Water Tower Level Control Valve Replacement

Agency: City of Kalamazoo
State: Michigan
Type of Government: State & Local
NAICS Category:
  • 237110 - Water and Sewer Line and Related Structures Construction
  • 238220 - Plumbing, Heating, and Air-Conditioning Contractors
  • 332911 - Industrial Valve Manufacturing
Posted Date: Sep 21, 2023
Due Date: Oct 19, 2023
Solicitation No: Reference number: 91244-029.0
Bid Source: Please Login to View Page
Contact information: Please Login to View Page
Bid Documents: Please Login to View Page
Water Tower Level Control Valve Replacement

Closing date October 19, 2023, 03:00 PM

  • Reference number 91244-029.0
  • Status Open
  • Summary It is the intent of these plans and specifications to provide for a contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for Tank Level Control Valve Replacement at Gull Water Tower and Beech Water Tower as described in the specifications and bid document.

91244-029.0 Bid Document (PDF, 6MB)

91244-029.0 Distribution List (PDF, 40KB)

91244-029.0 Plans (PDF, 3MB)

NON-MANDATORY PRE-BID MEETING/SITE INSPECTIONS – Tuesday, October 3, 2023, at 10:00 a.m. Location: Gull Road Water Tower

7837 Gull Road, Richland, MI 49083

SCOPE OF WORK

The project involves the replacement of existing altitude valves and associated fittings at two water towers with new motor actuated butterfly valves and associated pipe and fittings as provided in these specifications, drawings and as detailed on the included Harold Beck and Sons, Inc, Quotes # RLG-23-151806 and RLG-23-151808. Alternative valves and/or actuators shall not be allowed.

Contractor is responsible for:

  1. All removals;
  2. Purchase and installation of the new actuated butterfly valves, supports, pipe and fittings, including disinfection of all pipe, fittings and valves immediately before installation;
  3. Disposing/recycling all removed valves, pipe, fittings, etc.;
  4. Providing all necessary equipment, labor and supplies to complete the project;
  5. Verifying the weight of existing valves prior to beginning the work and ensuring provided equipment is capable of safely lifting, transporting and loading existing valves, etc.;
  6. Verifying the accuracy of all measurements and ensuring that supplied and installed equipment is in compliance with project specifications and drawings and City of Kalamazoo Standard Specifications for Water Main and Service Installation 2021; and
  7. Cutsheets shall be provided to City for review and approved by the City prior to Contractor mobilization.

Upon completion of an acceptable pressure test, the City will perform bacteriological sampling of installed pipe and fittings (at no cost to the Contractor). Contractor is responsible for re-disinfecting and flushing until acceptable bacteriological sample results are obtained. City will perform all electrical work.

Keeping the water towers in service during construction is preferred. If this is not possible, the Contractor shall conduct their work in such a manner that each water tower is offline for no longer than one week each, including 72 hours for sampling and analysis. In no event, shall both water towers be offline at the same time.

Sign-up for a Free Trial, Government Bid Alerts

With Free Trial, you can:

You will have a full access to bids, website, and receive daily bid report via email and web.

Try One Week FREE Now

See Also

Job Number Job Name Engineer Estimate Bid Date Bid Time 00553 Village of

U.P. Engineers & Architects, Inc

Bid Due: 5/16/2024

626 CHESTER INSTALL BASEMENT DRAIN SYSTEM Sealed proposals for 626 CHESTER INSTALL BASEMENT

City of Jackson

Bid Due: 5/10/2024

Springfield Avenue Water Main Replacement Closing date May 15, 2024, 03:00 PM Reference

City of Kalamazoo

Bid Due: 5/15/2024

RFP - H. H. DOW HIGH SCHOOL BOILER REPLACEMENT Apr 30 2024 2

Midland Public Schools

Bid Due: 5/14/2024