Watercraft Operations and Maintenance
| Agency: | DEPT OF DEFENSE |
|---|---|
| State: | Florida |
| Type of Government: | Federal |
| FSC Category: |
|
| NAICS Category: |
|
| Set Aside: | Total Small Business Set-Aside (FAR 19.5) |
| Posted Date: | Sep 19, 2025 |
| Due Date: | Oct 20, 2025 |
| Solicitation No: | FA481925R00090003 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- Updated Published Date: Sep 19, 2025 04:50 pm EDT
- Original Published Date: Sep 19, 2025 04:48 pm EDT
- Updated Date Offers Due: Oct 20, 2025 02:00 pm EDT
- Original Date Offers Due: Oct 20, 2025 02:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Nov 04, 2025
- Original Inactive Date: Nov 04, 2025
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
-
NAICS Code:
- 488330 - Navigational Services to Shipping
-
Place of Performance:
Tyndall AFB , FL 32403USA
Amendment 0003 to solicitation FA481925R0009 Watercraft Operations and Maintenance.
The following changes will be made to the Watercraft Operations and Maintenance solicitation:
A. Attachment 10:
1. Attachment 10 due date is changed from 01 October 2025 to 15 October 2025.
B. Attachment 08 Addendum 52.212-1 instructions to offerors:
1. Section N, paragraph 4 Tables, Charts, Graphs and Figures is changed from 12 point font to 10 point font.
2. Included language to exclude table of contents and glossary from Volumes II and III, for overall page count.
3. Updated Volume II Tab 3, Technical Subfactor 2 - Security Clearance changed the refence to 3.4.2.2 & 5.1.1
4. Volume II - Technical, Page 7 Changed "(2) Technical Approach" and replaced with "(2) Security Clearances."
5. Volume II Tab 2 subfactor 1 Staffing Plan, a. removed "Functional Area" and replaced with "Labor Category".
6. Vol I Tab 2 Title Changed to reflect the narrative in Volume I section D. Tab 2.
7. Section T Vol 2 Tabs have been corrected to proper order.
8. Remove Mission Essential Services Plan from the evaluation criteria in Section T Volume II and include the language for Mission Essential Contractor Services
Plan into Section T Volume I Tab 6. Mission Essential Services Plan will no longer be evaluated under Technical Evaluation in Volume II.
9. The narrative of the Mission Essential Contractors Services Plan have been updated to reflect those of DFARS 252.232-7024.
10. Updated Volume II Tab 4 a. Quality Control Plan to include the following language, "The offeror will be required to submit a DRAFT copy of the Quality control
plan with their proposal."
C. Attachment 09 Addendum to 52.212-2 Evaluations:
1. Removed title language at 1.2 and language at 1.2(v).
2. Included language at 2.1 to read as "This is a subjective trade-off source selection and, for those Offerors who are determined to be technically acceptable, tradeoffs
may be made between past performance, and price in which competing offerors past performance information will be evaluated at approximately equal to
price."
3. Included language at Section 4 Technical Evaluation, "Evaluation will continue until ALL responsive proposals have been evaluated."
4. Removed Mission Essential Services Plan from Section 4 Technical Evaluation of the addendum.
5. Updated Section 4.3 Technical Subfactor 3: Quality Control Plan to include the following language, "The offeror will be required to submit a DRAFT copy of the
Quality control plan with their proposal."
6. Updated Section 6 Evaluation Methodology:
Step 1: Evaluate all proposals for responsiveness to the solicitation terms and conditions.
Step 2: Evaluate all responsive proposals for technical acceptability and past performance.
Step 3: Make a Best Value determination based on the offerors technical acceptability, past performance, and price.
- BLDG 36235 CP 850 283 8638 220 CHECKERTAIL WAY
- TYNDALL AFB , FL 32403
- USA
- David Hackney
- david.hackney.1@us.af.mil
- Phone Number 8502838664
- Brice O'HARA
- brice.ohara.1@us.af.mil
- Phone Number 8502838639
- Sep 19, 2025 04:50 pm EDTSolicitation (Updated)
- Sep 19, 2025 04:48 pm EDT Solicitation (Original)
- Jul 09, 2025 12:00 am EDT Presolicitation (Original)
Related Document
| Sep 23, 2025 | [Solicitation (Updated)] Watercraft Operations and Maintenance |
See Also
Due 9/30/2026 3:00 pm US/Eastern Open IFB-54619 - Cummins Engine Diagnostic and Repair
Hillsborough Area Regional Transit (HART)
Due by 9/30/2026
Follow Sniper Comprehensive Advanced Targeting Pod (CATP2) Support and Sustainment Option Years 6
DEPT OF DEFENSE
Due by 11/20/2026
Negotiation Number Negotiation Type Title Open Date Preview Date Close Date Award Date
City of Lakeland
Due by 10/01/2026
Title: MDAD/MCC Work Order-Based Program-Emer/Priority Maintenance Const Services - Mechanical Opening Date: 10/18/2026
Miami-Dade County
Due by 10/18/2026