Willow Creek Dam: Discharge Valve
| Agency: | City of Prescott |
|---|---|
| State: | Arizona |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Mar 8, 2026 |
| Due Date: | Apr 16, 2026 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID:
Title: Willow Creek Dam: Discharge Valve
Addenda: 0
Release Date: 3/6/2026
Due Date: 4/16/2026
Post Information
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Summary
The project goal is to successfully deliver a high-quality, on-time design/build project for the engineering design and rehabilitation of the outlet valve and related appurtenant features at the City of Prescott's Willow Creek Dam (also associated with Willow Lake), located in Prescott, Yavapai County, Arizona.
This effort will ensure efficient and reliable operations of City water facilities by enabling controlled water releases to:
- Meet overall resource and supply requirements.
- Fulfill downstream customer delivery commitments.
- Satisfy Emergency Action Plan (EAP) obligations, including safe management of potential overtopping or flood events.
By completing these improvements, the project supports the long-term functionality, safety, and regulatory compliance of this critical municipal infrastructure.
Background
The City of Prescott is seeking qualified design/build teams to deliver a comprehensive engineering design and construction project for the rehabilitation of the existing outlet valve and associated appurtenant features at the City's reservoir/dam facility. This critical infrastructure improvement project aims to enhance operational reliability, improve flow control, ensure long-term structural integrity, and mitigate potential impacts from increased discharges, while supporting safe future operations and maintenance.
Key Project Scope Elements Include:
- Replacement or upsizing of the existing 12-inch outlet pipe and valve to optimize capacity and performance.
- Installation of a new outlet slide gate at the inlet (water side) to provide improved and mitigated control of reservoir discharge.
- Repair of concrete spalling and deterioration present throughout the top cap structure for restored durability and safety.
- Modifications and mitigation measures at the existing East Calvary Drive downstream water crossing to accommodate and safely manage any increased flows resulting from outlet upsizing.
- Provision of a stabilized roadway/access route to facilitate ongoing operations, maintenance, and emergency access.
The selected design/build team will be responsible for all aspects of the project, including preliminary and final engineering design, permitting coordination (as applicable), construction, testing, commissioning, and closeout. The team should demonstrate proven experience in dam/reservoir outlet works rehabilitation, hydraulic systems, concrete repair, and design-build delivery methods for similar public infrastructure projects.
This project represents an opportunity to partner with the City in safeguarding water resource infrastructure, ensuring regulatory compliance, and enhancing community resilience.
Interested firms are encouraged to review the full solicitation documents (available through the City's procurement portal or contact point) and submit qualifications/proposals in accordance with the specified deadlines and requirements.
Timeline
Microsoft Teams Meeting
https://teams.microsoft.com/meet/23893072250775?p=vW5I3bJep5HLgfqiOK
ID: 238 930 722 507 75
Passcode: Lt6MN2FV
See Also
Chip Seal Project #1120093 2011/2012 Spring Chip Seal Project in Yavapai County, Arizona
Yavapai County
Due by 12/31/2099
Project ID: JOC259 Title: LARGE DIAMETER MAIN AND VALVE PROGRAM JOB ORDER CONTRACT
City of Phoenix
Due by 9/25/2026
Project ID: Title: Supply Aggregate Base Course Addenda: 0 Release Date: 9/1/2026 Due
Yavapai County
Due by 9/17/2026
Project: Utility Cuts - Asphalt and Concrete Patches Ref. #: P27-0002 Type: IFB
City of Peoria
Due by 9/24/2026