| Agency: | City of Kalamazoo |
|---|---|
| State: | Michigan |
| Type of Government: | State & Local |
| Posted Date: | Mar 7, 2025 |
| Due Date: | Mar 27, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Closing date
March 27, 2025, 03:00 PM
91396-022.0-Bid Document (PDF, 25MB)
91396-022.0-distribution list (PDF, 61KB)
91396-022.0-appendix c (PDF, 23MB)
91396-022.0-appendix d (PDF, 1MB)
INTENT
It is the intent of these plans and specifications to provide for a general contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the Westnedge Ave (Vine- Michigan) project as described in the specifications and bid document.
SCOPE OF WORK
The scope of work for this project shall consist of 2-inch mill and resurface of roadway from Vine intersection going north approximately 0.5 miles, stopping just short of Michigan Ave. This includes the intersections of Vine, Dutton, Walnut, Cedar, Lovell, South, and Academy. The Michigan Ave intersection is NOT included in the scope of this project. The traffic signals at Vine and Lovell will be replaced, and sidewalk ramps at all intersections except South will be removed and reconstructed. Project also includes typical items such as SESC measures, temporary and permanent traffic control devices, drive entrances as needed, and structure adjusts.
All necessary traffic control, labor, materials, tools, equipment, and other items incidental to the work being performed shall be included in the Contractor’s unit price for this contract. Such items will not be bid or paid for separately but shall be included in the overall unit price. The bidder shall furnish all labor, supervision, supplies, tools, equipment, and other means necessary or proper for performing and completing the work.
The bidder shall be responsible for the cleaning up of the job site and shall repair or restore all structures and property that may be damaged or disturbed during performance of the work to the satisfaction of the Public Services Department for the City of Kalamazoo. Drainage structure covers shall be salvaged and reused if in usable condition; otherwise, they shall be replaced. Where needed, all traffic control used for such operations as defined by the MMUTCD will be the responsibility of the bidder.
The bidder shall have all work completed within 60 calendar days of beginning work AND no later than September 1, 2025 (contractor shall be held to stricter/earlier deadline).
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
07/29/2026 at 11 AM: Mill and Overlay 44th St from Canal to Wilson
Grandville city
Bid Due: 7/29/2026
Bid Title: City of Holland Fire Dept Drager SCBA competitive bid - not
City of Holland
Bid Due: 7/31/2026
Description: 2026-27 Fresh Made Pizza for Lunch Service Department: Northville Public Schools Buyer:
State of Michigan
Bid Due: 8/17/2026
Bid Title: City of Holland New Vehicle bid Category: Bids, RFPs and RFQs
City of Holland
Bid Due: 8/03/2026