Water Treatment
| Agency: | The New York State Contract Reporter |
|---|---|
| State: | New York |
| Type of Government: | State & Local |
| NAICS Category: |
|
| Posted Date: | Oct 10, 2025 |
| Due Date: | Nov 3, 2025 |
| Original Source: | Please Login to View Page |
| Contact information: | Please Login to View Page |
| Bid Documents: | Please Login to View Page |
Description
Description: Overview Contractor shall provide all labor, materials and equipment for sampling, testing, chemical treating and reporting all results for the following open and closed loop water systems within SUNY New Paltz campus. The lists below are broken down into two categories, cooling systems and heating systems. Testing Legionella: NYS requires all cooling towers to be tested every 90 days for Legionella during its annual or seasonal operation. It should be cultured and analyzed at a NYS ELAP certified facility. Responsibility for the physical mechanical cleaning of the cooling towers detailed on page 22 of the IFB (4. Procedure for Cleaning Cooling Towers and Related Equipment Inspect all water-contact areas for sediment, sludge, and scale. Using brushes and/or a low pressure water hose, thoroughly clean all CT/EC water-contact areas, including the basin, sump, fill, spray nozzles, and fittings. Replace components as needed.) The College campus is responsible for cleaning the towers.
Cooling Towers Contractor shall follow all aspects of SUNY New Paltz’s “Cooling Tower Management Program”. Refer to attached 222 page document for details. File name: “SUNY New Paltz CTMP Updated 04-01-2019”. In sum, there are seven cooling tower systems (total of 11 cells). All seven cooling tower systems have WalChem WT600-CT controllers that can be monitored and operated via cellular. They Operate from May 1 st to October 1 st except for the Central Heating Plant (CHP) which operates year round. Due Date: 11/03/2025 2:00 PM Contract Term: 5 Year Location: SUNY New Paltz Ad Type: General
|
See Also
RFB Number Title Due Date Buyer RFB-WC-26277 Liquid Blended Orthophosphate 09/24/26 Valsala Panicker
Westchester County
Due by 9/24/2026
Liquid Sodium Hypochlorite Click here for details. Due: September 25, 2026 by 11
Monroe County Water Authority
Due by 9/25/2026
CRO-661 82626WS00022 Start Date: 8/17/2026 Bid Date: 9/16/2026 Supply and Delivery of Sulfuric
City of New York
Due by 9/16/2026
26 Title: ROCK SALT & ICE MELT CR#: 2138614 Agency: Buffalo Board of
The New York State Contract Reporter
Due by 9/21/2026