Woodhaven Driveway Replacement and Asphalt Paving

Agency: City of Duluth
State: Georgia
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
  • 238990 - All Other Specialty Trade Contractors
Posted Date: Jun 11, 2026
Due Date: Jun 25, 2026
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Description

Description Opening Date/Time Closing Date/Time


Woodhaven Driveway Replacement and Asphalt Paving


Addendum 1 - Questions



May 13, 2026
:


June 25, 2026
1:45
PM

Attachment Preview

No. QUESTION RESPONSE
1 The curb is poured monolithic on Folkstone Dr, Remove driveway and curb and replace both.
is it the city's preference to remove driveway
and curb or pour driveway and saw cut, leavin
original curb?
2 There is no line item for asphalt patching, can one be added in case it is needed? Asphalt patching will be added.
one be added in case it is needed?
3 For the milling, is the 1.5" off of the existing or e 1.5" off the existing.
below the gutter line? Some of the streets hav
been overlayed and asphalt is above the curb.
4 Home owners have poured concrete in the We expect careful effort be made to not disturb the concrete in the gutter in front of driveways, but they are not the contractor's responsibility to fix because Duluth does not allow these.
are milling and paving if those come loose o
break, are we required to pour those back?
5 Will payment be based on field measurements or the exact quantities on the line items? Payment will be based on field measurements.
or the exact quantities on the line items?
6 Asphalt Patching Asphalt patching will be added.
The plans reference patching as part of the mil
and inlay detail; however, the bid form does
not appear to include a separate patching item
Should asphalt patching be considered
incidental to the milling/asphalt items, or will it
be paid separately if required?
7 Unsuitable Soils Yes, it should include the items you mentioned. 57 Stone.
For the unsuitable soils item, please confirm
whether the unit price should include
excavation, haul-off, disposal, replacement
material, placement, and compaction. Also,
please clarify what replacement material shoul
be assumed.
8 Resident Parking / Driveway Access The City will coordinate with residents on temporary parking during construction. There is on-street parking to be utilized.
Will the City or HOA provide temporary parking
areas for residents during concrete removal,
replacement, and curing, or will the contractor
be responsible for coordinating and maintainin
resident parking/access?

ADDENDUM NO. 1
TO
CONTRACT DOCUMENTS
WOODEHAVEN DRIVEWAY REPLACEMENT AND ASPHALT PAVING
DULUTH, GEORGIA
BIDS DUE JUNE 25, 2026
No. QUESTION RESPONSE
1 The curb is poured monolithic on Folkstone Dr, Remove driveway and curb and replace both.
is it the city's preference to remove driveway
and curb or pour driveway and saw cut, leaving
original curb?
2 There is no line item for asphalt patching, can Asphalt patching will be added.
one be added in case it is needed?
3 For the milling, is the 1.5" off of the existing or 1.5" off the existing.
below the gutter line? Some of the streets have
been overlayed and asphalt is above the curb.
4 Home owners have poured concrete in the We expect careful effort be made to not disturb
gutter line in front of the driveways. When we the concrete in the gutter in front of driveways,
are milling and paving if those come loose or but they are not the contractor's responsibility
break, are we required to pour those back? to fix because Duluth does not allow these.
5 Will payment be based on field measurements Payment will be based on field measurements.
or the exact quantities on the line items?
6 Asphalt Patching Asphalt patching will be added.
The plans reference patching as part of the mill
and inlay detail; however, the bid form does
not appear to include a separate patching item.
Should asphalt patching be considered
incidental to the milling/asphalt items, or will it
be paid separately if required?
7 Unsuitable Soils Yes, it should include the items you mentioned.
For the unsuitable soils item, please confirm 57 Stone.
whether the unit price should include
excavation, haul-off, disposal, replacement
material, placement, and compaction. Also,
please clarify what replacement material should
be assumed.
8 Resident Parking / Driveway Access The City will coordinate with residents on
Will the City or HOA provide temporary parking temporary parking during construction. There
areas for residents during concrete removal, is on-street parking to be utilized.
replacement, and curing, or will the contractor
be responsible for coordinating and maintaining
resident parking/access?
Addendum Prepared By
KECK & WOOD, INC.
June 12, 2026

This page summarizes the opportunity, including an overview and a preview of the attached documents.
Get Government Bids Like This by Email Receive daily bid alerts that match your keywords, business categories, and target regions.

See Also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66389-NONST-2027-000000014

State Government of Georgia

Due by 9/11/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66435-NONST-2027-000000003

State Government of Georgia

Due by 10/01/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-76110-NONST-2027-000000150

State Government of Georgia

Due by 9/16/2026

BID NAME: McConnell Middle School - HVAC Modifications and Interior Renovations BID DATE:

Gwinnett County Public Schools

Due by 9/24/2026

* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.