Water Well Redevelopment and Pump RepairNot Issued by Procurement Services

Agency: State Government of Ohio
State: Ohio
Type of Government: State & Local
NAICS Category:
  • 221310 - Water Supply and Irrigation Systems
  • 237110 - Water and Sewer Line and Related Structures Construction
Posted Date: Jan 23, 2020
Due Date: Jan 31, 2020
Solicitation No: CCI-RFQ
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Procurement Opportunity Search Detail

**Please Note** This opportunity was not issued by a DAS procurement program.
Please refer to the opportunity information in the attached document.

Opportunity Title

Water Well Redevelopment and Pump Repair

Opportunity Description

The Chillicothe Correctional Water System is requesting a quotation to service the three water supply wells that service the facility. The three wells are located adjacent to the Water Treatment Plant for Chillicothe Correctional facility.

General Information
Commodity Category 1:
Miscellaneous Commodities & Services
Commodity Category 2:
Water & Sewer Treatment Equipment, Supplies & Svcs
Opportunity Type:
Request For Quote
Opportunity Status:
Active
Document/Bid #:
CCI-RFQ
Requesting Agency:
Rehabilitation & Correction, Department of
Issued By:
Rehabilitation & Correction, Department of
Associated PDF Files
Document:
Dates
Posted Date:
1/23/2020
Inquiry Period:
1/23/2020 thru 1/30/2020 8:00:00 AM
Opening Date:
1/31/2020
Estimated Award Date:
2/14/2020
Procurement Programs
MBE Set Aside:
No
Open Market:
Yes
Other
Submit Inquiry:
View Q and A:

back

Attachment Preview

1/23/20
Request for Quotation
Water Well Redevelopment and Pump Repair
Quote Well FY20
The Chillicothe Correctional Water System is requesting a quotation to service the three water
supply wells that service the facility. The three wells are located adjacent to the Water
Treatment Plant for Chillicothe Correctional facility.
The facility has 3 gravel packed type wells that are 38” X 26” X 130 feet deep built with 30 linear
feet of 26” diameter screen. The pumps are vertical turbine pumps set on 70 feet of 8” X 1-1/2”
water lubricated column assembly, bowl assembly, and 15 feet of 10” suction pipe. Each
operates on a 75 HP, 1800 rpm VHS motor driven by a VFD. The wells and pumps are enclosed
in buildings with roof hatch for access. The intent of this project is to clean all 3 wells and repair
the associated vertical turbine pump to restore operational efficiency.
SCOPE OF WORK
The water well service contractor shall mobilize a cable tool drilling rig, or a pump service rig
fitted with an automatic surging apparatus to perform the work. Prior to removing the well
pump, the contractor shall perform a stepped flow test at 400, 800, and 1200 gpm and measure
& record flow, discharge pressure, and water levels in the well at each flow rate.
The contractor shall pull the pump from the well and lay the components on timbers of a hard
surface to avoid contact with the ground. Immediately after the pump is pulled, a down hole
survey shall be conducted to provide a visual image of the well casing and screen sections. The
pulled pump shall be transported to the contractor’s shop for complete inspection and
assessment of required repairs.
The Contractor shall provide pump component prices per the attached Pump Parts List. For
bidding purposes, the Owner shall use the total cost of pump parts to evaluate the pump repair
on a worse case basis.
The vertical hollow shaft motor shall also be transported to the contractor’s shop for complete
inspection and assessment of required repairs. The contractor shall have the motor’ cleaned,
dipped, and baked ‘and have new bearings installed as part of their price quotation. Also
include in your price a complete rewind for each motor.
The Contractor shall provide two quotes motor repair prices for the proposal evaluation. The
first shall be for a clean, dip, bake and bearing replacement, and the second shall be for a
Page 1 of 3
complete motor rewind (for VFD) with new bearings. This will assist the Owner in making a
worse case evaluation when evaluating proposals.
Cleaning the Wells
To clean the well, the contractor shall follow these steps in sequence,
1. Install air lift surge equipment and surge the entire length of the well screen to remove
loosened debris. The materials that are air lifted and discharged shall be discharged to
the grassy areas adjacent to the wells.
2. Following the air lift surge, the contractor shall inject muriatic acid solution into the well
while distributing the acid solution across the entire length of screen. After mixing for 1
hour, these chemicals shall remain in the well overnight.
3. The following morning, the well cleaning solution will be surged across the length of the
screen for a minimum of 3 hours. Afterwards, the well shall be simultaneously surged,
and air lifted to removed dissolved and loosened materials. All discharge fluids shall be
directed to a tank where neutralizing agents shall be added so the fluids discharged on
the grass area has a pH of 7.0 or greater.
4. Steps 2 and 3 shall be repeated so 2 separate doses of acid cleaning solution followed by
air lift surging are performed. For quotation purposes, the contractor shall include 275
gallons of muriatic acid per event for a total of 550 gallons of muriatic acid for the
cleaning of each well.
5. The next day the contractor shall continue to air lift surge the screened portion of the
well until debris are minimized or no further improvement in specific capacity can be
measured. For quotation purposes, the contractor should assume 12 hours of air lift
surging for this step.
6. The contractor shall remove surge equipment and conduct a post redevelopment down
hole survey of the casings and screen. A copy of the pre-service and the post-service
inspections shall be provided to Chillicothe Corrections facility in a format easily loaded
on a computer. After the video inspection, the well shall be disinfected with a chlorine
solution, so the resulting concentration is 50 ppm or greater.
7. The contractor shall install the repaired well pump and repaired motor and conduct a
post redevelopment performance flow test. These flow rates should be 400, 800, and
1200 gpm, if possible. The pump shall be reconnected to the system distribution piping.
NOTE: At no time shall there be more than 1 well out of service at any time to complete this
project.
At the completion of all field work, the contractor shall furnish Chillicothe Correctional Water
Treatment with pump installation reports, well flow test reports, bore hole survey copies, and
other documents detailing the work performed.
Purchase order and Service Contract
A Service Contract will need to be completed for this work before a purchase order will be
issued.
Page 2 of 3
Required Service Contract documents are Bureau of Worker Compensation Certificate, Proof of
Liability Insurance, Equal Employment Opportunity Certificate issued by Ohio Department of
Administrative Services. Sign a copy of Standards of Conduct form Department of Corrections.
Required Background Check and Training
All employees that will be working at the Chillicothe Correctional Water plant must submit 7
forms for a background check to be completed. After the background check is completed and
the employees are approved to work, they must receive Contractor Training before work can
begin. Training will not exceed 8 hours.
The training will be held at the Chillicothe Correctional wastewater plant. The date and time will
be agreed upon once the date to start work has been confirmed.
Duration of Quote
The quoted price will be valid until 06/30/2020. This will allow extra time needed to get State
of Ohio Controlling Board approval and a purchase order issued.
Quoted price needs to be emailed or mailed on or before 1/31/20. Please list you company
name and contact person with telephone number and email address when returning your
quote.
Email:
yolanda.cooks@odrc.state.oh.us
Mailing Address:
Chillicothe Correctional
Water Plant
PO Box 5500
Chillicothe, Ohio 45601
Contact Persons to schedule a visit.
Chillicothe Correctional Water Plant
Charlie Burton
Email: Charles.burton@odrc.state.oh.us
Mobile: 740-253-7033
AND
Eric Schleich
Email: eric.shleich@odrc.state.oh.us
Mobile: 740-253-7022
Page 3 of 3

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

High-Pressure Helium Commodity/Trailer Availability Request Active Contract Opportunity Notice ID 80GRC020RFIIP001 Related Notice

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

Bid Due: 3/06/2020

solicitation doc dept/buyer/category/solicitation type dates status Camargo Canyon Pump Station Elimination RFQ :

City of Cincinnati

Bid Due: 3/17/2020

Bid Number: IFB 20017D Bid Title: IFB 20017D - 9,200 LB GVWR Four-Wheel

City of Dayton

Bid Due: 3/05/2020