Wildfire Reclamation McMurray Fire MWF-047
| Agency: | Government of Alberta |
|---|---|
| State: | Alberta |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Feb 11, 2025 |
| Due Date: | Mar 3, 2025 |
| Solicitation No: | AB-2025-01112 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Open & competitive opportunity
Open
Forestry and Parks
Request for Proposal
All reclamation of the dozer guard on MWF-047 will need to occur during frozen ground conditions. The overburden and organics pushed up against the treeline should be rolled back and dispersed along the disturbed mineral soil. The dozer guard on MWF-047 is characterized as being on average 15m wide for 51.64 km (77.46 ha), a section with an average width of 26 m runs for 12.11 km (31.49 ha). In total, the area of guard that needs to be reclaimed is estimated at 108.95 ha. There have been 47 helipads constructed along the dozer guard totaling approximately 50ha. Total estimated area to be reclaimed on MWF-047 is 158.95ha. There are 17 crossing that will need to be removed and mitigated.
Majority of the guard has been created in C1 and C2 fuel types. Portions of the guard have been reclaimed with focus on rehabilitating those disturbed areas near the Firebag river.
A temporary crossing of the Firebag river will be required to complete work north of the river.
ACCESS:
The most efficient access to the fire and associated dozer guard is via the east/north-east side of Imperial Oil Kearl Lake’s mine site. A trail that runs parallel with the Firebag river is on high ground and provides access to the west/north-west perimeter of the wildfire. The distance from Kearl Lake to the west flank of the fire is roughly 14.5km. In summer conditions it took heavy equipment 5-6 hours to walk in from Kearl Lake. Successful bidder will need to coordinate access to work area through the Kearl Lake site.
ACCESS FEATURES (ROADS)
The following has been agreed with local trappers: that newly created dozer guard will be rolled back. The pre-existing unimproved road/trail that had been widened to ~50m will be rolled back to an opening of 6-9m (1-1.5 blade width).
Reclamation Summary
1. Total Creek Crossings (not including Firebag river) 17
2. Heli-pads summary 47
a. Estimated Area of Helipads 50 ha
3. Total Length of Dozer Guard needing reclamation ~63.75km
a. Estimated Area of Dozer guard needing Reclamation ~109 ha
4. Total Length of Dozer Guard reclamation complete ~26.50km
5. Total Length of roads used as Dozer Guard reclamation complete ~6.5km
6. Bell Holes 9
7. Total estimated Area to be reclaimed ~160 ha
APC Reference #
AB-2025-01112
Category
Services
Posting Date • Time
Feb 10, 2025 • 12:23 pm (MT)
Closing Date • Time
Mar 3, 2025 • 2:00:59 pm (MT)
Region(s) of Delivery
Alberta
Get Government Bids Like This by Email
Receive daily bid alerts that match your keywords, business categories, and target regions.
See Also
Basic Information APC Reference # AB-2026-05546 Internal Reference # 2026-106 Title Fire Engine
Government of Alberta
Due by 10/20/2026
Open Open & Competitive Opportunity * Request for Proposal Public Safety and Emergency
Government of Alberta
Due by 12/15/2028
Basic Information APC Reference # AB-2026-06375 Internal Reference # RFQ No. Q260520FS Title
Government of Alberta
Due by 10/26/2026
Basic Information APC Reference # AB-2026-06203 Internal Reference # 7604 Title Structural Turnout
Government of Alberta
Due by 10/14/2026
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.