Closing date
May 19, 2026, 03:00 PM
MANDATORY PRE-BID MEETING- May 5, 2026, 10:00 a.m. (Local Time)
Location: 5999 S 9th Street, Kalamazoo, MI 49009
City Of Kalamazoo Water Station 24
Roofing Project
PART 1 GENERAL
1.01 DESCRIPTION
A. The project is located at 6059 South 9th Street Kalamazoo MI 49009. Marcus Kiste, Project
Manager/Coordinator, is the Owner's Representative and may be contacted regarding any questions, phone
616-252-9276.
B. The project consists of installing Carlisle's Sure-Seal (black) Adhered Roofing System as outlined below:
Remove all existing ballast and roofing material down to the deck. Installation of VapAir Seal 725 to
concrete decking. Using Carlisles Flexible Fast Adhesive, install new two(2) layers of 2.6" insulation
meeting r-value 30 with saddles between the drains. Install a fully adhered Carlisle 60 mil system following
the manufactures specifications.
1.02 EXTENT OF WORK
A. Provide all labor, material, tools, equipment, and supervision necessary to complete the installation of a
Sure-Seal 60 mil EPDM membrane Fully Adhered Roofing System, including flashings and insulation as
specified herein and as indicated on the drawings in accordance with the manufacturer's most current
specifications and details.
B. The roofing contractor shall be fully knowledgeable of all requirements of the contract documents and shall
make themselves aware of all job site conditions that will affect their work.
C. The roofing contractor shall confirm all given information and advise the building owner, prior to bid, of
any conflicts that will affect their cost proposal.
D. Any contractor who intends to submit a bid using a roofing system other than the approved manufacturer
must submit for pre-qualification in writing fourteen (14) days prior to the bid date. Any contractor who
fails to submit all information as requested will be subject to rejection. Bids stating "as per plans and
specs" will be unacceptable.
1.03 SUBMITTALS
A. Prior to starting work, the roofing contractor must submit the following:
1. Shop drawings showing layout, details of construction, and identification of materials.
2. Sample of the manufacturer's Total Systems Warranty covering all components of the roofing
system.
3. Submit a letter of certification from the manufacturer that certifies the roofing contractor is
authorized to install the manufacturer's roofing system and lists foremen who have received
training from the manufacturer, along with the dates training was received.
4. Certification of the manufacturer's warranty reserve.
B. Upon completion of the installed work, submit copies of the manufacturer's final inspection report to the
specifier prior to the issuance of the manufacturer's warranty.
1
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Deliver materials to the job site in the manufacturer's original, unopened containers or wrappings with the
manufacturer's name, brand name, and installation instructions intact and legible. Deliver in sufficient
quantity to permit work to continue without interruption.
B. Comply with the manufacturer's written instructions for proper material storage.
1. Store materials between 60 degreesF and 80 degreesF in dry areas protected from water and direct sunlight. If
exposed to a lower temperature, restore to 60 degreesF minimum temperature before using.
2. Store materials containing solvents in dry, well-ventilated spaces with proper fire and safety
precautions. Keep lids on tight. Use before the expiration of their shelf life.
C. Insulation and underlayment products must be on pallets, off the ground, and tightly covered with
waterproof materials. The manufacturer's wrap does not provide sufficient waterproofing. Insulation and
underlayment products that become wet or saturated are to be discarded.
D. Any materials that are found to be damaged shall be removed and replaced at the applicator's expense.
1.05 WORK SEQUENCE
A. Schedule and execute work to prevent leaks and excessive traffic on completed roof sections. Care should
be exercised to provide protection for the interior of the building and to ensure water does not flow beneath
any completed sections of the membrane system.
B. Do not disrupt activities in occupied spaces.
1.06 USE OF THE PREMISES
A. Before beginning work, the roofing contractor must secure approval from the building owner's
representative for the following:
1. Areas permitted for personnel parking.
2. Access to the site.
3. Areas permitted for storage of materials and debris.
4. Areas permitted for the location of cranes, hoists, and chutes for loading and unloading materials
to and from the roof.
B. Interior stairs or elevators may not be used for removing debris or delivering materials, except as
authorized by the building superintendent.
1.07 EXISTING CONDITIONS
If discrepancies are discovered between the existing conditions and those noted on the drawings, immediately notify
the owner's representative by phone and solicit the manufacturer's approval prior to commencing with the work.
Necessary steps shall be taken to make the building watertight until the discrepancies are resolved.
2
1.08 TEMPORARY FACILITIES AND CONTROLS
A. Temporary Utilities:
1. Water, power for construction purposes, and lighting are not available at the site and will not be
made available to the roofing contractor.
2. Provide all hoses, valves, and connections for water from the source designated by the owner
when made available.
3. When available, electrical power should be extended as required from the source. Provide all
trailers, connections, and fused disconnects.
B. Temporary Sanitary Facilities
Sanitary facilities will not be available at the job site. The roofing contractor shall be responsible for the
provision and maintenance of portable toilets or their equal.
C. Building Site:
1. The roofing contractor shall use reasonable care and responsibility to protect the building and site
against damage. The contractor shall be responsible for the correction of any damage incurred as
a result of the performance of the contract.
2. The roofing contractor shall remove all construction debris from the job site in a timely and legally
acceptable manner so as to not detract from the aesthetics or the functions of the building.
D. Security:
Obey the owner's requirements for personnel identification, inspection, and other security measures.
1.09 JOB SITE PROTECTION
A. The roofing contractor shall adequately protect the building, paved areas, service drives, lawn, shrubs,
trees, etc., from damage while performing the required work. Provide canvas, boards, and sheet metal
(properly secured) as necessary for protection and remove protection material at completion. The
contractor shall repair or be responsible for costs to repair all property damaged during the roofing
application.
B. During the roofing contractor's performance of the work, the building owner will continue to occupy the
existing building. The contractor shall take precautions to prevent the spread of dust and debris,
particularly where such material may sift into the building. The roofing contractor shall provide labor and
materials to construct, maintain, and remove necessary temporary enclosures to prevent dust or debris in
the construction area(s) from entering the remainder of the building.
C. Do not overload any portion of the building, either by use of or placement of equipment, storage of debris,
or storage of materials.
D. Protect against fire and flame spread. Maintain proper and adequate fire extinguishers.
E. Take precautions to prevent drains from clogging during the roofing application. Remove debris at the
completion of each day's work and clean drains, if required. At completion, test drains to ensure the
system is free running and drains are watertight. Remove strainers and plug drains in areas where work is
in progress. Install flags or other telltales on plugs. Remove plugs each night and screen drain.
F. Store moisture-susceptible materials above ground and protect with waterproof coverings.
3
G. Remove all traces of piled bulk materials and return the job site to its original condition upon completion of
the work.
1.10 SAFETY
The roofing contractor shall be responsible for all means and methods as they relate to safety and shall comply with
all applicable local, state, and federal requirements that are safety-related. Safety shall be the responsibility of the
roofing contractor. All related personnel shall be instructed daily to be mindful of the full-time requirement to
maintain a safe environment for the facility's occupants, including staff, visitors, customers, and the occurrence of
the general public on or near the site.
1.11 WORKMANSHIP
A. Applicators installing new roof, flashing, and related work shall be factory trained and approved by the
manufacturer they are representing.
B. All work shall be of the highest quality and in strict accordance with the manufacturer's published
specifications and to the building owner's satisfaction.
C. There shall be a supervisor on the job site at all times while work is in progress.
D. All field seams and flashing details are to be completed according to the manufacturer's specifications and
details by the end of each workday.
1.12 QUALITY ASSURANCE
A. The Sure-Seal Roofing System must achieve a UL Class A.
B. The membrane must be manufactured by the material supplier. Manufacturers' supplying membrane made
by others are not acceptable without prior written approval 10 days before the bid date.
C. The manufacturer must have a minimum of 30 years of experience in the manufacturing of vulcanized,
white, or black, thermoset sheeting.
D. Unless otherwise noted in this specification, the roofing contractor must strictly comply with the
manufacturer's current specifications and details.
E. The roofing system must be installed by an applicator authorized and trained by the manufacturer in
compliance with shop drawings as approved by the manufacturer. The roofing applicator shall be
thoroughly experienced and, upon request, be able to provide evidence of having at least five (5) years of
successful experience installing single-ply EPDM roofing systems and having installed at least one (1)
EPDM roofing application or several similar systems of equal or greater size within one year.
AND
The applicator shall, upon request, be able to document three (3) installations completed more than two
years prior to issuance of the contract documents, utilizing components of the proposed manufacturer that
are comparable to those required for the work and similar in scope and complexity. Provide complete
contact information, warranty history for previous installations, and demonstrate in-service performance.
F. Provide an adequate number of experienced workmen regularly engaged in this type of work who are
skilled in the application techniques of the materials specified. Provide at least one thoroughly trained and
experienced superintendent on the job at all times when roofing work is in progress.
G. There shall be no deviations made from this specification or the approved shop drawings without the prior
written approval of the specifier. Any deviation from the manufacturer's installation procedures must be
4
supported by a written certification on the manufacturer's letterhead and presented for the specifier's
consideration.
H. Upon completion of the installation, the applicator shall arrange for an inspection to be made by a non-sales
technical representative of the membrane manufacturer in order to identify any needed corrective repairs
that will be required for warranty issuance. Notify the building owner seventy-two (72) hours prior to the
manufacturer's final inspection.
I. The inspector shall be employed and trained by the manufacturer and have received product-specific
training from the manufacturer of the products.
J. The Sure-Seal EPDM Membrane exceeds 41,580 kJ/m2 under Xenon-Arc UV Light testing used for
testing "Resistance to Outdoor (Ultraviolet) Weathering." (ASTM D 4637 Specification requires a 7560
kJ/m2 minimum total radiant exposure at 70 W/m2 irradiance at 176 degreesF black panel temperature to
pass.)The membrane shows no visible signs of cracking or crazing.
K. The Sure-Tough EPDM Membrane exceeds 35,320 kJ/m2 under Xenon-Arc UV Light testing used for
testing "Resistance to Outdoor (Ultraviolet) Weathering." (ASTM D 4637 Specification requires a 7560
kJ/m2 minimum total radiant exposure at 70 W/m2 irradiance at 176 degreesF black panel temperature to
pass.)The membrane shows no visible signs of cracking or crazing.
L. Sure-Seal, Sure-White, or Sure-Tough EPDM Membranes achieve a zero (no growth) rating in the
ASTM G21 test for fungi growth.
1.13 JOB CONDITIONS, CAUTIONS AND WARNINGS
Refer to Carlisle's EPDM Roofing System specification for General Job Site Considerations.
A. Safety Data Sheets (SDS) must be on location at all times during the transportation, storage and application
of materials.
B. When positioning membrane sheets, exercise care to locate all field splices away from low spots and out of
drain sumps. All field splices should be shingled to prevent bucking of water.
C. When loading materials onto the roof, the Carlisle Authorized Roofing Applicator must comply with the
requirements of the building owner to prevent overloading and possible disturbance to the building
structure.
D. Proceed with roofing work only when weather conditions are in compliance with the manufacturer's
recommended limitations, and when conditions will permit the work to proceed in accordance with the
manufacturer's requirements and recommendations.
E. Proceed with work so new roofing materials are not subject to construction traffic. When necessary, new
roof sections shall be protected and inspected upon completion for possible damage.
F. Provide protection, such as 3/4 inch thick plywood, for all roof areas exposed to traffic during construction.
Plywood must be smooth and free of fasteners and splinters.
G. The surface on which the insulation or roofing membrane is to be applied shall be clean, smooth, dry, and
free of projections or contaminants that would prevent proper application of or be incompatible with the
new installation, such as fins, sharp edges, foreign materials, oil, and grease.
H. New roofing shall be complete and weathertight at the end of the work day.
I. Contaminants such as grease, fats, and oils shall not be permitted to come in direct contact with the roofing
membrane. An overlay of Epichlorohydrin membrane must be adhered around units that have the potential
5
to emit solvents, grease, or oil.
1.14 WARRANTY
A. Provide manufacturer's 20-year Total System Warranty covering both labor and all materials with no dollar
limitation. The maximum wind speed coverage shall be peak gusts of 55 mph measured at 10 meters above
ground level. Certification is required with bid submittal, indicating the manufacturer has reviewed and
agreed to such wind coverage.
B. Pro-rated System Warranties shall not be accepted.
PART 2 PRODUCTS
2.01 GENERAL
A. All components of the specified roofing system shall be products of Carlisle SynTec or accepted by Carlisle
SynTec as compatible.
B. Unless otherwise approved by the specifier and accepted by the membrane manufacturer, all products
(including insulation, fasteners, fastening plates, and edgings) must be manufactured and supplied by the
roofing system manufacturer and covered by the warranty.
AND
The manufacturer of the roof membrane shall also manufacture all polymeric components for the roofing
system, including, but not limited to, membrane, adhesives, primers, flashings, caulks, and tapes.
2.02 MEMBRANE
Furnish Sure-Seal 60 mil EPDM (Ethylene, Propylene, Diene Terpolymer) in the largest sheet possible with 3"
Factory-Applied Tape (FAT). (Splice tape shall be a butyl/EPDM-based polymer with a minimum thickness of 25
mil.) The membrane shall conform to the minimum physical properties of ASTM D4637. When a 10-foot-wide
membrane is to be used, the membrane shall be manufactured in a single panel with no factory splices to reduce
splice intersections.
2.03 INSULATION/UNDERLAYMENT
A. When applicable, insulation shall be installed in multiple layers. The first and second layer of insulation
shall be adhered to the substrate in accordance with the manufacturer's published specifications.
B. Insulation shall be (2) two layers of 2.6" Polyisocyanurate as supplied by Carlisle SynTec. The minimum
R-value required is 30. Tapered saddles to the drains will also be required. (Note: The insulation must
meet ASHRAE 90.1 minimums per IBC-International Building Code.)
1. Carlisle Insulbase Polyisocyanurate - A foam core insulation board covered on both sides with a
medium-weight fiber-reinforced felt facer meeting ASTM C 1289-06, Type II, Class 1, Grade 2
(20 psi) or Grade 3 (25 psi). The product is available in 4' x 8' standard size with a thickness from
1 to 4 inches. 4' x 4' tapered panels are also available.
2.04 FASTENING COMPONENTS
To be used for mechanical attachment of pressure sensitive russ strip and securement at curbs:
6
A. Fasteners, Plates, and Bars
1. HP- Fasteners: a threaded, #14 fastener with a #3 phillips drive used with steel and wood roof decks.
2. Pre-Assembled ASAP Fasteners: A pre-assembled 3" diameter Plastic Plate and # 12 threaded fastener
with a #3 drive used for insulation attachment into steel or wood decks. Installed using OMG Fastening
Tools.
3. HP Term Bar Nail-Ins: A 1-1/4" long expansion anchor with a zinc-plated steel drive pin used for
fastening the Carlisle Termination Bar or Seam Fastening Plates to concrete, brick, or block walls.
4. Seam Fastening Plate: a 2" diameter metal fastening plate used in conjunction with RUSS or EPDM
membrane for additional membrane securement.
5. Polymer Seam Plate: a 2" diameter plastic fastening plate incorporating barbs on the underside of the
plate. This plate is required for membrane and RUSS attachment installed in conjunction with steel roof
decks. It may also be used for insulation attachment.
6. Insulation Fastening Plates: a nominal 3-inch diameter plastic or metal plate used for insulation
attachment.
7. Sure-Seal Pressure-Sensitive RUSS(TM) (Reinforced Universal Securement Strip): a 6" wide, nominal
45-mil thick clean, cured black reinforced EPDM membrane with 3" wide SecurTAPE laminated along one
edge. The 6" wide Pressure-Sensitive RUSS is used horizontally or vertically at the base of walls, curbs,
etc., in conjunction with 2" diameter securement plates or bars below the EPDM deck membrane for
additional membrane securement.
B. Insulation Adhesives
1. Flexible FAST Adhesive: An elongating impact impact-resistant, two-component insulating urethane
adhesive used to attach insulation. Packaging formats include 50 and 15-gallon drums as well as Dual
Tanks, Dual Cartridges, and 5-gallon Jug formats.
a. Adhesive to provide 150% elongation in conjunction with fleece-backed membrane - ASTM D412
b. MDI content of Part A material less than 25%
2.05 ADHESIVES, CLEANERS AND SEALANTS
All products shall be furnished by Carlisle and specifically formulated for the intended purpose.
A. 90-8-30A Bonding Adhesive: A high-strength, yellow colored, synthetic rubber adhesive used for bonding
Sure-Seal/Sure-White EPDM membranes to various surfaces. Available in 5-gallon pails.
B. Carlisle Weathered Membrane Cleaner: A clear, solvent-based cleaner used to loosen and remove dirt and
other contaminants from the surface of exposed EPDM membrane (for repairs, etc.) prior to applying EPDM
Primer. Weathered Membrane Cleaner can also be used when applying Splicing Cement. Available in 1 and
5-gallon pails.
C. HP-250 EPDM Primer: A solvent-based primer used to prepare the surface of EPDM membrane for
application of Splice Tape or Pressure-Sensitive products. Available in 1 or 3 gallon pails and as CAV-PRIME
Pressurized Cylinders.
D. Low-VOC EPDM Primer - A low-VOC (volatile organic compound) primer (less than 250 grams/liter) for use
with SecurTape or Pressure-Sensitive products. Available in 1 or 3 gallon pails and as CAV-PRIME Pressurized
Cylinders.
7
E. Lap Sealant: A heavy-bodied material used to seal the exposed edges of a membrane splice. Available in
tubes.
1. Sure-Seal Lap Sealant is a black sealant for use with Sure-Seal (black) Roofing Systems.
2. Sure-White Lap Sealant is a white sealant for use with Sure-White (white-on-black) Roofing Systems.
F. Water Cut-Off Mastic: A one-component, low viscosity, self-wetting, Butyl blend mastic used to achieve a
compression seal between the EPDM membrane or Elastoform Flashing and applicable substrates. Available in
tubes.
G. Pourable Sealer: A black, two-component, solvent-free, polyurethane-based product used for tie-ins and as a
sealant around hard-to-flash membrane penetrating objects such as clusters of pipes and for a daily seal when
the completion of flashings and terminations cannot be completed by the end of each work day.
H. One-Part Pourable Sealer: Available in black or white, a one-component, moisture-curing, elastomeric
polyether sealant used for attaching lightning rod bases and ground cable clips to the membrane surface and as a
sealant around hard-to-flash penetrations such as clusters of pipes.
I. Universal Single-Ply Sealant A one-part polyether, non-sagging sealant designed for sealing expansion joints,
control joints, and counterflashings. Available in white only.
J. CAV-GRIP III Low-VOC Aerosol Contact Adhesive/Primer: a low-VOC, methylene chloride-free adhesive
that can be used for a variety of applications, including: enhancing the bond between Carlisle's VapAir Seal
725TR and various substrates, priming unexposed asphalt prior to applying Flexible FAST Adhesive, adhering
Sure-Seal EPDM, horizontally, for the field of the roo,f and for adhering Sure-Seal FleeceBACK and Sure-Seal
EPDM membrane to vertical walls. Coverage rate is approximately 2,000-2,500 sq. ft. per #40 cylinder and
4,000-5,000 sq. ft. per #85 cylinder as a primer, in a single-sided application, and 750 sq. ft. per #40
cylinder and 1,500 sq. ft. per #85 cylinder as an adhesive for vertical walls, in a double-sided application.
2.06 METAL EDGING AND MEMBRANE TERMINATIONS
A. General: All metal edgings shall be tested and meet ANSI/SPRI ES-1 standards and comply with the
International Building Code. All metal work is to be supplied and warranted by the manufacturer.
B. Termination Bar: a 1" wide and .098" thick extruded aluminum bar pre-punched 6" on center;
incorporates a sealant ledge to support Lap Sealant and provide increased stability for membrane
terminations.
2.07 WALKWAYS
Protective surfacing for roof traffic shall be Sure-Seal (black) Pressure-Sensitive Walkway Pads (with
Factory-Applied Tape on the underside of the walkway) adhered to the membrane surface in conjunction with
Sure-Seal Primer.
2.08 OTHER MATERIALS
A. Carlisle VapAir Seal 725
Carlisle's VapAir Seal 725TR Air and Vapor Barrier/Temporary Roof is a 40-mil composite consisting of
35 mils of self-adhering rubberized asphalt laminated to a 5-mil woven polypropylene film.
PART 3 EXECUTION
8
3.01 GENERAL
A. Comply with the manufacturer's published instructions for the installation of the membrane roofing system,
including proper substrate preparation, jobsite considerations, and weather restrictions.
B. Position sheets to accommodate contours of the roof deck and shingle splices to avoid bucking water.
3.02 VAPOR RETARDERS
A. General:
The use of a vapor retarder to protect insulation and reduce moisture accumulation within an insulated
roofing assembly should be investigated, especially on projects with high interior humidity, such as,
swimming pools, breweries, pulp mills, etc.
B. In the generally temperate climate of the United States, during the winter months, water vapor flows
upward from a heated, more humid interior toward a colder, drier exterior. Vapor retarders are more
commonly required in northern climates than in southern regions, where downward vapor pressure may be
expected and the roofing membrane itself becomes the vapor retarder.
C. On cold storage/freezer facilities, the perimeter details must be selected to provide an air seal and prevent
outside air from infiltrating and condensing within the roofing assembly.
D. Consult the latest publications by ASHRAE (American Society of Heating, Refrigerating and
Air-Conditioning Engineers, Inc.) and NRCA (National Roofing Contractors Association) for specific
information.
E. If insulation is to be adhered to the vapor retarder with Flexible FAST Adhesive, the 725TR vapor retarder
must be compatible and shall be fully adhered to the substrate. Available products include Carlisle supplied
"peel and stick" rubberized asphalt membrane with compatible film coating (Carlisle VapAir Seal 725TR
Air and Vapor Barrier), and spray or roller applied butyl coatings. Installation requirements for Carlisle's
VapAir Seal 725TR Air and Vapor Barrier are identified in Carlisle's published specification.
F. VapAir Seal 725 TR Installation:
1. Surface Preparation: The concrete surface shall be completely dry; dryness shall be determined by a qualified
owner's representative. The surface shall have a smooth finish and be free of voids, spalled areas, sharp
protrusions, loose aggregate, laitance and form-release agents. Some curing compounds may interfere with
proper adhesion, so an adhesion test is recommended. In the event of rain, concrete must be allowed to dry
before the application of primer. Artificial drying methods such as torches are not acceptable.
2. Adhesive: Surfaces to receive VapAir Seal 725TR must be clean and dry. Use of CAV-GRIP III, CCW-702 or
CCW-702LV is required on all substrates. Approved Carlisle adhesives for attaching insulation to VapAir Seal
725TR are: Flexible FAST Adhesive and OlyBond 500.
3. Application: VapAir Seal 725TR material must be stored and kept above 60 degreesF prior to installation. Apply
VapAir Seal 725TR from low to high points in a shingle fashion so that the laps will shed water. Overlap all
edges by at least 2". End laps should be staggered. Position the membrane carefully to avoid fish-mouths and
wrinkles. Roll the VapAir Seal 725TR membrane immediately after installation with a 100 - 150-pound roller
wrapped in a resilient material. When the VapAir Seal 725TR is applied to a vertical surface, hand-rolling with
a2" or 4" hand roller is required. Vertical surfaces must be prepared inthe same fashion as horizontal surfaces
9
3.03 INSULATION PLACEMENT
A. Install insulation or membrane underlayment over the substrate with boards butted tightly together with no
joints or gaps greater than 1/4 inch. Stagger joints both horizontally and vertically if multiple layers are
provided.
B. Secure insulation to the substrate with the required mechanical fasteners or insulation adhesive Carlisle
Flexible FAST Adhesive in accordance with the manufacturer's specifications.
3.04 MEMBRANE PLACEMENT AND BONDING
A. Unroll and position the membrane without stretching. Allow the membrane to relax for approximately 1/2
hour before bonding. Fold the sheet back onto itself so half the underside of the membrane is exposed.
B. Apply the Bonding Adhesive in accordance with the manufacturer's published instructions and coverage
rates, to both the underside of the membrane and the substrate. Allow the adhesive to dry until it is tacky
but will not string or stick to a dry finger touch.
1. Roll the coated membrane into the coated substrate while avoiding wrinkles. Brush down the bonded
half of the membrane sheet with a soft bristle push broom to achieve maximum contact.
2. Fold back the unbonded half of the membrane sheet and repeat the bonding procedure.
C. Install adjoining membrane sheets in the same manner, overlapping edges approximately 4 inches. Do not
apply bonding adhesive to the splice area.
3.05 MEMBRANE SPLICING
A. Position the membrane sheet to allow for the required splice overlap. Mark the bottom sheets with an
indelible marker approximately 1/4" to 1/2" from the top sheet edge. The pre-marked line on the
membrane edge can also be used as a guide for positioning splice tape.
B. When the membrane is contaminated with dirt, fold the top sheet back and clean the dry splice area
(minimum 3" wide) of both membrane sheets by scrubbing with clean natural fiber rags saturated with
Sure-Seal Weathered Membrane Cleaner. When using Sure-Seal (black) PRE-KLEENED membrane,
cleaning the splice area is not required unless contaminated with field dirt or other residue.
C. Apply EPDM Primer to the splice area and permit to flash off. Primer must be applied to both the top
membrane layer and the bottom membrane layer.
D. When adhering Factory Applied Tape (FAT), pull the poly backing from FAT beneath the top sheet and
allow the top sheet to fall freely onto the exposed primed surface. Press the top sheet onto the bottom sheet
using firm even hand pressure across the splice towards the splice edge
E. For end laps, apply 3" or 6" SecurTAPE to the primed membrane surface in accordance with the
manufacturer's specifications. Remove the poly backing and roll the top sheet onto the mating surface.
F. Tape splices must be a minimum of 2-1/2" wide using 3" wide (Butyl/EPDM) SecurTAPE that is a
minimum 25-mil thick. SecurTAPE must extend 1/8" minimum to 1/2" maximum beyond the splice edge.
Field splices at roof drains must be located outside the drain sump.
Note: For projects where a 90-mil membrane OR a 20-year or longer System Warranty is specified,
splice enhancements are required. Refer to Carlisle Sure-Seal/Sure-White Roofing System Specification.
G. Immediately roll the splice using positive pressure when using a 2" wide steel roller. Roll across the splice
10
With Free Trial, you can:
You will have a full access to bids, website, and receive daily bid report via email and web.
Follow VGLZ 242016 B164 HVAC REPAIR Active Contract Opportunity Notice ID W50S8526BA005 Related
DEPT OF DEFENSE
RFQQ 184412,1: BN: RESIDENTIAL CONSTRUCTION CONTRACTOR REQUEST FOR QUALIFICATIONS Close Date 2/28/29 3:00
City of Detroit
Bid Due: 2/28/2029
Replacement of Roof of the Administration Building Request for Proposal For Replacement of
Montcalm County
Bid Due: 8/17/2026
Description: MCIC RTU Replacement Project Department: Genesee Intermediate School District Buyer: Megan Sturk
State of Michigan
Bid Due: 8/04/2026