Whitehaven Clinic Construction Addendum No. 1

Agency: Shelby County
State: Tennessee
Type of Government: State & Local
NAICS Category:
  • 236220 - Commercial and Institutional Building Construction
Posted Date: Dec 5, 2025
Due Date: Jan 8, 2026
Solicitation No: SB-I000928
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page

Bid Title:
SB-I000928 Addendum No. 1
Category:
Health Department
Status:
Open

Publish Date:
Friday, December 5, 2025 - 5:00pm
Close Date:
01/08/2026 - 2:30pm
Contact Person:
Christina Lemartin
[X]

Please submit following details in order to view the document

Name/Business Name *
Email Address *
Phone Number *
Bid Title
Redirect URL

Attachment Preview

Shelby County
Tennessee
Lee Harris, Mayor
Addendum No. 1
Issued: December 08, 2025
Whitehaven Clinic Construction
(Health Services)
TO ALL PROSPECTIVE BIDDERS:
The above described SEALED BID has been modified to reflect the following changes.
1. The attached Appendix D Geotechnical Exploration Report is incorporated for
informational purposes only. It is not a part of the design documents (Appendix B
Permit Set & Appendix C Project Manual).
2. The deadline for submitting questions is extended to Tuesday, December 16, 2025, by
12:00p.m. (CST).
All other requirements of the SEALED BID remain unchanged.
If you have any questions, please contact me via email at christina.lemartin@shelbycountytn.gov.
.
Sincerely,
Original Signature on File
Christina Le Martin, Buyer
Purchasing Department
Shelby County Government
Appendix D
Geotechnical Exploration Report
GEOTECHNICAL EXPLORATION
WHITEHAVEN HEALTH CLININC
MEMPHIS, TENNESSEE
Prepared for:
PICKERING FIRM, INC.
MEMPHIS, TENNESSEE
Prepared by:
GEOTECHNOLOGY, LLC, DBA UES
MEMPHIS, TENNESSEE
Date:
JULY 9, 2024
Geotechnology Project No.:
J045148.01
SAFETY
TEAMWORK
RESPONSIVENESS
INTEGRITY
VALUE
EXCELLENCE
Geotechnical Exploration
Whitehaven Health Clininc | Memphis, Tennessee
July 9, 2024 | Project No. J045148.01
TABLE OF CONTENTS
1.0 Introduction ...........................................................................................................................1
2.0 Site Description.....................................................................................................................1
3.0 Project Information ................................................................................................................1
4.0 Geotechnical Exploration ......................................................................................................2
5.0 Laboratory Review and Testing.............................................................................................2
6.0 Stratigraphy...........................................................................................................................3
6.1 Surficial Conditions..........................................................................................................3
6.2 Stratigraphy.....................................................................................................................3
6.2.1 Predominately Fine-Grained Soils ..........................................................................3
6.2.2 Predominately Coarse-Grained Soils ......................................................................3
6.3 Groundwater ...................................................................................................................3
7.0 Conclusions and Recommendations .....................................................................................3
7.1 Moisture Sensitivity and Subgrade Softening ..................................................................4
7.2 Site Preparation and Earthwork.......................................................................................4
7.2.1 Initial Site Preparation and Proofroll........................................................................4
7.2.2 Fill Classification, Placement and Compaction........................................................4
7.3 Seismic Site Classification and Seismic Parameters .......................................................6
7.4 Liquefaction and Dynamic Settlement .............................................................................7
7.5 Shallow Foundations .......................................................................................................8
7.6 Ground Improvement ......................................................................................................8
7.7 Augercast Piles ...............................................................................................................8
7.7.1 ACP Uplift Resistance ............................................................................................9
7.7.2 ACP Pile Groups ....................................................................................................9
7.7.3 ACP Construction Considerations...........................................................................9
7.7.4 ACP Static Load Testing.......................................................................................10
7.7.5 ACP Foundation Settlement .................................................................................10
7.7.6 ACP Lateral Load Analyses ..................................................................................10
7.8 Floor Slabs ....................................................................................................................10
7.9 Pavements ....................................................................................................................11
7.10 Utility Construction ......................................................................................................13
8.0 Recommended Additional Services.....................................................................................14
9.0 Limitations...........................................................................................................................14
Appendices
Appendix A Important Information about This Geotechnical-Engineering Report
Appendix B Figures
Appendix C Boring Information
Appendix D Laboratory Test Data
© 2024 Geotechnology, LLC, dba UES
i
This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project: Nashville JFHQ Building 100 Second Floor HVAC and Facility Update Nashville Joint

State Government of Tennessee

Bid Due: 6/11/2026

Form Details (Abstract): RFQ 361781 Status Active Document PDF File Abstract Negotiation Number

City of Memphis

Bid Due: 7/22/2026

Bid Number: 26-017 Bid Title: Sidewalk Replacement Category: Bid Postings Status: Open Description:

City of Bristol

Bid Due: 6/15/2026

Bid Title: FY2027-011 Sanitary Sewer Hard Connection Project Category: Bids & RFPs Status:

City of Oak Ridge

Bid Due: 6/30/2026