100 West Road, Burley

Agency: State Government of Idaho
State: Idaho
Type of Government: State & Local
NAICS Category:
  • 237310 - Highway, Street, and Bridge Construction
Posted Date: Jun 8, 2026
Due Date: Jun 29, 2026
Solicitation No: Key No. 23736
Original Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Due Date Date Posted Open Solicitations Details
June 29, 2026 June 8, 2026 100 West Road, Burley, Key No. 23736 CE&I Services

District 4

Attachment Preview

THE IDAHO TRANSPORTATION
DEPARTMENT
And
THE LOCAL HIGHWAY TECHNICAL
ASSISTANCE COUNCIL
And
BURLEY HIGHWAY DISTRICT
REQUEST FOR PROPOSALS
FOR
CONSTRUCTION ENGINEERING, INSPECTION,
MATERIALS TESTING, AND
PROJECT CLOSE-OUT SERVICES
100 WEST ROAD, BURLEY HD
KEY NO. 23736
6/8/2026

REQUEST FOR PROPOSALS
Table of Contents
General Information
Preparation Instructions
Evaluation Criteria
CE&I Federal-aid Project Log
Scope of Work
The following items are not included in this package, but can be located at the following web
sites:
http://itd.idaho.gov/business/?target=consultant-agreements

General Information and Requirements
Sample Agreement and Consultant Agreement Specifications (CE&I)
Federal Per Diem Policy
Certification Regarding Debarment, Suspension, and Other Responsibility Matters form
Idaho Code Certification Form
http://apps.itd.idaho.gov/apps/manuals/manualsonline.html
ITD Quality Assurance Manual
ITD Contract Administration Manual
100 WEST RD, BURLEY HD
Key No.23736
Page 2

GENERAL INFORMATION
PROPOSAL
The Idaho Transportation Department (ITD), the Local Highway Technical Assistance Council
(LHTAC), and the Burley Highway District are seeking qualified and experienced respondents
from interested firms to submit a proposal for providing construction engineering, inspection, and
materials testing (CEI) services for the 100 West Rd project in Cassia Co.
GENERAL TERMS
This Request for Proposals (RFP) does not commit the ITD, the LHTAC, or the Burley Highway
District to enter into an agreement or to pay any costs incurred in the preparation of a proposal or
in subsequent negotiations.
REVISIONS TO RFP
All addenda to this solicitation will be posted on the Consultant Services web page. No notice will
be given by mail.
RESERVATION OF RIGHTS BY ITD
The issuance of this RFP does not constitute an assurance by the ITD, the LHTAC, or the Burley
Highway District that any contract will actually be entered into by the ITD, the LHTAC, or the
Burley Highway District, and expressly reserves the right to:
Waive any immaterial defect or informality in any response or response procedure
Reject any and all proposals
Reissue the Request for Proposals
Invite additional respondents to the proposal
Request additional information and data from any or all respondents
Extend the date for submission of responses
Supplement, amend, or otherwise modify the RFP, and cancel this request with or without
the substitution of another RFP
Disqualify any respondent who fails to provide information or data requested herein or
who provides inaccurate or misleading information or data
Disqualify any respondent on the basis of any real or apparent conflict of interest
By responding to this solicitation, each respondent agrees that any finding by the ITD, the
LHTAC, or the Burley Highway District of any fact in dispute as to this solicitation or the
responses thereto shall be final and conclusive, except as provided herein.
100 WEST RD, BURLEY HD
Key No.23736
Page 3

CONFLICT OF INTEREST
By the submission of a proposal, the Consultant agrees to ensure that, at the time of contracting,
the Consultant will have no interest, direct or indirect, that would conflict in any manner or degree
with the performance of the Consultant's obligations under the Agreement. The Consultant shall
further covenant that, in the performance of the contract, the Consultant shall not employ any
person, or subcontract with any entity, having any such known interest.
EEO REQUIREMENTS
Respondent, by submission of a proposal, agrees to not discriminate against any worker, employee,
application subcontractor or any member of the public because of race, color, gender, age, national
origin, or disability, or otherwise commit an unfair employment practice. Respondent further agrees
to comply with all Federal, State, and Local equal employment opportunity requirements and the
requirements of the ITD EEO Special Provisions, accessible at the following web site:
http://apps.itd.idaho.gov/apps/ocr/index.aspx.
All firms working for the Department are required to register on the Bidder's List with the Office
of Civil Rights. If your firm has not registered, go to the following website for instructions:
https://itd.dbesystem.com/. Please make sure your subconsultants are also registered. For further
information regarding this requirement, call the ITD EEO Office at (208) 334-8884.
DBE PARTICIPATION:
In an effort to achieve ITD's DBE Annual Participation Goal (APG) of 10% utilization, ITD
respectfully requests and encourages responder to consider utilizing subcontractors and suppliers
listed on our DBE Directory located at: https://itd.dbesystem.com . For more information regarding
ITD's DBE Program, call the ITD DBE coordinator at (208) 334-8567.
FINANCIAL REQUIREMENTS
Prior to negotiating an agreement, the selected consultant and their subconsultants will be required
to submit certified hourly rates and their last years' financial information and overhead schedule in
accordance with the Federal Acquisition Regulations (FARs) and the most recent version of the
AASHTO Audit Guide. More information can be found at the following web site:
http://itd.idaho.gov/business/?target=consultant-agreements.
PROPRIETARY MATERIAL
The ITD, the LHTAC, and the Burley Highway District assume no liability for disclosure of
proprietary material submitted by respondents. Proposal submittals shall be considered public
documents under applicable state law except to the extent portions of the submittals are otherwise
protected under applicable law.
CERTIFICATION REGARDING DEBARMENT
All proposals must contain a signed Certification Regarding Debarment, Suspension, and other
Responsibility Matters form for the prime and each subconsultant.
100 WEST RD, BURLEY HD
Key No.23736
Page 4

The certification form is located on the Consultant Services web page at
http://itd.idaho.gov/business/?target=consultant-agreements.
IDAHO CODE CERTIFICATION FORM
All proposals must contain a signed Idaho Code Certification form for the prime.
The certification form is located on the Consultant Services web page at
http://itd.idaho.gov/business/?target=consultant-agreements.
PROPOSAL EVALUATION AND SELECTION
An Evaluation Committee will evaluate and determine the individual and comparative merits of
each of the proposals received. It is the responsibility of the Consultant to ensure that it complies
with this RFP and provides the information requested. If the Consultant fails to provide any
information requested in this RFP, such failure may result in either a lowered evaluation score of
the proposal or disqualification of the proposal.
It is the intent of the department to take approximately 15 days, commencing on the submission
date shown below, to evaluate the submitted proposals. The department intends to notify the
successful and unsuccessful Consultants as soon as practicable after the evaluations have been
completed, and after approval has been given on the Evaluation Committee's recommendations.
As part of the selection process, the top-ranked firms may be required, at their expense, to give a
presentation and/or answer interview questions.
If your firm is selected and approved, negotiations will begin. If negotiations break down with a
selected Consultant, they will be formally ended and negotiations will begin with the next ranked
Consultant.
CONTRACT TYPE AND METHOD OF PAYMENT
The contract for this work will be a professional services agreement. It is anticipated that the
method of payment will be Specific Rates of Compensation.
CONTACT INFORMATION
All questions concerning the procedures of this request for proposal shall be directed to Christina
Straub at ITD via email at William.Derome@itd.idaho.gov.
All project specific questions shall be directed by e-mail to Jayme Coonce at jcoonce@lhtac.org.
No questions will be accepted by telephone. All questions will be responded to by e-mail, within
two days of receipt of the question(s).
Interested firms are encouraged to submit a contact e-mail address to Ms. Coonce with a request to
be included on an electronic mailing list. Firms on the mailing list will receive copies of the
response to all project questions submitted. No firms will be identified in the responses. No project
specific questions will be accepted after 6/22/2026.
100 WEST RD, BURLEY HD
Key No.23736
Page 5

PREPARATION INSTRUCTIONS
Proposals must conform to the following instructions. Any non-conforming proposal will be
rejected.
Proposals must be received by ITD by 4:00 p.m. MST on June 29, 2026. Proposals must be
submitted via e-mail with the project name and the consultant's name clearly indicated in the
subject line. Late proposals will not be considered.
E-Mail Address for proposal submittal is: consultantservices@itd.idaho.gov
FORMAT:
Required File Format: pdf
Maximum length of the submittal shall be five (5) pages.
Cover pages are discouraged. If they are included, they will be counted in the proposal
page total.
The introductory letter is limited to one (1) page.
Except as otherwise noted, pages shall be 8 12 x 11 inches, with minimum of 12" margins
and a minimum font size of 11.
The following items do not count in the proposal page total.
Introductory letter
Certification Regarding Debarment
The 5-Year ITD/LHTAC CE&I Project Log does not count in the proposal page total.
Idaho Code Certification Form
INTRODUCTORY LETTER
The introductory letter should be addressed to: William Derome
Contracts Officer
Consultant Services
Idaho Transportation Department
P.O. Box 7129
Boise, Idaho 83707-1129
The introductory letter should introduce the Consultant's submittal, identify the Project Manager,
list a contact telephone number, and contain a statement confirming the commitment of the key
personnel identified in the submittal to meet the ITD's, the LHTAC's, and the Burley Highway
District's quality and schedule expectations. List each Subconsultant, their work tasks, and a
contact name and telephone number. The Consultant shall include his/her acceptance of the terms
and provisions of the Sample Agreement located at
100 WEST RD, BURLEY HD
Key No.23736
Page 6

http://itd.idaho.gov/business/?target=consultant-agreements, and indicate willingness to execute
said agreement.
PROPOSAL
It is essential that the consultant provides an adequate staff of experienced personnel or
subconsultants capable of and devoted to the successful accomplishment of work to be performed
under this contract. The specific individuals or subconsultants listed in the proposal, including
Project Manager and Lead On-Site Inspector, shall be assigned to the key positions and shall not
be removed or replaced without the prior written approval of the ITD, the LHTAC, or the Burley
Highway District. Replacement personnel submitted for approval must have at least equal
qualifications, experience and expertise as those listed in the proposal.
The following criteria will be considered in the evaluation and selection, and apply only to the
Consultant, except where specifically requested for the Consultant and each Subconsultant.
CRITERIA 1 - PROJECT MANAGER (Weight 3)
(Complete for Lead Consultant Project Manager Only)
- Identify the Project Manager who will be responsible for the quality, timeliness and
delivery of the consultant's work, and for ensuring that adequate personnel and other
resources are available for this project.
- Provide a brief summary of education, experience, and qualifications pertaining to
the management of this project. CE&I experience in working on state and local
Federal- aid construction projects within the past five (5) years should be included if
available. List all CE&I experience on the 5-year CE&I Federal-aid Project Log
included in this solicitation.
- List current IQP qualifications pertinent to this project.
- Provide Idaho registration (registration is required at the time of submittal) as a
professional engineer.
- List all projects that the Project Manager is currently managing and the percent
of time spent by him/her on each of those projects. Include estimated
completion date for each of those projects. Describe availability to the project as
a percentage. Commitments should include but are not limited to: time spent
performing design, construction engineering, inspection, management, and
marketing. Scoring consideration will be made on staff known to be assigned to
other ITD and local agency projects.
CRITERIA 2 - LEAD ON-SITE INSPECTOR (Weight 5)
(Complete for the Lead Inspector only)
- Identify the Lead Inspector to be assigned to the project and describe the duties and
qualifications (WAQTC & IQP) on this project. The Lead Inspector must be on-site
for no less than 70% of the time worked by the Contractor.
- List the CE&I experience and role that this individual has had on state and local
Federal-aid roadway construction projects. List that experience on the 5-year CE&I
Project Log included in this solicitation. Include the estimated percentage of time
100 WEST RD, BURLEY HD
Key No.23736
Page 7

spent on each completed Federal-aid construction project.
- Include Idaho professional registration (if applicable).
- List project duties that will be handled by the Lead Inspector. Will the Lead
Inspector complete relevant project paperwork and software entries while on site; list
the extent of these duties.
- List all projects that the Lead Inspector is currently working on and the percent of
time spent by him/her on each of those projects. Include estimated completion date
for each of those projects. Identify availability as a percentage.
CRITERIA 3 - KEY PERSONNEL ASSIGNED TO THE PROJECT (Weight 2)
(Complete for Consultant and each Subconsultant)
- Identify the key personnel to be assigned to the project:
* Additional Inspector/Alternate Inspector
* Document controller/Records Inspector
* Materials Testing Coordinator/Manager
* Lead Materials Technician
- The first individual listed for each role will be considered in scoring. Additional
personnel will be excluded from consideration.
- Describe each person's role, duties and qualifications (WAQTC & IQP) on this
project. Include their office and lab location.
- Key Personnel should have direct applicable CEI experience in working on state and
local Federal-aid construction projects within the last five (5) years. List that
experience on the 5-year CE&I Federal-aid Project Log included in this solicitation.
- Include Idaho professional registration (if applicable) for each person identified.
- Describe availability to the project as a percentage. Commitments should include but
are not limited to: time spent performing design, construction engineering or
inspection, and marketing. Scoring consideration will be made on staff known to be
assigned to other ITD and local agency projects.
- If staff members are currently assigned to other projects, note how the other
project(s) will be impacted and the impact resolved.
- The proposed material testing firm must have a current, approved Schedule of
Testing fees approved by the LHTAC at the time of selection. All testing will be
billed at these direct rates, no allowance will be made to modification to this billing
method.
CRITERIA 4 - PROJECT CONTROL & CLOSE-OUT (Weight 3)
- Describe the Consultant's procedures for scope change control, schedule and cost
control and quality control. This should include a description of the Consultant's
control measures regarding the Sub consultant's project-related work and the ability
to close out the project in a timely and cost-effective manner.
- List construction projects that have been closed out to Federal-aid standards in the
last five (5) years.
100 WEST RD, BURLEY HD
Key No.23736
Page 8

CRITERIA 5 - PROJECT MANAGEMENT PLAN (Weight 3)
- Describe the Consultant's project management strategy. This should include, but
not be limited to:
* The number and type of field staff expected. How much
involvement/time is expected from each member of field staff for the
duration of the work.
* Administrative personnel anticipated and their level of involvement.
* Proposed Project Managers anticipated level of involvement
including specific project duties, detailed as percentage.
* All involvement/time should be expressed as a percentage of the
contract working/calendar days.
* Overall strategy to meet the project Scope of Work.
* Strategy to maintain staffing continuity in light of project duration.
* Any anticipated staffing concerns/considerations.
* Additional project observations.
- Describe your procedures for maintaining adequate and timely communications to
project staff, LHTAC, ITD and interested stakeholders.
100 WEST RD, BURLEY HD
Key No.23736
Page 9

SCOPE OF SERVICES FOR
CONSTRUCTION ENGINEERING, INSPECTION & SAMPLING (CEI&S) SERVICES
General Scope of Project:
The project will widen and improve a 1.65 mile section of 100 W Road from milepost 102.05 to
milepost 103.7 to address design deficiencies and safety issues in order for it to be designated as
a 129,000 lb truck route. The planned reconstruction will consist of removing and reconstructing
the existing roadway, improving intersections, and replacing the bridge over H Canal. The road
pavement will be widened from 22 feet to 28 feet, and the alignment will shift 5 feet to the east to
avoid impacts to the existing canal, residences, and utilities on the project's west side. The current
28-foot-wide bridge structure over H Canal will be replaced by a widened structure to
accommodate the 12-foot clear zones of the roadway. The new culvert will be approximately 90
feet wide out-to-out, an increase of 17 feet on the west side and 27 feet on the east side and will
match the vertical and horizontal dimensions of the opening of the existing culvert.
Work will take 74 working days and has a floating start date of August 24, 2026 to April 12,
2027.
Major CE&I work activities include the following:
Contract Administration
Survey Control
Project Inspection
Material Sampling and Testing
Record Drawings and Project Closeout
100 WEST RD, BURLEY HD
Key No.23736
Page 10

This page summarizes the opportunity, including an overview and a preview of the attached documents.
* Disclaimer: This website provides information about bids, requests for proposals (RFPs), or requests for qualifications (RFQs) for convenience only and does not serve as an official public notice. Individuals who wish to respond to or inquire about bids, RFPs, or RFQs should contact the relevant government department directly.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Project ID: Title: RFQ - Electrical - Lincoln Lift Station Package 1 Addenda:

City of Caldwell

Bid Due: 9/04/2026

Follow ID FLAP ADA 2019(1), Western Heritage Byway - Swan Falls Road Active

TRANSPORTATION, DEPARTMENT OF

Follow ID FS NEZPR117 100(1), Kamiah Pierce Road Repairs Active Contract Opportunity Notice

TRANSPORTATION, DEPARTMENT OF

Bid Due: 8/28/2026

Bid date project number project name 08-11-26 25334 Edgemeade RC Storage Facility, Division

State Government of Idaho

Bid Due: 8/11/2026