Water Treatment Plants 1 & 2 and Pollution Control Plant Sodium Hypochlorite Disinfection System

Agency: City of Jacksonville Beach
State: Florida
Type of Government: State & Local
NAICS Category:
  • 221310 - Water Supply and Irrigation Systems
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 541620 - Environmental Consulting Services
Posted Date: Apr 19, 2023
Due Date:
Solicitation No: 2223-05
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Bid Number: 2223-05
Bid Title: Water Treatment Plants 1 & 2 and Pollution Control Plant Sodium Hypochlorite Disinfection System
Category: BID's
Status: Open
Additional Status Information: Pending Council award
Bid Recipient: PW

Description:

The project is in the City of Jacksonville Beach and consists of the following general improvements at Water Treatment Plant (WTP) 1 and 2, and the Pollution Control Plant (PCP):

Conversion of the existing chlorine gas disinfection system to liquid sodium hypochlorite (12.5%) at all three facilities. At each facility, the existing chlorine gas one-ton cylinders and pumps will be demolished, and the new hypochlorite systems installed, including double-wall storage tanks, new pump skid systems, and all necessary piping, electrical and instrumentation work as detailed on the plans. Prior to demolition of the existing chlorine gas system, the contractor shall furnish, install, and pipe to new pump skids a temporary bulk double-wall storage tank as shown on the plans to allow for continuous disinfection. Contractor shall also include chemical and delivery during the temporary system and shall ensure that prompt supply is maintained during the project. Once the new system is installed and is ready for operation, contractor shall ensure that all chemical storage tanks are full of hypochlorite solution. All cost for chemical shall be included on the total base bid.

Once the new hypochlorite disinfection system has been installed and proven to meet staff expectations and regulatory requirements, the Contractor will remove the existing gaseous chlorine storage, feed facilities, and install the permanent sodium hypochlorite systems. At the PCP, the existing concrete chlorine contact basins will be improved to add concrete wall baffles and eliminate short-circuiting. The basins will also receive other improvements a detailed on the plans. Improvements also include replacing existing architectural mason concrete blocks at the WTPs’ chlorine storage rooms with solid-face concrete mason blocks, as well as the replacement of the existing chain-link gates with new aluminum gates as currently exist at the PCP chlorine storage room.

Work also includes the furnishing and installation of two (2) 14-inch butterfly Valves at the SBR air piping system and the furnishing and installation of four (4) air-control valves to regulate the air to each of the SBR basins. The existing 12-inch butterfly valves used for that purpose will be converted from automatic to manual and remain as isolation valves. The existing mass flow meter will be relocated upstream of the new control valve as shown on the plans.

Publication Date/Time:
4/19/2023 7:30 AM
Publication Information:
Daily Record & Observer and City Website
Closing Date/Time:
Open Until Contracted
Submittal Information:
Response to be delivered to 1460A Shetter Avenue
Bid Opening Information:
Opened publicly
Pre-bid Meeting:
Yes
Contact Person:
Property and Procurement Division via email to purchasing@jaxbchfl.net
Download Available:
Yes
Fee:
N/A
Business Hours:
8:00am - 4:00pm
Qualifications:
Each bid must contain either evidence of the Bidder’s qualifications to do business in the area where the project is located or covenant to obtain such qualifications prior to award of Contract. To demonstrate his qualifications to perform the Work, each Bidder shall submit with his Bid written evidence as to his financial status, previous successful contractual and technical experience in similar work including references, description, and volume of present commitments, evidence of possession of, or covenant to obtain prior to award of Contract, valid state, county, and local licenses covering all operations and all areas of political jurisdiction involved in the Work of this project and such other data as may be requested by the CITY. No bidder/company will be issued a contract for the work, who in the past seven (7) years has filed for bankruptcy personally or has been an owner/officer or principal of a firm, which has filed bankruptcy in the past seven (7) years.

Contractor must be able to exhibit to the City of Jacksonville Beach that he can perform a minimum of 40% of the total contract work with their own labor work force. The purchase of materials and/or equipment will not be considered as part of this percentage.

Related Documents:

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Contract Solicitation Number: Bid 24-405 Start Date: End Date Open Date: May 15,

Polk County

Bid Due: 5/15/2024

Killian Water Treatment Plant Upgrade OPEN 24-CG00730/JG 2 4/10/2024 6/3/2024

Hernando County

Bid Due: 6/03/2024

solicitation doc dept/buyer/category/solicitation type dates status REQ FOR PRE-QUAL OF VENDORS FOR LABORATORY

Palm Beach County

Bid Due: 3/25/2029

Bid 4060MF Water Softener Salt Service, Term Contract Deadline for Receipt of Bid

Marion County Public Schools

Bid Due: 5/29/2024