West Beach Pier Rehabilitation and Improvements
| Agency: | City of Clermont |
|---|---|
| State: | Florida |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 16, 2025 |
| Due Date: | Nov 20, 2025 |
| Solicitation No: | RFB 26-025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Project ID: RFB 26-025
Title: West Beach Pier Rehabilitation and Improvements
Addenda: 0
Release Date: 10/16/2025
Due Date: 11/20/2025
The City of Clermont is undertaking the renovation of the West Beach Pier, located at 215 12th Street, which sustained damage during Hurricane Milton. The project will rehabilitate the existing pier structure to restore safe public access, improve durability against future storm events, and enhance the overall amenities of the park. The estimated cost of construction is $100,000.
The renovation will include the removal and replacement of the existing wood decking with storm-resistant Thru-Flow decking or an approved equal, the construction of new guardrails around the entire perimeter, and the installation of additional cross bracing for structural reinforcement. The contractor will inspect all pilings and wood members, replacing any damaged components as required, and will repair structural deficiencies at the pier’s intersection points. All incidental hardware, including hangers, brackets, screws, and bolts, will be provided and installed to complete the work.
The project also requires strict debris containment and disposal measures to protect the water and the surrounding environment. Contractors must prevent debris from entering the lake, remove and properly dispose of waste daily, and transport all demolition materials to approved facilities. Construction fencing will be installed to secure the site, and daily cleanup will ensure the work area remains safe and orderly throughout the project.
The selected contractor must be properly licensed in Florida, demonstrate at least five years of relevant experience (preferably with municipal clients), and provide proof of insurance. The contractor is also responsible for securing all necessary permits and approvals prior to construction.
Upon completion, the renovated pier will be inspected and reviewed by City staff to ensure compliance with all specifications and standards. Final acceptance will occur once all work is complete, the site has been thoroughly cleaned, and any required corrective actions have been addressed.
215 12th Street, Clermont, FL 34711
The meeting will begin promptly at the time specified above.
Zoom Meeting Information
https://us06web.zoom.us/j/86221438465?pwd=NGM1mV4aVJJsmXHFFbmceZsOU6qab1.1
Meeting ID: 862 2143 8465
Passcode: 868480
One tap mobile
+13052241968,,86221438465#,,,,*868480# US
+13017158592,,86221438465#,,,,*868480# US (Washington DC)
Dial by your location
• +1 305 224 1968 US
• +1 301 715 8592 US (Washington DC)
• +1 309 205 3325 US
• +1 312 626 6799 US (Chicago)
• +1 646 558 8656 US (New York)
• +1 646 931 3860 US
• +1 360 209 5623 US
• +1 386 347 5053 US
• +1 507 473 4847 US
• +1 564 217 2000 US
• +1 669 444 9171 US
• +1 689 278 1000 US
• +1 719 359 4580 US
• +1 720 707 2699 US (Denver)
• +1 253 205 0468 US
• +1 253 215 8782 US (Tacoma)
• +1 346 248 7799 US (Houston)
Meeting ID: 862 2143 8465
Passcode: 868480
Find your local number: https://us06web.zoom.us/u/kej9Nwvgk
See Also
Advertisement Detail Department of Transportation Agency Decisions PALM BEACH AND NORTHERN 3 COUNTIES(NC3)
State Government of Florida
Due by 10/11/2040
Advertisement Detail Department of Transportation Single Source Reedy Creek Improvement District Advertisement Number:
State Government of Florida
Due by 11/12/2050
Solicitation # Project Title Due Date #010-26 Sardinia Drive Lift Station #32 Emergency
City of Eustis
Due by 9/11/2026
Project ID: PSUT-26-06 Title: Phase 2 Polk Building Renovations Addenda: 0 Release Date:
City of Pembroke Pines
Due by 9/08/2026