit reports written by a qualified testing agency, on testing
agency's standard form, indicating and interpreting test results of material for compliance
with requirements in the Contract Documents.
4. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on
testing agency's standard form, indicating and interpreting results of tests performed
before installation of product, for compliance with performance requirements in the
Contract Documents.
5. Product Test Reports: Submit written reports indicating that current product produced by
manufacturer complies with requirements in the Contract Documents. Base reports on
evaluation of tests performed by manufacturer and witnessed by a qualified testing
agency, or on comprehensive tests performed by a qualified testing agency.
6. Research Reports: Submit written evidence, from a model code organization acceptable
to authorities having jurisdiction, that product complies with building code in effect for
Project. Include the following information:
SUBMITTAL PROCEDURES 013300 - 7
WSU - ART BUILDING 040 BID AND PERMIT
CERMICS LAB DUST COLLECTOR
WSU PROJECT NO. 040-340775 July 27, 2026
DSD PROJECT NO. 25-4802
a. Name of evaluation organization.
b. Date of evaluation.
c. Time period when report is in effect.
d. Product and manufacturers' names.
e. Description of product.
f. Test procedures and results.
g. Limitations of use.
1.8 DELEGATED-DESIGN SERVICES
A. Performance and Design Criteria: Where professional design services or certifications by a
design professional are specifically required of Contractor by the Contract Documents, provide
products and systems complying with specific performance and design criteria indicated.
1. If criteria indicated are insufficient to perform services or certification required, submit a
written request for additional information to Architect.
B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other
required submittals, submit digitally signed PDF file copies of certificate, signed and sealed by
the responsible design professional, for each product and system specifically assigned to
Contractor to be designed or certified by a design professional.
1. Indicate that products and systems comply with performance and design criteria in the
Contract Documents. Include list of codes, loads, and other factors used in performing
these services.
1.9 CONTRACTOR'S REVIEW
A. Action Submittals and Informational Submittals: Review each submittal and check for
coordination with other Work of the Contract and for compliance with the Contract Documents.
Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.
B. Contractor's Approval: Indicate Contractor's approval for each submittal with a uniform approval
stamps. Include name of reviewer, date of Contractor's approval, and statement certifying that
submittal has been reviewed, checked, and approved for compliance with the Contract
Documents.
1. Architect will not review submittals received from Contractor that do not have Contractor's
review and approval.
1.10 ARCHITECT'S REVIEW
A. Action Submittals: Architect will review each submittal, indicate corrections or revisions
required, and return it.
1. PDF Submittals: Architect will indicate, via markup on each submittal, the appropriate
action.
SUBMITTAL PROCEDURES 013300 - 8
See Also
Forest Street Homes-River View Housing Development Opportunity RFP Documents CITY OF PORT HURON,
City of Port Huron
Due by 10/07/2026
General Information Document ID RFP-SPP-260000002583-1 Status Open Description 26-029 Springport High and Elem
State of Michigan
Due by 9/29/2026
Follow Construct Readiness Center Active Contract Opportunity Notice ID W912JB-24-B-0001 Related Notice W912JB-23-B-0001
Federal Agency
Due by 1/26/2027
Follow Construct Readiness Center Active Contract Opportunity Notice ID W912JB-24-B-0001 Related Notice W912JB-23-B-0001
Federal Agency
Due by 1/26/2027