WSU Project
Number - 595-420793 RFP - 400 Mack Elevator and Accessibility - 2026
Microsoft
On-line
Need
RFP Information Detailed Drawings Detailed Technical Specifications Appendix?A - Prevailing wage Rates WHD 9917 General Information Regarding Fringe Benefits 2-2024 WHD 9918?Prevailing Wages Requirements on State Projects 2-2024 Official Rate Schedule Issued 11-01-2025 Power Point Presentation (Not Yet Available) Prebid Attendance Confirmation (will open during prebid meeting) 400 Mack Elevator and Accessibility - Link to Submit Bids |
Mandatory |
05-07-2026
11:00 am |
Brittney Mills
(313) 577-3757 brittney.mills2@wayne.edu |
06-04-2026 |
27172 Woodward Avenue
Royal Oak, MI 48067-0925
Telephone: 248.546.6700 (EXT. 108)
Fax: 248.546.8454
E-mail: mblanek@stuckyvitale.com
ARCHITECTURE
INTERIOR DESIGN
PLANNING
PROJECT MANUAL
400 MACK AVE.ELEVATOR ADDITION MODERNIZATION
AND VESTIBULE ACCESSIBILITY
400 MACK AVENUE
DETROIT, MI 48201
SVA PROJECT NO.: 2024.041
ISSUE DATE
BIDS 04.21.26
SECTION 00 0050
CONSULTANT INFORMATION
Project: 400 Mack Elevator Addition & Vestibule Accessibility
400 Mack Avenue
Detroit, MI 48201
SVA Project Number: 2024.041
Architect: Stucky Vitale Architects
27172 Woodward Avenue
Royal Oak, MI 48067
(248) 546-6700
Mechanical/Electrical/Plumbing Engineer: MA Engineering
180 High Oak Street
Bloomfield Hills, MI 48304
(248) 358-1610
Structural Engineer SJW Engineering LLC
7325 Triangle Drive
Sterling Heights, MI 48314
(586) 341-6206
Elevator Consultant VDA
Detroit Michigan
(313) 725-4500 Ext 245
END OF SECTION
400 Mack Ave. Elevator Addition, Modernization 00 0050-1 CONSULTANT INFORMATION
And Vestibule Accessibility - Detroit, MI Bids 04.21.26
SVA Project #2024.041
SECTION 00 0100
TABLE OF CONTENTS
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
00 0050 CONSULTANT INFORMATION
00 0100 TABLE OF CONTENTS
00 0115 LIST OF DRAWING SHEETS
00 8100 ADDENDUM TO GENERAL CONDITIONS FOR THE CONTRACT FOR CONSTRUCTION
DIVISION 01 GENERAL REQUIREMENTS
01 3000 ADMINISTRATIVE REQUIREMENTS
01 4000 QUALITY REQUIREMENTS
01 5000 TEMPORARY FACILITIES AND CONTROLS
01 5813 TEMPORARY PROJECT SIGNAGE
01 6000 PRODUCT REQUIREMENTS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
01 7800 CLOSEOUT SUBMITTALS
01 7900 DEMONSTRATION AND TRAINING
DIVISION 02 EXISTING CONDITIONS
02 4100 DEMOLITION
DIVISION 03 CONCRETE
03 3000 CAST-IN-PLACE CONCRETE
DIVISION 04 MASONRY
04 0511 MASONRY MORTARING AND GROUTING
04 2000 UNIT MASONRY
DIVISION 05 METALS
05 4000 COLD-FORMED METAL FRAMING
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 1716 BENTONITE COMPOSITE SHEET WATERPROOFING
07 0553 FIRE AND SMOKE ASSEMBLY IDENTIFICATION
07 8400 FIRESTOPPING
07 9001 JOINT SEALERS
DIVISION 08 OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES
08 3100 ACCESS DOORS AND PANELS
08 7100 FINISH HARDWARE
400 Mack Ave. Elevator Addition, Modernization 00 0100-1 TABLE OF CONTENTS
And Vestibule Accessibility - Detroit, MI Bids 04.21.26
SVA Project #2024.041
DIVISION 09 FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES
09 5100 ACOUSTICAL CEILINGS
09 6813 TILE CARPETING
09 9123 INTERIOR PAINTING
DIVISION 10 SPECIALTIES
10 2600 WALL AND DOOR PROTECTION
DIVISION 14 CONVEYING EQUIPMENT
14 2400 HYDRAULIC ELEVATORS
DIVISION 22 PLUMBING
REFER TO PLUMBING DRAWINGS FOR SPECIFICATIONS
DIVISION 23 HVAC
REFER TO MECHANICAL DRAWINGS FOR SPECIFICATIONS
DIVISION 26 ELECTRICAL
REFER TO ELECTRICAL DRAWINGS FOR SPECIFICATIONS
END OF SECTION
400 Mack Ave. Elevator Addition, Modernization 00 0100-2 TABLE OF CONTENTS
And Vestibule Accessibility - Detroit, MI Bids 04.21.26
SVA Project #2024.041
SECTION 00 8100
ADDENDUM TO GENERAL CONDITIONS FOR THE CONTRACT FOR CONSTRUCTION
1.1.3 THE WORK
The Work comprises the completed construction required by the Contract Documents and includes all labor
necessary to produce such construction, and all materials and equipment incorporated or to be incorporated
or to be incorporated in such construction.
1.1.6 THE SPECIFICATIONS
The Specifications are that portion of the Contract Documents consisting of the written requirements for
materials, equipment, construction systems, standards and workmanship for the Work, and performance of
related services. References to specifications of manufacturers, trade associations, or the like are
understood to mean that such specifications are incorporated in the Specifications as if fully reproduced
therein. "Approved", "equal", "acceptable" and similar words are understood to mean in the sole judgment of
the Architect.
1.1.6.1 Should there be conflicts or discrepancies in the Drawings or Specifications between the quality
of work or material, the higher (more expensive) quality shall take precedence unless otherwise
directed by the Architect in writing.
1.1.6.2 The Contractor shall be responsible to the Owner for acts and omissions of the Contractor's
employees, Subcontractors, Sub subcontractors, material suppliers, equipment suppliers and
fabricators and their agents and employees, and other persons or entities performing portions of
the Work under a contract with the Contractor.
1.1.6.3 Products are generally specified by ASTM or other reference standard, and/or by manufacturer's
name and model number or trade name. When specified only by reference standard, the
Contractor may select any products or manufacturers complying with those standards. When a
number of products or manufacturers are specified as being equally acceptable, the Contractor
has the option of using any product and manufacturer or combination listed. When only one
product or manufacturer is specified, the Contractor shall provide only that which is specified.
There shall be no substitution of products or manufacturers after the Contract is executed.
1.1.6.4 Prior to the submission of bids, the Owner and Architect may consider a formal request for the
substitution of products or manufacturers where the request is accompanied by complete data
on the proposed substitution sufficient to substantiate full compliance with the Contract
Documents including product identification and description, performance and test data,
references and samples where applicable.
1.1.6.5 By making requests for substitutions as provided in paragraph 3.4.4, the Contractor:
.1 Represents that the Contractor has personally investigated the proposed substituted product
and has determined that it is equal or superior in all respects to that specified,
.2 Represents that the Contractor will provide a warranty for the substituted product that is
equal or superior to the warranty for the product specified,
.3 Waives all claims for additional costs related to the substituted product which subsequently
become apparent, and
.4 Will coordinate the installation of the accepted substitute product making such changes as
may be required for the Work to be complete in all respects.
400 Mack Ave. Elevator Addition, Modernization 00 8100-1 ADDENDUM TO GENERAL CONDITIONS
And Accessibility - Detroit, MI Bids 04.21.26
SVA Project #2024.041
1.1.6.6 Not later than thirty (30) days from the Contract Date, the Contractor shall furnish in writing to the
Owner through the Architect a list showing the names of manufacturers proposed to be used for
each of the products identified in the Specifications or on the Drawings and, as applicable, the
name of the installing Subcontractor. The Architect will promptly reply to the Contractor in
writing stating whether or not the Owner or the Architect, after due investigation, has reasonable
objection to any such proposal. If adequate data on any proposed manufacturer or installer is
not available, the Architect may state that action will be deferred until the Contractor provides
further data. Failure to object to a manufacturer shall not constitute a waiver of any of the
requirements of the Contract Documents and all products furnished by the listed manufacturers
must conform to such requirements.
1.1.6.7 The amount of credit to be allowed by the Contractor to the Owner for a deletion or change
which results in a net decrease in the Contract Sum shall include a reduction in the Contractor's
overhead and profit. When both additions and credits covering related Work or substitutions are
involved in a change, the allowance for overhead and profit shall be figured on the basis of net
increase, if any, with respect to that change.
1.1.6.8 The Contractor shall make no claim for damages for delay in the performance of this Contract
occasioned by any act or omission of the public authority having jurisdiction over the Work or
any of its representatives, and agrees that compensation for any such claim shall be limited to
an extension of time to complete performance of the Work as provided herein.
1.1.6.9 In the event the Contractor encounters on the site material reasonably believed to be asbestos
or polychlorinated biphenyl (PCB) which has not been rendered harmless, the Contractor shall
immediately stop Work in the area affected and report the condition to the Owner and Architect
in writing. The work in the affected area shall not thereafter be resumed until the Owner has
separately arranged for the asbestos or polychlorinated biphenyl (PCB) to be removed or
rendered harmless, the removal or rendering is complete in accordance with applicable
standards and requirements and has been certified safe by appropriate authorities. The Work in
the affected area shall be resumed in the absence of asbestos or polychlorinated biphenyl
(PCB), or when it has been rendered harmless or removed and certified safe.
1.1.6.10 To the fullest extent permitted by law, the Owner shall indemnify and hold harmless the
Contractor, Architect, Architect's Consultants and Agents and employees of any of them against
claims, damages, losses and expenses, including but not limited to attorneys' fees arising out of
or resulting from performance of the Work in the affected area, or from others not involved in
performance of the Work or from anyone subsequently on the premises if in fact the material is
asbestos or polychlorinated biphenyl (PCB) and has not been rendered harmless, provided that
such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death,
or in injury to or destruction of tangible property (other than the Work itself) including loss of use
resulting therefrom. Such obligation shall not be construed to negate, abridge, or reduce other
rights or obligations of indemnity which would otherwise exist as to a party or person described
in this Subparagraph 10.1.4.
1.1.6.11 The Contractor shall maintain policies of employment as follows:
1.1.6.12 The Contractor and the Contractor's Subcontractors shall not discriminate against any employee
or applicant for employment because of race, religion, color, sex or national origin. The
Contractor shall take affirmative action to ensure that applicants are employed, and that
employees are treated during employment without regard to their race, religion, color, sex or
national origin. Such action shall include, but not be limited to, the following: employment,
upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination,
rates of pay or other forms of compensation and selection for training, including apprenticeship.
The Contractor agrees to post in conspicuous places available to employees and applicants for
employment, notices setting forth the policies of nondiscrimination.
400 Mack Ave. Elevator Addition, Modernization 00 8100-2 ADDENDUM TO GENERAL CONDITIONS
And Accessibility - Detroit, MI Bids 04.21.26
SVA Project #2024.041
1.1.6.13 The Contractor and the Contractor's Subcontractors shall, in all solicitations or advertisements
for employees placed by them or on their behalf, state that all qualified applicants will receive
consideration for employment without regard to race, religion, color, sex or national origin.
1.1.6.14 All references to standards, whether for materials, processes, assemblies, workmanship,
performance, or similar purpose shall mean, unless otherwise noted, the most recent available
published version of such standard as of the date of the execution of the Contract. When
reference is made to standards, such is understood to be made a part of the Contract
Documents, and to have the same effect as if fully reproduced therein.
END OF SECTION
400 Mack Ave. Elevator Addition, Modernization 00 8100-3 ADDENDUM TO GENERAL CONDITIONS
And Accessibility - Detroit, MI Bids 04.21.26
SVA Project #2024.041
SECTION013000
ADMINISTRATIVEREQUIREMENTS
PART1 GENERAL
1.01 GENERALADMINISTRATIVEREQUIREMENTS
A. ComplywithrequirementsofSection017000-ExecutionandCloseoutRequirementsfor
coordinationofexecutionofadministrativetaskswithtimingofconstructionactivities.
B. MakethefollowingtypesofsubmittalstoArchitect:
1. RequestsforInterpretation(RFI).
2. Requestsforsubstitution.
3. Shopdrawings,productdata,andsamples.
4. Testandinspectionreports.
5. Designdata.
6. Manufacturer'sinstructionsandfieldreports.
7. Applicationsforpaymentandchangeorderrequests.
8. Progressschedules.
9. Coordinationdrawings.
10. CorrectionPunchListandFinalCorrectionPunchListforSubstantialCompletion.
11. Closeoutsubmittals.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION
3.01 REQUESTSFORINTERPRETATION(RFI)
A. Definition: Arequestseekingoneofthefollowing:
1. Aninterpretation,amplification,orclarificationofsomerequirementofContract
Documentsarisingfrominabilitytodeterminefromthemtheexactmaterial,process,or
systemtobeinstalled;orwhentheelementsofconstructionarerequiredtooccupythe
samespace(interference);orwhenanitemofworkisdescribeddifferentlyatmorethan
oneplaceinContractDocuments.
B. Preparation: PrepareanRFIimmediatelyupondiscoveryofaneedforinterpretationof
ContractDocuments. FailuretosubmitaRFIinatimelymannerisnotalegitimatecausefor
claimingadditionalcostsordelaysinexecutionofthework.
1. PrepareaseparateRFIforeachspecificitem.
C. Content: IncludeidentifiersnecessaryfortrackingthestatusofeachRFI,andinformation
necessarytoprovideanactionableresponse.
1. DiscreteandconsecutiveRFInumber,anddescriptivesubject/title.
2. Issuedate,andrequestedreplydate.
D. RFILog: PrepareandmaintainatabularlogofRFIsforthedurationoftheproject.
E. ReviewTime: ArchitectwillrespondandreturnRFIstoContractorwithinsevencalendardays
ofreceipt. Forthepurposeofestablishingthestartofthemandatedresponseperiod,RFIs
receivedafter12:00noonwillbeconsideredashavingbeenreceivedonthefollowingregular
workingday.
3.02 NUMBEROFCOPIESOFSUBMITTALS
A. ElectronicDocuments: SubmitoneelectroniccopyinPDFformat;anelectronically-markedup
filewillbereturned. CreatePDFsatnativesizeandright-sideup;illegiblefileswillberejected.
3.03 SUBMITTALPROCEDURES
A. GeneralRequirements:
1. Useasingletransmittalforrelateditems.
400MackAve.ElevatorAddition,Modernization
AdministrativeRequirements
AndVestibule Accessibility-Detroit,MI 013000 - 1
Bid 04.21.26
SVAProject#2024.041
2. ApplyContractor'sstamp,signedorinitialedcertifyingthatreview,approval,verificationof
productsrequired,fielddimensions,adjacentconstructionwork,andcoordinationof
informationisinaccordancewiththerequirementsoftheworkandContractDocuments.
3.04 SUBMITTALREVIEW
A. SubmittalsforReview: Architectwillrevieweachsubmittal,andapprove,ortakeother
appropriateaction.
B. SubmittalsforInformation: Architectwillacknowledgereceiptandreview. Seebelowfor
actionstobetaken.
C. Architect'sactionswillbereflectedbymarkingeachreturnedsubmittalusingvirtualstampon
electronicsubmittals.
D. Architect'sandconsultants'actionsonitemssubmittedforreview:
1. Authorizingpurchasing,fabrication,delivery,andinstallation:
a. "Approved",orlanguagewithsamelegalmeaning.
b. "ApprovedasNoted,Resubmissionnotrequired",orlanguagewithsamelegal
meaning.
1) AtContractor'soption,submitcorrecteditem,withreviewnotations
acknowledgedandincorporated.
c. "ApprovedasNoted,ResubmitforRecord",orlanguagewithsamelegalmeaning.
2. NotAuthorizingfabrication,delivery,andinstallation:
a. "ReviseandResubmit".
1) Resubmitreviseditem,withreviewnotationsacknowledgedandincorporated.
b. "Rejected".
1) SubmititemcomplyingwithrequirementsofContractDocuments.
E. Architect'sandconsultants'actionsonitemssubmittedforinformation:
1. Itemsforwhichnoactionwastaken:
a. "Received"- tonotifytheContractorthatthesubmittalhasbeenreceivedforrecord
only.
2. Itemsforwhichactionwastaken:
a. "Reviewed"-nofurtheractionisrequiredfromContractor.
ENDOFSECTION
400MackAve.ElevatorAddition,Modernization
AdministrativeRequirements
AndVestibule Accessibility-Detroit,MI 013000 - 2
Bid 04.21.26
SVAProject#2024.041
SECTION014000
QUALITYREQUIREMENTS
PART3 EXECUTION
1.01 CONTROLOFINSTALLATION
A. Monitorqualitycontroloversuppliers,manufacturers,products,services,siteconditions,and
workmanship,toproduceworkofspecifiedquality.
B. Complywithmanufacturers'instructions,includingeachstepinsequence.
C. Shouldmanufacturers'instructionsconflictwithContractDocuments,requestclarificationfrom
Architectbeforeproceeding.
D. Complywithspecifiedstandardsasminimumqualityfortheworkexceptwheremorestringent
tolerances,codes,orspecifiedrequirementsindicatehigherstandardsormoreprecise
workmanship.
E. Haveworkperformedbypersonsqualifiedtoproducerequiredandspecifiedquality.
F. Verifythatfieldmeasurementsareasindicatedonshopdrawingsorasinstructedbythe
manufacturer.
G. Secureproductsinplacewithpositiveanchoragedevicesdesignedandsizedtowithstand
stresses,vibration,physicaldistortion,anddisfigurement.
1.02 DEFECTASSESSMENT
A. ReplaceWorkorportionsoftheWorknotcomplyingwithspecifiedrequirements.
ENDOFSECTION
400MackAve.ElevatorAddition,Modernization
QualityRequirements
AndVestibule Accessibility-Detroit,MI 014000 - 1
Bid 04.21.26
SVAProject#2024.041
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Description: 511/26406.AGY; USPFO Warehouse - Renovate Building 40 Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/29/2026
Description: 511/26406.AGY; USPFO Warehouse - Renovate Building 40 Department: Technology, Management and Budget
State of Michigan
Bid Due: 7/29/2026
General Information Document ID RFP-GHAP-260000002396-1 Status Open Description ELEVATOR AND BFLD CODE UPGRADES
State of Michigan
Bid Due: 8/03/2026
General Information Document ID RFQ-171-260000000381-2 Status Amended Description 511/26406.AGY; USPFO Warehouse - Renovate
State of Michigan
Bid Due: 7/29/2026